Of itu-t sg16 wp3 and iso/iec jtc1/SC29/WG11


Project development, status, and guidance (34)



Yüklə 0,73 Mb.
səhifə41/174
tarix05.01.2022
ölçüsü0,73 Mb.
#69731
1   ...   37   38   39   40   41   42   43   44   ...   174

3Project development, status, and guidance (34)




3.1Communication to and by parent bodies (0)




3.2Conformance test set development (2)


JCTVC-O0084 Editor's proposed draft text of HEVC conformance testing [T. Suzuki, G. Sullivan, W. Wan]

Reviewed Thu 31st am (GJS).

Text proposed by editors to update the available bitstream information.

JCTVC-O0104 Corner case conformance streams [C. Fogg (Harmonic)]

Reviewed Thu 31st am (GJS).

For the unfulfilled conformance bitstreams, it was proposed that JCT volunteers collaborate to create a modified HM encoder to generate them. This proposal outlines suggested methods to most quickly achieve this goal, including use of stream element profiling, and iterative frame synthesis to trigger the desired corner cases.

The contribution suggested to use dynamic lists to form counters for each element combination.

If a test pattern is not found in a sweep of the existing conformance suite, the contribution suggested that JCT volunteers could create such bitstreams, in a collaborate project based off the HM encoder, if the case is considered important.

The presenter was not available for review.

In the discussion, it was suggested that there could be some configuration parameters to use within the HM codebase that would trigger the generation of corner cases by the HM. It was suggested that if we do this, checking whether some change breaks this functionality could become part of the check-in process.


Yüklə 0,73 Mb.

Dostları ilə paylaş:
1   ...   37   38   39   40   41   42   43   44   ...   174




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin