Module-c community Based Financial Management


Total Cost = (1) Running Cost + (2) Maintenance Cost + (3) Replacement



Yüklə 0,8 Mb.
Pdf görüntüsü
səhifə23/60
tarix06.06.2022
ölçüsü0,8 Mb.
#116686
1   ...   19   20   21   22   23   24   25   26   ...   60
Rural Water Supply Operation and Maintenance Manual

Total Cost = (1) Running Cost + (2) Maintenance Cost + (3) Replacement 
cost 


Ministry of Water, Irrigation and Electricity 
 Operation and Maintenance Management Manual 
Training Module - D 
Community Based Financial 
Management 
 
DEMEWOZ CONSULTANCY 
22
MODULE 
– D:
 
COMMUNITY BASED FINANCIAL MANAGEMENT FOR RURAL 
WATER SUPPLY SCHEMES 
The Total Cost is Supported by Users of the water scheme! 
Question: How do Users support the Total Cost? That is revenue, mainly 
water tariff paid by users. 
 
(2) Some idea on the cost to be borne: How much do we need to 
save? 
Based on an extensive study conducted in Ethiopia, a required amount of 
maintenance cost is estimated to account for 5 % of total replacement cost 
annually. In this manual, cost of a hand-pump is considered. We shall use an 
example of average cost of a hand pump at Birr 20,000.00
for this paper.
Revenue = Tariff x Quantity 
Example: 
Total replacement cost: Birr 20,000.00 
Annual Maintenance cost: Birr 20,000 x 5 % = Birr 1,000.00 
Monthly Maintenance cost: Birr 1,000 / 12 months = Birr 83.30


Ministry of Water, Irrigation and Electricity 
 Operation and Maintenance Management Manual 
Training Module - D 
Community Based Financial 
Management 
 
DEMEWOZ CONSULTANCY 
23
MODULE 
– D:
 
COMMUNITY BASED FINANCIAL MANAGEMENT FOR RURAL 
WATER SUPPLY SCHEMES 
Taking an estimated price of a hand pump at Birr 20,000, a WASHCO 
accumulate at least Birr 2,000.00 annually, while this can be interpreted as 
monthly reserve with an amount of Birr 167.00. 
 
Note: The above calculation is prepared without any considerations on interest rate, inflation rate, 
and foreign currency exchange rate.
Example: 
Cost of a hand pump: Birr 20,000.00 
Service period: 10 years 
Annual Replacement Reserve: Birr 20,000/10 = Birr 2,000.00 
Monthly Replacement Reserve: Birr 2,000 / 12 months = Birr 167.00


Ministry of Water, Irrigation and Electricity 

Yüklə 0,8 Mb.

Dostları ilə paylaş:
1   ...   19   20   21   22   23   24   25   26   ...   60




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin