The JCT-VC did not directly send or receive formal liaison communications at this meeting. However, the following information had been conveyed inthere was relevant liaison communication at the parent-body level; see se:ction 7.2.
…
1.12Opening remarks
Opening remarks included:
Meeting logistics, review of communication practices, attendance recording, and registration and badge pick-up reminder
Primary topic areas were noted as follows:
Screen content coding
Software
Conformance
Verification testing
HDR
Verification testing
Development of TR
ICTCP support
Possible other SEI & VUI
Possible work on backward-compatibility (pending requirements)
Reference software
Corrigenda items for version 4
SHVC proposed additional verification testing
Frame repetition signalling
Test model texts and software manuals
Common test conditions for coding efficiency experiments (hasn't been under active development here recently; being considered more elsewhere)
Status of deliverables:
SCC text
SCC reference software
RExt & v1 conformance
Corresponding WG 11 outputs
Check meeting report
Key deliverables initially planned from this meeting:
ITU-T Consent for new edition of HEVC specification text including SCC extensions
ITU-T Consent for new edition of conformance and reference software
SCC specification Draft 6 (FDIS)
FDAM for RExt conformance (draft 6)
Possible additional verification test plan for SHVC
SHVC software Draft 4 (FDAM)
SHVC conformance Draft 5 (FDAM)
SCC Reference software [Consent]
SCC Conformance
SCC verification testing plan (postponed)
HDR outputs
Suggested practices draft
HDR verification test report
CEs?
ICTCP support
New HM, SHM, SCM document versions
A single meeting track was followed for most meeting discussions.
1.13Scheduling of discussions
Scheduling: Generally, meeting time was scheduled during 0900–2000 hours, with coffee and lunch breaks as convenient. The meeting had been announced to start with AHG reports and continue with parallel review on Screen Content Coding CE work and related contributions during the first few days. Ongoing scheduling refinements were announced on the group email reflector as needed.
Some particular scheduling notes are shown below, although not necessarily 100% accurate or complete:
Thu. 26 May, 1st day
1000–1300, Opening remarks, status review, AHG report review for AHGs 1–3 and 5–8 (GJS & JRO)
1530–1700, AHGs 9, 12, 13, 14 (GJS)
1700–1800 X0033 HDR/WCG Verification test (section 3.5) (GJS)
Fri. 27 May, 2nd day
0900–1045 Text for HDR/WCG coding practices report (section 3.4) (JRO)
1115–1300 X0033 HDR/WCG Verification test (section 3.5) (GJS)
1615–1830 SHVC testing for BT.2020 PQ HDR with BT.2020 SDR BL (section 3.5) (GJS)
1500–1600 parent-body joint meeting JCT-VC, Q6/16, MPEG Requirements & Video
1615–1715 parent-body joint meeting Q6/16, JPEG
1530–1900 Q6 plenary
Tue. 1 June, 6th day
0900–1000 parent-body joint meeting Q6/16, MPEG Requirements & Video
1030–1300 & 1430–2000 Remainders
Wed. 2 June, 7th day
0900–1030 WG 11 mid-week plenary
1100–1345 JCT-VC closing plenary
1.14Contribution topic overview
The approximate subject categories and quantity of contributions per category for the meeting were summarized and categorized as follows. Some plenary sessions were chaired by both co-chairmen, and others by only one. Chairing of other discussions is noted for particular topics.