Joint Collaborative Team on Video Coding (jct-vc)


Output documents (to be updated)



Yüklə 1,12 Mb.
səhifə20/20
tarix15.09.2018
ölçüsü1,12 Mb.
#82383
1   ...   12   13   14   15   16   17   18   19   20

10Output documents (to be updated)


Check delivery dates, doc numbers, links to doc files.

Planning of HM encoder description – plan to improve this in AHG work toward publishing as part of the RS standard. TBD whether this would be in v.1 of the RS standard or added later.

Issues in conformance: The situation has been improving. profile_idc and level_idc need to be correct, some HM 9 bitstreams not updated, some planned bitstreams missing, many bitstreams need updates for corrections of these issues and others. Coverage still needs improvement. Various combinations of tiles & slices & loop filtering control parameters, SEI messages, "corner cases".

The following documents were agreed to be produced or endorsed as outputs of the meeting. Names recorded below indicate those responsible for document production.



JCTVC-O1000JCTVC-PO1000 Meeting Report of 165th JCT-VC Meeting [G. J. Sullivan, J.-R. Ohm] [2014-03-14] (near next meeting)
Remains valid – not re-issued: JCTVC-H1001 HEVC software guidelines [K. Sühring, D. Flynn, F. Bossen, (software coordinators)]

(Remains valid, although from a prior meeting.)


JCTVC-O1002JCTVC-PO1002 High Efficiency Video Coding (HEVC) Test Model 143 (HM 143) Encoder Description [K. McCann (primary), B. Bross, W.-J. Han, I. K. Kim, K. Sugimoto, G. J. Sullivan] (WG 11 N 142313937) [2014-031-1406] (near next meeting)

JCTVC-O1003JCTVC-PO1003 High Efficiency Video Coding (HEVC) Defect Report Draft 32 [Y.-K. Wang, G. J. Sullivan, B. Bross] (WG 11 N 142253931) [20143-011-3118] (2 weeks)

JCTVC-O1004JCTVC-PO1004 HEVC Conformance Draft 65 [T. Suzuki, W. Wan, G. J. Sullivan] (WG 11 N 142423942 ISO/IEC Study Preliminary draft of ISO/IEC FDIS) [20143-0211-148] (24 weeks)
JCTVC-O1005JCTVC-PO1005 HEVC Range Extensions Draft Text 65 [D. Flynn, M. Naccari, K. Sharman, C. Rosewarne, J. Sole, G. Sullivan, T. Suzuki] (WG 11 N 139334228, Study Preliminary draft of ISO/IEC FDAM1) [20143-0212-2802] (2 Dec.)
JCTVC-O1006JCTVC-PO1006 Common test conditions and software reference configurations for HEVC range extensions [D. Flynn, C. Rosewarne, K. Sharman] [20143-011-3118] (2 weeks)
AHG 7 to confirm expected coding results and refine selections accordingly during preparation of the document.
JCTVC-O1007JCTVC-PO1007 SHVC Test Model 54 (SHM 54) [J. Chen, J. Boyce, Y. Ye, M. M. Hannuksela] (WG 11 N 139394233) [20143-012-2802] (2 Dec.6 weeks)
JCTVC-O1008JCTVC-PO1008 SHVC Draft Text 54 [J. Chen, J. Boyce, Y. Ye, M. M. Hannuksela, G. J. Sullivan, Y.-K. Wang] (WG 11 N 139354230 Study ofISO/IEC PDAMDAM3) [20143-0112-3107] (1 week after MV-HEVC draft)
JCTVC-O1009JCTVC-PO1009 Common SHM test conditions and software reference configurations [V. Seregin, Y. He] [20143-011-3122] (1 week after software)

uUpdate to include updated anchor results and config files.



Remains valid – not updated JCTVC-O1010 Guidelines for conformance test bitstream preparation [T. Suzuki, W. Wan] [2013-11-01] (immediate)

Update to include updated anchor results and config files.


JCTVC-O1011JCTVC-PO1011 HEVC verification test plan draft 2 (WG 11 N 139324226) [T.K. Tan, V. Baroncini, M. Mrak] [20143-011-1701] (immediate)
JCTVC-O1012 Designs under study for SHVC hybrid scalability [J. Boyce, J. Samuelsson] [2013-11-08] (1 week)

JCTVC-O1013JCTVC-PO1013 HEVC RRange Eextensions Ttest Mmodel 65 Eencoder Ddescription [M. Naccari, C. Rosewarne, K. Sharman, G. Sullivan] (WG 11 N 142323938) [20143-0212-2113]

Remains valid – not re-issued: JCTVC-L1100 Common HM test conditions and software reference configurations [F. Bossen]

(Remains valid, although from a prior meeting.)


Note that regardless of preliminary CE plans established earlier in the meeting were not considered binding on final CE plans as reviewed in closing plenary.

JCTVC-O1101JCTVC-PO1101 HEVC Scalable Extensions Core Experiment SCE1: Colour Gamut and Bit Depth Scalability [A. Duenas, P. Andrivon, P. Bordes, E. Alshina, A. Duenas, Y. YHe, K. Ugur, X. Li (CE cCoordinators)] [2014-01-31] (two weeks)

Two configurations: 1x and 2x

Not using high precision weighted prediction, due to desire for base layer to use Main or Main 10 profile. However, the impact of this decision should be measured (either in the CE or by the AHG).

T0 expected in 2 weeks.

JCTVC-PO1101 was reviewed in non-final form in closing plenary. A three two week finalization period was authorized.

JCTVC-O1121JCTVC-PO1121 HEVC Range Extensions Core Experiment 1 (RCE1): High bit rate coding at high bit depthsAdaptive motion vector precision [J. Joshi, K. Sharman XXX (CE coordinators)] [2014-01-31] (two weeks)

Schemes to be tested



  • P0277

  • P0283

  • Combination

Faster software availability was highly encouraged if feasible.

JCTVC-O1122 HEVC Range Extensions Core Experiment 2 (RCE2): Rice parameter initialization [C. Rosewarne, M. Karczewicz, K. Sharman, S.-H. Kim (CE coordinators)]
JCTVC-O1123 HEVC Range Extensions Core Experiment 3 (RCE3) Intra block copy refinement [J. Sole (CE coordinators)]

JCTVC-O1124 HEVC Range Extensions Core Experiment 4 (RCE4) Palette coding [L. Guo, X. Guo (CE coordinators)]
Review chaired by K.Chono.

1. No test on the combination. A revision of the document will be uploaded to remove the discussion of a combination test.

2. Subjective test will be removed if clear procedure is not given by the CE plan finalization date.
JCTVC-PO1121 through JCTVC-O1124 werewas reviewed in non-final form in closing plenary. A three two week finalization period was authorized.

11Future meeting plans, expressions of thanks, and closing of the meeting


Future meeting plans were established according to the following guidelines:

  • Meeting under ITU-T SG 16 auspices when it meets (starting meetings on the Monday or Tuesday of the first week and closing it on the Tuesday or Wednesday of the second week of the SG 16 meeting), and

  • Otherwise meeting under ISO/IEC JTC 1/SC 29/WG 11 auspices when it meets (starting meetings on the Wednesday or Thursday prior to such meetings and closing it on the last day of the WG 11 meeting).

Some specific future meeting plans were established as follows:

  • 27 Mar. – 4 Apr. 2014 under WG 11 auspices in Valencia, ES.

  • 30 June – 9 July 2014 under ITU-T auspices in Sapporo, JP.

  • 16–24 Oct. 2014 under WG 11 auspices in Strasbourg, FR.

  • XX–XX Feb. 2015 under ITU-T auspices in Geneva, CH.

The agreed document deadline for the March/April 2014 meeting is XX March). No restrictions were planned to be imposed on the scheduling of agenda items within that meeting.
XXX The USNB of WG 11 and the meeting sponsoring companies CableLabs, Huawei, InterDigital, Microsoft, Mitsubishi, Qualcomm, and Sony, wereas thanked for the excellent hosting of the 16th meeting of the JCT-VC. Apple, Huawei and Sony were thanked for providing viewing equipment used at the meeting. [Ed. more?]

The JCT-VC meeting was closed at approximately 1330XXXX hours on Fri. 178 Jan. 2014.




Annex A to JCT-VC report:
List of documents




Annex B to JCT-VC report:
List of meeting participants


The participants of the sixteenth meeting of the JCT-VC, according to a sign-in sheet circulated during the meeting (approximately XXX 152 people in total), were as follows:


  1. Richard Allen (Altera)

  2. Elena Alshina (Samsung Electronics)

  3. José Alvarez (Ovics)

  4. Peter Amon (Siemens AG)

  5. Kenneth Andersson (LM Ericsson)

  6. Cheung Auyeung (Sony)

  7. Giovanni Ballocca (Sisvel Tech)

  8. Gun Bang (ETRI)

  9. Guillaume Barroux (Fujitsu)

  10. Semyon Blinstein (Vanguard Video)

  11. Jill Boyce (Vidyo)

  12. Benjamin Bross (Fraunhofer HHI)

  13. Heribert Brust (Fraunhofer HHI)

  14. Madhukar Budagavi (Texas Instruments)

  15. Done Bugdayci Sansli (Tampere University of Technology)

  16. Yulin Chang (MediaTek Inc.)

  17. Chun-Chi Chen (NCTU/ITRI)

  18. Jianle Chen (Qualcomm)

  19. Peisong Chen (Broadcom)

  20. Ying Chen (Qualcomm)

  21. Yongjin Cho (Samsung Electronics)

  22. Byeongdoo Choi (Samsung Electronics)

  23. Jangwon Choi (Yonsei University)

  24. Keiichi Chono (NEC)

  25. Takeshi Chujoh (Toshiba)

  26. Robert Cohen (Mitsubishi Electric Res. Labs)

  27. Sachin Deshpande (Sharp)

  28. Raul Diaz (Vanguard Software Solutions)

  29. Alberto Duenas (NGCodec)

  30. MyungJin Eom (Samsung Electronics)

  31. Chad Fogg (Harmonic)

  32. Edouard François (Technicolor)

  33. Arild Fuldseth (Cisco Systems Norway)

  34. Wen Gao (Huawei USA)

  35. Dan Grois (Fraunhofer HHI)

  36. Qunshan Gu (Google)

  37. Xun Guo (Microsoft Research Asia)

  38. Wassim Hamiclouche (IETR/INSA)

  39. Miska Hannuksela (Nokia)

  40. Ryoji Hashimoto (Renesas Electronics)

  41. Shinobu Hattori (Sony)

  42. Yong He (InterDigital Commun.)

  43. Fnu Hendry (Qualcomm)

  44. Dzung Hoang (Zenverge)

  45. James Holland (Intel)

  46. Ted Hsieh (Qualcomm Technologies)

  47. Yang Hu (Cisco Systems)

  48. Yu-Wen Huang (MediaTek USA Inc.)

  49. Atsuro Ichigaya (Japan Broadcasting Corporation (NHK))

  50. Russell James (Altera)

  51. Rajan Joshi (Qualcomm Technologies)

  52. Jung Won Kang (ETRI (Electronics and Telecommunications Research Institute))

  53. Marta Karczewicz (Qualcomm Technologies)

  54. Kei Kawamura (KDDI)

  55. Kimihiko Kazui (Fujitsu Labs)

  56. Erh Chung Ke (ITRI)

  57. Dae Yeon Kim (Chips & Media)

  58. Hui Yong Kim (ETRI)

  59. Thomas Kunlin (ST Microelectronics)

  60. Jung Hyun Kwon (Chips & Media)

  61. Phillipe Laffont (ST Microelectronics)

  62. PoLin (Wang) Lai (Mediatek USA)

  63. Jani Lainema (Nokia)

  64. Guillaume Laroche (Canon Research)

  65. Bae-Keun Lee (KT)

  66. Hahyun Lee (Electronics and Telecommunications Research Institue (ETRI))

  67. Jae Yung Lee (Sejong Univ.)

  68. Sunil Lee (Samsung Electronics)

  69. Shawmin Lei (MediaTek USA)

  70. Ming Li (ZTE)

  71. Xiang Li (Qualcomm Technologies)

  72. Jian-Liang Lin (MediaTek Inc.)

  73. Yongbing Lin (Huawei Technologies)

  74. Shan Liu (MediaTek USA)

  75. Taoran Lu (Dolby)

  76. Ajay Luthra (Arris)

  77. Zhan Ma (Huawei)

  78. Gaëlle Martin-Cocher (Blackberry)

  79. Shohei Matsuo (NTT)

  80. Ken McCann (Zetacast / Samsung)

  81. Koohyar Minoo (Arris)

  82. Kiran Misra (Sharp)

  83. Kazuyuki Miyazawa (Mitsubishi Electric)

  84. Tokumichi Murakami (Mitsubishi Electric)

  85. Matteo Naccari (BBC R&D)

  86. Ohji Nakagami (Sony corporation)

  87. Tung Nguyen (Fraunhofer HHI)

  88. Takahiro Nishi (Panasonic)

  89. Jens-Rainer Ohm (RWTH Aachen Univ.)

  90. Patrice Onno (Canon Research Centre France)

  91. Chao Pang (Qualcomm Technologies)

  92. Wen-Hsiao Peng (ITRI International/NCTU)

  93. Wei Pu (Qualcomm Technologies)

  94. Adarsh Krishnan Ramasubramonian (Qualcomm Technologies)

  95. Krishnakanth Rapaka (Qualcomm Technologies)

  96. Justin Ridge (Nokia Oyj)

  97. Christopher Rosewarne (CiSRA / Canon Inc)

  98. Dmytro Rusanovskyy (LG Electronics USA)

  99. Jesus Sampedro (Polycom)

  100. Jonatan Samuelsson (LM Ericsson)

  101. Yago Sanchez (Fraunhofer HHI)

  102. Hisao Sasai (Panasonic)

  103. Kazushi Sato (Sony)

  104. Nicholas Saunders (Sony Europe Broad. & Prof. Res. Labs)

  105. Shun-ichi Sekiguchi (Mitsubishi Electric)

  106. Vadim Seregin (Qualcomm)

  107. Karl Sharman (Sony Europe Broad. & Prof. Res. Labs)

  108. Masato Shima (Canon)

  109. Shinya Shimizu (NTT)

  110. Rickard Sjöberg (Ericsson AB)

  111. Robert Skupin (Fraunhofer HHI)

  112. Joel Sole (Qualcomm Technologies)

  113. Nikolce Stefanoski (Disney Research Zurich)

  114. Shiori Sugimoto (NTT)

  115. Gary Sullivan (Microsoft)

  116. Teruhiko Suzuki (Sony)

  117. Maxim Sychev (Huawei Technologies)

  118. Ali Tabatabai (Sony)

  119. Thiow Keng Tan (NTT Docomo)

  120. Gerhard Tech (Fraunhofer HHI)

  121. Ikai Tomohiro (Sharp)

  122. Pankaj Topiwala (FastVDO)

  123. Alexandros Tourapis (Apple)

  124. Yi-Shin Tung (ITRI USA / MStar Semiconductor)

  125. Kemal Ugur (Nokia)

  126. Sebastiaan Van Leuven (Ghent University - iMinds)

  127. Thijs Vermeir (Barco N.V.)

  128. Wade Wan (Broadcom)

  129. Wei Wang (Huawei)

  130. Ye-Kui Wang (Qualcomm Technologies)

  131. Hitoshi Watanabe (Harmonic)

  132. Stephan Wenger (Vidyo)

  133. Mathias Wien (RWTH Aachen Univ.)

  134. Ping Wu (ZTE UK)

  135. Xiaoyu Xiu (InterDigital Commun.)

  136. Jizheng Xu (Microsoft)

  137. Jun Xu (Sony)

  138. Meng Xu (Huawei)

  139. Xiaozhong Xu (MediaTek)

  140. Tomoyuki Yamamoto (Sharp)

  141. Jing Ye (MediaTek)

  142. Yan Ye (InterDigital Commun.)

  143. Peng Yin (Dolby Labs)

  144. Haoping Yu (Huawei USA)

  145. Lu Yu (Zhejiang Univ.)

  146. Weimin Zeng (Real Communications)

  147. Li Zhang (Qualcomm Technologies)

  148. Jianhua Zheng (Huawei Technologies)

  149. Xiaosong Zhou (Apple)

  150. Ye Zhou (Marvell)

  151. Jianqing Zhu (Fujitsu R&D Center)

  152. Feng Zou (Qualcomm Technologies)




Page: Date Saved: 2014-01-23

Yüklə 1,12 Mb.

Dostları ilə paylaş:
1   ...   12   13   14   15   16   17   18   19   20




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin