All component should adhere to the overall RP Project family:

  • Constraint Objectives
    • Regulatory Constraints
    • Academic Constraints
    • Safety Constraints
  • Resource Objectives
    • People Resource
    • Equipment Resources
    • Materials Costs
    • Labor Costs
  • Scope Objectives
  • Technology Objectives


Specific to Project P08202

  • Specific to Project P08202

  • Design will adhere to the general specifications for all teams

  • Design will use the same COTS Motor Controller(s) as teams P08205, P08206 and P08208

  • Design will use (if possible) the same Micro Controller Unit as P08206, P08205 and P08208 with an alternate communications protocol as P08206 (eg. If P08206 uses a CAN protocol, P08202 will use SPI protocol or I2C) 

  • Specific to Project P08205


  • Yüklə 493 b.

    Dostları ilə paylaş:
1   2   3   4   5   6   7   8   9   10   ...   23




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin