International organisation for standardisation organisation internationale de normalisation



Yüklə 8,2 Mb.
səhifə242/277
tarix02.01.2022
ölçüsü8,2 Mb.
#13030
1   ...   238   239   240   241   242   243   244   245   ...   277

Cross check


For cross checking the same steps as described in the section above should be carried out as soon as possible, but should not take more than five working days. Moreover it should be checked if integrated tools correspond to the adopted proposal. Results of cross check should be announced to the reflector. The result-sheet should be made available to the group.
      1. Procedure if cross check fails or planned delivery data cannot be held


If a planned delivery date cannot be held this should be announced to the reflector.

If the crosscheck fails or the previous integrator has not delivered the software within 3 days or result sheet within 5 days after planned delivery date



    1. Yüklə 8,2 Mb.

      Dostları ilə paylaş:
1   ...   238   239   240   241   242   243   244   245   ...   277




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin