Report of sa wg2 meeting #114


Discussion and conclusion



Yüklə 12,13 Mb.
səhifə85/311
tarix03.01.2022
ölçüsü12,13 Mb.
#43693
1   ...   81   82   83   84   85   86   87   88   ...   311
Discussion and conclusion:

Agreed in parallel sessions. This was Block approved.

TD S2 160150 23.161 CR0013 (Rel 13, 'F'): Correction to unsability indication. (Source: Ericsson).
Abstract: Summary of change: Remove RAN Rule as trigger for usability indication.

Discussion and conclusion:

Agreed in parallel sessions. This was Block approved.

TD S2 160375 23.161 CR0017 (Rel 13, 'F'): The procedure of removal of one access from the Multi access PDN connection. (Source: ZTE).
Abstract: Summary of change: 1. The UE initiates the PDN disconnection procedure via one access to remove one access from the multi-access PDN connection. 2. The PCRF/P-GW initiates the PDN disconnection procedure to remove one access from the multi-access PDN connection.


Yüklə 12,13 Mb.

Dostları ilə paylaş:
1   ...   81   82   83   84   85   86   87   88   ...   311




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin