Uc




L Rex O1/ 8



















= 16.

M




P


































∆ρs

gd

N dm Q




























ρ

m





































and the limit deposit velocity UL is given as (10)



















UL = F1 8 g Rex ( Ss 1)




where, Ss =

ρ s



















ρ
















ρs = the mass density of sediment, ρ = the mass density of water,
Rex = the hydraulic radius of the excluder tunnel.
(13.5)

(13.6)


and F1 depends on the concentration and size distribution of sediment as shown in Fig. 13.12. Garde and Pande (8) suggested that for sediment size greater than 0.5 mm, F1 varies between 0.8 and 1.0, and can be approximated as unity.


If the excluder velocity Uex is greater than UL there will be no deposition of sediment in the excluder. However, the value of UL is generally large and, hence, Uex is usually less than





CANAL HEADWORKS

459


UL and, therefore, the excluder tunnels are partially blocked. The free flow area in such a case can be calculated from

Ufex

=

UL

(13.7)




4gRfex

4gRex














2.0







1




F

1.0
0.0

0
15%
10% 5%
=2% Cv
Cv = sediment concentration by volume

1 2 3 d, mm


(a) For uniform sediment

1 F

1.2
1.0


0.8
0.6
0.4

0


15%

10


5 Cv = 2



1

2

3

4




d, mm






(b) For non-uniform sediment





Fig. 13.12 Limit deposit velocity (10)

where,










Ufex

=




Qex




(13.8)
















Bex Dfex








































and










Rfex =




Bex Dfex

(13.9)
















2 (Bex + Dfex )








































Thus, combining Eqs. (13.6 – 13.9) one gets










2 F







Dfex I

























Qex G

1 +










J























































H







Bex K

= 4F12(Ss – 1)

(13.10)







gD 3

B2
















fex




ex




























Here, the suffix ‘f’ refers to the free (i.e., unblocked) flow area available, and the suffix ‘ex’ refers to the excluder. B, D, and Q are, respectively, the width, depth, and the discharge of the excluder. Using the above equations, Dfex can be calculated. Hence, the blockage of the tunnels is obtained as DexDfex. One can also calculate Ufex from Eq. (13.8).
The bed load and suspended load going into the undersluice pocket are worked out by using suitable bed load relation and the velocity and sediment concentration profiles. Thus, the total sediment concentration (by weight) in the tunnels, Cex, can be obtained. The sediment transport capacity of the tunnels Ct (i.e., sediment concentration by weight) must, obviously, be greater than Cex. Further, Ct is obtained from (11).

L

I







Os1







Re f = M










P Ct1/ 3

(13.11)




d/(4R




)




M

fex

P







N










Q







Here, Re is the Reynolds number of flow [= Ufex (4Rfex)/ν], f the Darcy-Weisbach resistance coefficient, and I is a suitable function of d as given in Fig. 13.13. Further, the index s1 is obtained from





460

IRRIGATION AND WATER RESOURCES ENGINEERING




s1 =

1

(13.12)










0.89d1/ 3




in which, d (in mm) can be either equal to dm or slightly less than dm.

1000

100

10.0
I


1.0

0.1



0.01

















































0.1

0.2

0.4

0.6 0.8 1.0

2.0

3.0













d in mm














Fig. 13.13 Variation of I with d (11)
A suitable design for an excluder requires that the blockage be limited to a suitable value, say, about 35 per cent and also Ct is greater than Cex in the excluder tunnels. Ideally, a design which satisfies all the conditions for minimum values of Qex, Bex, and depth of tunnels will be the most suitable. However, there are some constraints on all these parameters. Therefore, one should choose the best combination satisfying all the requirements and constraints. Some margin of safety should always be provided for in order to account for the uncertainties in the sediment load computations. Following example illustrates the procedure for trial design of a sediment excluder based on the method given by Garde and Pande (8).
Example 13.2 Design a suitable sediment excluder using the following data:

River discharge, Q

= 4250 m3/s

R




River slope

= 1/4000

Depth at pond level

= 4.33 m

Bed width (Barrage width), BR

= 920 m

Canal discharge, Q

= 240.7 m3/s

C







CANAL HEADWORKS

461

Average grain size of the bed material

= 0.37 mm

Maximum size of the bed material

= 0.60 mm


Solution:
(i) Find shear stress acting on the bed corresponding to the maximum discharge at which pond level is being maintained
τo = 1000 × 9.81 × 4.33 × (1/4000) = 10.62 N/m2

Corresponding to this shear stress, the maximum size of the bed material which can be set into motion can be determined using Eq. (7.3) and is equal to 11.00 mm. As such, the maximum size of the bed material (i.e., 0.6 mm) at the site would move under the given conditions.


(ii) Assume some suitable depth of tunnels, t (usually between 1 and 2 m). Let t = 1.6 m
(iii) Assume excluder discharge Qex (between 10 and 20 per cent of canal discharge, Qc).
Let Qex = 48m3/s (approx. 20 per cent of Qc)

(iv) Find the critical velocity U c and limiting velocity UL for the maximum size of the bed material which is movable (step (i)). Using Eqs. (13.5) and (13.6), and assuming Rex = 0.7 m and F1 = 1.0.







Uc = 1.6 1.65 × 9.81 × 0.6 × 10

−3

L




0.7










M

0.6

× 10

−3










N







UL = 1.0 8 × 9.81 × 0.7 (2.65 − 1) = 9.52 m/s
(v) Choose excluder velocity Uex such that it is greater than hood of UL but not exceeding 3 m/s.

Let

Uex = 2.5 m/s.









Bex =

48

= 12.0 m










2.5 × 16.







Rex =

12 × 16.

= 0.706 m







2 (12 + 16.)




O1/ 8

P = 0.38 m/s



Q
Uc and in the neighbour-


∴ Revised

UL = 1.0

8 × 9.81 × 0.706 (2.65 − 1) = 9.56 m/s




and revised

Uc = 1.6

1.65 × 9.81 × 0.6 ×

10

−3

L

0.706

−3

O

1/ 8







M

0.6 × 10

P

= 0.493 m/s



















N




Q







(vi) Determine the width BRE which contributes the discharge to the undersluice pocket using the relation


B =

(Q

+ Q

ex

)

BR










c













RE













QR






















920

= (240.7 + 48) 4250 = 62.5 m



(vii) Determine the amount of bed load coming into the tunnels fed by the stream width BRE as shown in the following steps:



462




























IRRIGATION AND WATER RESOURCES ENGINEERING
















1







L

920 × 4.33




O

2 /3F

1 I 1/2
















4250 =







(920

× 4.3) M
















P




G




J
















n
















































N

(920 + 2 × 4.33) Q




H

4000K
















n = 0.039





























































(0.37 × 103 )1/ 6





































and




n =






















= 0.0105








































25.6


































From Eq. (7.31),




s





























































3 /2 F













I F







F
















I







F

0.0105I

920 ×

4.33

1 I







1










G







J

G
















J G




J

G
















J































165. × 0.37 × 10

−3







H

0.039 K

H 920 + 2

× 4.33K H

4000K

H




K




















































q 2 /3



















= 0.047 + 0.25

























B

























(2.65 × 1000)2 /3 (9.81)(0.37 × 103 )(165.)1/ 3







or

0.2454 = 0.047 + 0.3044q 2/3


































































B








































qB = 0.526 N/m/s











































Total bed load coming into the excluder pocket = 0.526 × 62.50 = 32.875 N/s
(viii) Determine the suspended load coming into the tunnels of the excluder. An approxi-mate simple equation of Engelund’s curve (12) relating suspended load with the river discharge is




Qs




= 0.48 × 10–4GF u* JI 4 .36













QR






















H w K
















u = τ o / ρ =

10.62

= 0.103 m / s










*










1000
















w = fall velocity of the bed material













= 0.05 m/s (for d = 0.37 mm)









Qs = 4250 × 0.48 × 10

–4F

0.103I 4.36

3




G

J

= 4.765 m /s

























H

0.05 K







Suspended load going into the pocket, Qsp is obtained from










Q

=

Qs

× BRE








































sp




BR











































= 4920.765 × 62.5 = 0.324 m3/s


For determining the fraction of suspended load Qsp entering the tunnel, i.e., Qst, one can use curves of Fig. 13.14 (8). For the present problem,










t




=

16.




= 0.37






















D

4.33




















































z =

w




=

0.05




= 1.2













u k

0.103 ×

0.4


























































*































k

u

= 0.4

4250 / (920 × 4.33)




= 4.14







u*




























0.103















Qst




= 0.73






















Qsp



























































CANAL HEADWORKS 463








1.0








































1.0

















































t/D = 0.2





































t/D = 0.3




8










































































































































































































0.8








































0.8



















5

4

.0






















8



































































































































































































































































3





































=

3




























5










=























































SP
















4



















SP
















u / u *





































u

/u *

























k































Q































Q











































0.6
















k
















0.6














































/








































/

















































ST








































ST

















































Q








































Q




















































0.4








































0.4


































































































































0.2








































0.2





































































































































0.4

0.8







1.2




1.6

2.0

0.4

0.8



















1.2

1.6







1.0








































1.0

















































t/D = 0.4





































t/D = 0.5




8

































































































































































































0.8








































0.9



















5







4









































































3

.0




















































































































































































































































=






















SP










8

























SP



























































































u

/

u

*




































































































/Q













4






















/Q













k


































0.6





































0.8































































































































ST





































ST





























































3



































































Q


































Q





























































=


















































































u/
























































































k

u*












































































0.4








































0.7








































































































































0.2








































0.6








































































































































0.4

0.8







1.2




1.6

2.0

0.4

0.8



















1.2

1.6



















Z = w/ku*


































Z = w/ku*










2.0


2.0



Fig. 13.14 Suspended load entering excluder tunnels




Qst = 0.73 × 0.324 × 2.65 × 9810 = 6148.7 N/s







C

=

(6148.75 + 32.875)

= 0.013 (by weight)







48 × 9810







ex









Using Eq. (13.10), one gets



12 + 3Dfex = 48.56

Dfex

Dfex = 0.64 m

Rfex = (12 × 0.64)/[2 (12 + 0.64)] = 0.304 m
Re = [48/(12 × 0.64)] [4 × 0.304] [106] = 7.6 × 106 Taking d = 0.5 mm (less than dm which is 0.6 mm)

1

s1 = 0.89 (0.5)1/ 3 = 1.416 and I = 5.2



Hence, from Eq. (13.11)




6




L










5.2

O1. 416

1/ 3




7.6 × 10




0.02

= M













P

Ct







0.5

× 10

−3
















N




/ ( 4 × 0.304) Q












464

IRRIGATION AND WATER RESOURCES ENGINEERING



Ct = 4.66



Ct > Cex

Since this trial design has yielded relatively large blockage one needs to make another trial. The final design should be such that the sum of the clear waterway, i.e., Bex and thickness of tunnel walls is equal to the width of whole number of undersluice bays.

Yüklə 18,33 Mb.

Dostları ilə paylaş:
1   ...   379   380   381   382   383   384   385   386   ...   489




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin