Workplan
The presenter brought forward a workplan for next steps in this CE.
The plan requests that FhG encode and decode 48 items = 12 items x 2 downmixes (6 channel and 8 channel) x 2 “flavors” of downmix. Additionally there may be 4 calibration signals (each up to 8 minutes in length). The RM0 and benchmark signals are re-used (from the current listening test).
Max Neuendorf, FhG-IIS, requested that input waveforms be provided
The Chair requested that for future CEs all interested parted may get access to CE waveforms.
Dostları ilə paylaş: |