Table 13.3 Thickness of pitching (T) for loose stone protection in millimetres (2)


Type of river bed material







River slope (m/km)




























0.05

0.15




0.20

0.30

0.40





































Very coarse

400

500




550

650

700




Coarse

550

650




700

800

850




Medium

700

800




850

950

1100




Fine

850

950




1000

1100

1150




Very fine

1000

1100




1150

1250

1300



























The depth of scour holes, calculated from Lacey’s equation, is to be modified according to Table 13.2 for different locations of launching aprons. No allowance in the form of concentration factor need be made for computing normal scour depth for the upstream and downstream protection works (2).


The total quantity of stone for launching apron, worked out as mentioned above, should be laid in a length of about 1.5 D to 2.5 D. Here, D is the depth of scour below the floor level. The higher values are to be used for flatter launched slope. The thickness of loose stone at the inner edge should correspond to the required quantity of stone for thickness of launched apron equal to T. The material required for extra thickness of 0.25 T on launched slope should be distributed over the length of apron in the form of a wedge with increasing thickness towards the outer edge.



448

IRRIGATION AND WATER RESOURCES ENGINEERING

Example 13.1 For the following data related to a canal headworks, design the profile of

the weir section:




Flood discharge

= 3000 m3/s

Maximum winter flood discharge

= 300 m3/s

HFL before construction of weir

= 255.5 m

RL of river bed

= 249.5 m

Pond level

= 254.5 m

Lacey’s silt factor (for the river bed material) = 0.9

Permissible afflux

= 1.0 m

Bed retrogression

= 0.5 m

Offtaking canal discharge

= 200 m3/s

Looseness factor

= 1.1

Concentration factor

= 1.2

Permissible exit gradient

= 1/7

The stage-discharge curve of the river is as shown in Fig. 13.6.






Riverstage(metres)

256



255
254


253
252
251
250
249
248

0 1000 2000 3000


Q (cumecs)



Fig. 13.6 Stage-discharge curve for Example 13.1
Solution:



Lecey’s waterway,


Actual width of waterways

Lacey’s regime velocity


P = 4.75 Q = 4.75 3000 = 260.17 m


  • P × Losseness factor




  • 260.17 × 1.1 = 286.19 m

F Qf12 I 1/ 6

L 3000

× 0.9

× 0.9 O1/ 6




= G




J

= M

140

P










H

140 K

N

Q




= 1.61 m/s





CANAL HEADWORKS










449




Velocity head

=

161. × 161.

= 0.13 m




2 × 9.81







Level of d/s TEL

= 255.5 + 0.13







= 255.63 m (255.13 m after retrogression)




Level of u/s TEL

= d/s TEL + Afflux = 255.63 + 1.0







= 256.63 m (256.13 m after retrogression)




Level of u/s HFL

= 256.63 – 0.13 = 256.5 m (256.0 m after retrogression)



The undersluice bays should carry maximum of the following three discharges: (i) Twice the discharge of the offtaking canal = 2 × 200 = 400 m3/s


(ii) 20% of the design flood discharge = 0.2 × 3000 = 600 m3/s (iii) Maximum winter flood discharge = 300 m3/s

∴ Undersluice discharge = 600 m3/s


Providing the undersluice crest at the river bed level (i.e., 249.5 m), the total head on the undersluice crest during high flood condition = 256.63 – 249.5 = 7.13 m.
Discharge intensity q through the undersluice portion = 1.71 (7.13)3/2 = 32.56 m3/s/m. On providing two bays of 10.0 m each (and assuming pier contraction coefficient = 0.1), Discharging capacity of undersluices = 1.71 (20 – 0.1 × 2 × 1 × 7.13) (7.13)3/2

= 604.77 m3/s = 604 m3/s (say)



It should be noted that the pier contraction coefficient would depend on the shape of the pier and may be as small as 0.01 for rounded nose piers.
The weir portion has to carry the remaining flood discharge
= 3000 – 604 = 2396 m3/s On providing 18 bays of 15 m each for the weir portion,


Discharge intensity for weir

=




2396

= 8.87 m3/s/m










18 × 15




Height of TEL over the weir crest

F

8.87I 2 /3




= G

J

= 2.85 m







H

184.K







Here, the formula q = 1.84 k3/2 has been used since the weir crest is usually not wide enough to behave as a broad crest.
Required level of the weir crest = 256.63 – 2.85 = 253.78 m
Provide weir crest at 253.70 m so that the total discharge through the weir and undersluice
= 1.84 (270 – 0.1 × 17 × 2 × 2.93) (2.93)3/2 + 604
= 2401 + 604
= 3005 m3/s against the required value of 3000 m3/s
and clear waterway = 270 + 20
= 290 m against the required value of 286.19 m
Thus, the requirements of discharge capacity and clear waterway are met by providing 18 weir bays (with weir crest at 253.70 m) of 15 m each and two undersluice bays (with crest at 249.5 m) of 10 m each.



450

IRRIGATION AND WATER RESOURCES ENGINEERING

Required height of undersluice gates

= 254.5 – 249.5 = 5.0 m




Required height of weir shutters

= 254.5 – 253.7 = 0.8 m




Hydraulic jump calculations for weir sections:
















Quantity

High flood condition




Pond level condition













Discharge intensity, q (in m3/s/m)

1.84 (2.93)3/2 × 1.2




1.84 (0.8)3/2 × 1.2




= 11.07a




= 1.58a

Critical depth, hc

2.32




0.63

D/S flood level (after retrogression) (m)

255.00




251.25*

D/S TEL (m)

255.13




251.33*

U/S TEL (m)

257.01***




254.58**

Head loss, HL (m)

1.88




3.25

HL/hc

0.81




5.16

E2/hc (from Table 9.1)

2.01




2.74

E2 (m)

4.66




1.73

E1 = E2 + HL (m)

6.54




4.98

Pre-jump depth, h1(m)

1.07




0.162

Post-jump depth, h2 (m)

4.32




1.69

Height of the jump = h2h1 (m)

3.25




1.528

Length of concrete floor required

16.25




7.64

(= 5 × height of the jump) (m)










Level of the jump = D/S TEL – E2 (m)

250.47




249.60












The level of the downstream floor should be at or lower than 249.60 m and the length of the downstream horizontal floor should be equal to or more than 16.25 m. However, the river bed is at 249.0 m. Therefore, provide downstream horizontal floor of length 17 m at 249.5 m.



Yüklə 18,33 Mb.

Dostları ilə paylaş:
1   ...   371   372   373   374   375   376   377   378   ...   489




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin