Sl. No.
|
Description
|
New Delhi Distt. w.e.f. 18.01.2016 to 29.01.2016
|
Security Unit w.e.f. 17.01.2016 to 27.01.2016
|
Central Distt. w.e.f. 22.01.2016 to 26.01.2016
|
North Distt w.e.f. 21.01.2016 to 26.01.2016
|
North-West Distt. (Chhattrasal Stadium) w.e.f. 21.01.2016 to 25.01.2016
|
CLOSED CIRCUIT SURVEILLANCE TELEVISION
|
-
|
Outdoor P/T/Z Camera with 30 X optical Zoom or better
|
64
|
22
|
11
|
17
|
09
|
-
|
Fixed Camera with Varifocal Lens
|
-
|
58
|
70
|
37
|
17
|
-
|
21” Colour LCD High Resolution Monitor for PTZ Monitoring in Control Room
|
64
|
22
|
11
|
17
|
09
|
-
|
32” Colour LCD High Resolution Monitor for monitoring 16 Camera on each LCD panel
|
As per requirement of user
|
As per requirement of user
|
As per requirement of user
|
As per requirement of user
|
As per requirement of user
|
-
|
42” Colour LCD High Resolution Monitor for monitoring 16 Camera on each LCD panel
|
As per requirement of user
|
As per requirement of user
|
As per requirement of user
|
As per requirement of user
|
As per requirement of user
|
-
|
Keyboard for P/T/Z/ Cameras
|
As per requirement
|
As per requirement
|
As per requirement
|
As per requirement
|
As per requirement
|
-
|
DVR 16 Channel having capability to record 400 frames per second with redundancy
|
As per requirement
|
As per requirement
|
As per requirement
|
As per requirement
|
As per requirement
|
-
|
Computerized recording as back up for the complete function.
|
As per requirement
|
As per requirement
|
As per requirement
|
As per requirement
|
As per requirement
|
-
|
Recording capacity for full function
|
As per requirement
|
As per requirement
|
As per requirement
|
As per requirement
|
As per requirement
|
-
|
Accessories
|
1 set
|
1 set
|
1 set
|
1 set
|
1 set
|
-
|
Swith/Optical Fibre/CDT 6 Cable/ another other accessories/ service required for connection with Delhi Police C4i.
|
As per requirement
|
As per requirement
|
As per requirement
|
As per requirement
|
As per requirement
|
-
|
Nearest Cyber Highway Node)
|
As per requirement
|
As per requirement
|
As per requirement
|
As per requirement
|
As per requirement
|
-
|
Locations of proposed Control Rooms
|
As desired/ required by DCP(User Unit)
|
As desired/ required by DCP(User Unit)
|
As desired/ required by DCP(User Unit)
|
As desired/ required by DCP(User Unit)
|
As desired/ required by DCP(User Unit)
|