Of itu-t sg16 wp3 and iso/iec jtc1/SC29/WG11


Output documents (to be updated)



Yüklə 0,93 Mb.
səhifə21/21
tarix09.01.2019
ölçüsü0,93 Mb.
#94319
1   ...   13   14   15   16   17   18   19   20   21

11Output documents (to be updated)


Planning of HM encoder description – plan to improve this in AHG work toward publishing as part of the RS standard. TBD whether this would be in v.1 of the RS standard or added later.

Issues in conformance: The situation has been improving. profile_idc and level_idc need to be correct, some HM 9 bitstreams not updated, some planned bitstreams missing, many bitstreams need updates for corrections of these issues and others. Coverage still needs improvement. Various combinations of tiles & slices & loop filtering control parameters, SEI messages, "corner cases".

The following documents were agreed to be produced or endorsed as outputs of the meeting. Names recorded below indicate those responsible for document production.

JCTVC-Q1000 Meeting Report of 17th JCT-VC Meeting [G. J. Sullivan, J.-R. Ohm] [2014-06-20] (near next meeting)
Remains valid – not re-issued: JCTVC-H1001 HEVC software guidelines [K. Sühring, D. Flynn, F. Bossen, (software coordinators)]

(Remains valid, although from a prior meeting.)


JCTVC-Q1002 High Efficiency Video Coding (HEVC) Test Model 15 (HM 15) Encoder Description [K. McCann (primary), B. Bross, W.-J. Han, I. K. Kim, K. Sugimoto, G. J. Sullivan] [2014-06-20] (near next meeting)
JCTVC-Q1003 High Efficiency Video Coding (HEVC) Edition 1 Defect Report Draft 4 [Y.-K. Wang, G. J. Sullivan, B. Bross] [2014-05-30]
JCTVC-Q1004 HEVC Conformance Draft 7 [T. Suzuki, W. Wan, G. J. Sullivan] (WG 11 N 14426 Preliminary draft of ISO/IEC FDIS) [2014-05-16]
JCTVC-Q1005 HEVC Range Extensions Draft Text 7 [D. Flynn, M. Naccari, K. Sharman, C. Rosewarne, J. Sole, G. Sullivan, T. Suzuki] (WG 11 N 14414, ISO/IEC FDIS) [2014-05-30]
Remains valid – not reissued JCTVC-Q1006 Common test conditions and software reference configurations for HEVC range extensions [D. Flynn, C. Rosewarne, K. Sharman]
JCTVC-Q1007 SHVC Test Model 6 (SHM 6) [J. Chen, J. Boyce, Y. Ye, M. M. Hannuksela] (WG 11 N 14419) [2014-06-06] (editing time)
JCTVC-Q1008 SHVC Draft Text 6 [J. Chen, J. Boyce, Y. Ye, M. M. Hannuksela, G. J. Sullivan, Y.-K. Wang] (WG 11 N 14416 ISO/IEC Study of DAM3) [2014-06-06]
JCTVC-Q1009 Common SHM test conditions and software reference configurations [V. Seregin, Y. He] [2014-05-02] (1 week after software)

Update to include updated anchor results and config files.

Include colour gamut scalability tests.

Remains valid – not updated JCTVC-O1010 Guidelines for conformance test bitstream preparation [T. Suzuki, W. Wan]
JCTVC-Q1011 Report on HEVC compression performance verification test (WG 11 N 14420) [T. K. Tan, V. Baroncini, M. Mrak, [+]] [2014-04-25]
JCTVC-Q1013 HEVC Range Extensions Test Model 7 Encoder Description [M. Naccari, C. Rosewarne, K. Sharman, G. Sullivan] (WG 11 N 14418) [2014-06-06]

Remains valid – not re-issued: JCTVC-L1100 Common HM test conditions and software reference configurations [F. Bossen]

(Remains valid, although from a prior meeting.)


Note that regardless of preliminary CE plans established earlier in the meeting were not considered binding on final CE plans as reviewed in closing plenary.

Q1012 [Range extensions conformance draft 1 N 14427] [Suzuki, Kazui] [2014-05-30]

Q1014 [Screen content coding test model 1 (SCM 1) N 14421] [R. Joshi, J. Xu, R. Cohen, S. Liu, Z. Ma, Y. Ye] [2014-04-25]

Q1015 Common conditions for screen content coding tests [H. Yu, R. Cohen, K. Rapaka, J. Xu] [2014-05-02]

JCTVC-Q1101 HEVC Scalable Extensions Core Experiment SCE1: Colour Gamut and Bit Depth Scalability [A. Duenas, P. Andrivon, E. Alshina, Y. Ye, K. Ugur, X. Li (CE coordinators)] [2014-01-31] (three weeks)

3 weeks for finalization of CE description. Some details of planned test to be worked out to provide a more precise defintion of the experiment.

To test normative and non-normative alternatives.

JCTVC-Q1101 was reviewed in non-final form in closing plenary. A three week finalization period was authorized for the plan document.



JCTVC-Q1121 HEVC Screen Content Core Experiment 1 (SCCE1): Intra block copy [J. Sole, S. Liu (CE coordinators)] [2014-04-18] (two weeks)

JCTVC-Q1121 was reviewed in non-final form in closing plenary. A two week finalization period was authorized for the plan document.


JCTVC-Q1122 HEVC Screen Content Core Experiment 2 (SCCE2): Line-based intra copy [C.-C. Chen, X. Xu, L. Zhang (CE coordinators)] [2014-04-18] (two weeks)

JCTVC-Q1122 was reviewed in non-final form in closing plenary. A two week finalization period was authorized for the plan document.


JCTVC-Q1123 HEVC Screen Content Core Experiment 3 (SCCE3): Palette mode [Y.-W. Huang, P.  Onno, R.  Joshi, R.  Cohen, X.  Xiu, Z.  Ma (CE coordinators)] [2014-04-18] (two weeks)

JCTVC-Q1123 was reviewed in non-final form in closing plenary. A two week finalization period was authorized for the plan document.


JCTVC-Q1124 HEVC Screen Content Core Experiment 4 (SCCE4): String matching for sample coding [Y. Chen, J. Xu (CE coordinators)] [2014-04-18] (two weeks)

JCTVC-Q1124 was reviewed in non-final form in closing plenary. A two week finalization period was authorized for the plan document.


JCTVC-Q1125 HEVC Screen Content Core Experiment 5 (SCCE5): Inter-component prediction and adaptive colour transform [X. Xiu, J. Chen (CE coordinators)] [2014-04-18] (two weeks)

JCTVC-Q1125 was reviewed in non-final form in closing plenary. A two week finalization period was authorized for the plan document.



12List of decisions and action items


TBA (assistance requested).

This section lists decisions reached and action items identified at the meeting. It is only a collection of information provided elsewhere in this report, in order to provide a condensed list of such decisions. It may not be complete, fully precise, or even correct, and some items may consist of intentionally condensed summaries.

Decisions on normative content of text:




Editorial action items:


13Future meeting plans, expressions of thanks, and closing of the meeting


Future meeting plans were established according to the following guidelines:

  • Meeting under ITU-T SG 16 auspices when it meets (starting meetings on the Monday or Tuesday of the first week and closing it on the Tuesday or Wednesday of the second week of the SG 16 meeting), and

  • Otherwise meeting under ISO/IEC JTC 1/SC 29/WG 11 auspices when it meets (starting meetings on the Wednesday or Thursday prior to such meetings and closing it on the last day of the WG 11 meeting).

Some specific future meeting plans were established as follows:

  • 30 June (3:45 p.m.) – 9 July 2014 under ITU-T auspices in Sapporo, JP.

  • 17–24 Oct. 2014 under WG 11 auspices in Strasbourg, FR.



The agreed document deadline for the 18th JCT-VC meeting is 20 June. Plans for scheduling of agenda items within that meeting TBA.
XXX were thanked for the excellent hosting of the 17th meeting of the JCT-VC. YYY were thanked for providing viewing equipment used at the meeting.

The JCT-VC meeting was closed at approximately 12:30 hours on Fri. 4 Apr. 2014.




Annex A to JCT-VC report:
List of documents




Annex B to JCT-VC report:
List of meeting participants


The participants of the sixteenth meeting of the JCT-VC, according to a sign-in sheet circulated during the meeting (approximately XXX 126 people in total), were as follows:


  1. …Elena Alshina (Samsung Electronics)

  2. Peter Amon (Siemens AG)

  3. Kenneth Andersson (LM Ericsson)

  4. Pierre Andrivon (Technicolor)

  5. Jicheng Au (MediaTek)

  6. Cheung Auyeung (Sony)

  7. Giovanni Ballocca (Sisvel Tech)

  8. Gun Bang (ETRI)

  9. Guillaume Barroux (Fujitsu)

  10. Frank Bossen (NTT Docomo)

  11. Jill Boyce (Vidyo)

  12. Done Bugdayci Sansli (Tampere University of Technology)

  13. Tsui-Shan Chang (NCTU/ITRI)

  14. Chun-Chi Chen (NCTU/ITRI)

  15. Jianle Chen (Qualcomm)

  16. Peisong Chen (Broadcom)

  17. Weizhong Chen (Huawei)

  18. Xu Chen (Huawei Technologies)

  19. Ying Chen (Qualcomm)

  20. Yi-Wen Chen (MediaTek)

  21. Yongjin Cho (Samsung Electronics)

  22. Keiichi Chono (NEC)

  23. Tzu-Der Chuang (MediaTek)

  24. Takeshi Chujoh (Toshiba)

  25. Robert Cohen (Mitsubishi Electric Res. Labs)

  26. Sachin Deshpande (Sharp)

  27. Alexey Dolgoborodov (Vanguard Software Solutions)

  28. Alberto Duenas (NGCodec)

  29. David Flynn (Blackberry)

  30. Chad Fogg (Harmonic)

  31. Edouard François (Technicolor)

  32. Arild Fuldseth (Cisco Systems Norway)

  33. Dan Grois (Fraunhofer HHI)

  34. Miska Hannuksela (Nokia)

  35. Ryoji Hashimoto (Renesas Electronics)

  36. Shinobu Hattori (Sony)

  37. James Helman (MovieLabs)

  38. Fnu Hendry (Qualcomm)

  39. Yu-Wen Huang (MediaTek USA Inc.)

  40. Atsuro Ichigaya (Japan Broadcasting Corporation (NHK))

  41. Tomohiro Ikai (Sharp)

  42. Byeungwoo Jeon (Sungkyunkwan Univ. (SKKU))

  43. Jung Won Kang (ETRI (Electronics and Telecommunications Research Institute))

  44. Marta Karczewicz (Qualcomm Technologies)

  45. Kei Kawamura (KDDI)

  46. Kimihiko Kazui (Fujitsu Labs)

  47. Dae Yeon Kim (Chips & Media)

  48. Hui Yong Kim (ETRI)

  49. Seung Hwan Kim (Sharp)

  50. Peter Kuhn (European Patent Office)

  51. PoLin (Wang) Lai (Mediatek USA)

  52. Jani Lainema (Nokia)

  53. Guillaume Laroche (Canon Research)

  54. Sebastien Lasserre (Technicolor)

  55. Thorsten Laude (Leibniz Univ. Hannover)

  56. Bae-Keun Lee (KT)

  57. Hahyun Lee (Electronics and Telecommunications Research Institue (ETRI))

  58. Sukho Lee (ETRI)

  59. Sunil Lee (Samsung Electronics)

  60. Shawmin Lei (MediaTek USA)

  61. Ming Li (ZTE)

  62. Xiang Li (Qualcomm Technologies)

  63. Chong Soon Lim (Panasonic)

  64. Ching-Chieh Lin (ITRI International)

  65. Jian-Liang Lin (MediaTek Inc.)

  66. Tao Lin (Tongji University)

  67. Shan Liu (MediaTek USA)

  68. Ajay Luthra (Arris)

  69. Zhan Ma (Huawei)

  70. Vinod Kumar Malamal Vadakital (Nokia)

  71. Gaëlle Martin-Cocher (Blackberry)

  72. Shohei Matsuo (NTT)

  73. Ken McCann (Zetacast / Samsung)

  74. Akira Minezawa (Mitsubishi Electric)

  75. Koohyar Minoo (Arris)

  76. Kazuyuki Miyazawa (Mitsubishi Electric)

  77. Matteo Naccari (BBC R&D)

  78. Ohji Nakagami (Sony corporation)

  79. Takahiro Nishi (Panasonic)

  80. Jens-Rainer Ohm (RWTH Aachen Univ.)

  81. Patrice Onno (Canon Research Centre France)

  82. Chanyul Park (Samsung Electronics)

  83. Wen-Hsiao Peng (ITRI International/NCTU)

  84. Adarsh Krishnan Ramasubramonian (Qualcomm Technologies)

  85. Krishnakanth Rapaka (Qualcomm Technologies)

  86. Justin Ridge (Nokia Oyj)

  87. Christopher Rosewarne (CiSRA / Canon Inc)

  88. Damian Ruiz (Univ. Politec. de Valencia)

  89. Jesus Sampedro (Polycom)

  90. Nicholas Saunders (Sony Europe Broad. & Prof. Res. Labs)

  91. Karl Sharman (Sony Europe Broad. & Prof. Res. Labs)

  92. Masato Shima (Canon)

  93. Shinya Shimizu (NTT)

  94. Rickard Sjöberg (Ericsson AB)

  95. Joel Sole (Qualcomm Technologies)

  96. Nikolce Stefanoski (Disney Research Zurich)

  97. Karsten Sühring (Fraunhofer HHI)

  98. Gary Sullivan (Microsoft)

  99. Huifang Sun (Mitsubishi Electric Res. Labs)

  100. Teruhiko Suzuki (Sony)

  101. Maxim Sychev (Huawei Technologies)

  102. Ali Tabatabai (Sony)

  103. Thiow Keng Tan (NTT Docomo)

  104. Gerhard Tech (Fraunhofer HHI)

  105. Pankaj Topiwala (FastVDO)

  106. Alexandros Tourapis (Apple)

  107. Yi-Shin Tung (ITRI USA / MStar Semiconductor)

  108. Kemal Ugur (Nokia)

  109. Glenn Van Wallendael (Ghent University - iMinds)

  110. Anthony Vetro (Mitsubishi Electric Res. Labs)

  111. Wei Wang (Huawei)

  112. Ye-Kui Wang (Qualcomm Technologies)

  113. Stephan Wenger (Vidyo)

  114. Thomas Wiegand (Fraunhofer HHI)

  115. Ping Wu (ZTE UK)

  116. Xiaoyu Xiu (InterDigital Commun.)

  117. Jizheng Xu (Microsoft)

  118. Tomoyuki Yamamoto (Sharp)

  119. Haitao Yang (Huawei Technologies)

  120. Yan Ye (InterDigital Commun.)

  121. Peng Yin (Dolby Labs)

  122. Haoping Yu (Huawei USA)

  123. Xiaozhen Zheng (Huawei Technologies)

  124. Yunfei Zheng (Apple)

  125. Minhua Zhou (Broadcom)

  126. Jianqing Zhu (Fujitsu R&D Center)




Page: Date Saved: 2014-04-17

Yüklə 0,93 Mb.

Dostları ilə paylaş:
1   ...   13   14   15   16   17   18   19   20   21




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin