Provisional allocation of documents to agenda items



Yüklə 2,28 Mb.
səhifə5/7
tarix03.01.2022
ölçüsü2,28 Mb.
#46660
1   2   3   4   5   6   7
9

Release 8

work items
















9.1

Release 8 documents for information

Wednesday















Miscellaneous documents provided for information.







C1-080210

Summary of current IETF documents on SIPPING

Alcatel-Lucent / Keith Drage

INFO

Noted







C1-080211

Summary of current IETF documents on SIP

Alcatel-Lucent / Keith Drage

INFO

Noted







C1-080212

Summary of current IETF documents on MMUSIC

Alcatel-Lucent / Keith Drage

INFO

Noted







C1-080213

Summary of current IETF documents on SIMPLE

Alcatel-Lucent / Keith Drage

INFO

Noted







C1-080214

Summary of current IETF documents on XCON

Alcatel-Lucent / Keith Drage

INFO

Noted







C1-080215

Summary of current IETF documents on GEOPRIV

Alcatel-Lucent / Keith Drage

INFO

Noted







C1-080216

Summary of current IETF documents on ECRIT

Alcatel-Lucent / Keith Drage

INFO

Noted







C1-080217

Summary of current IETF documents on MEDIACTRL

Alcatel-Lucent / Keith Drage

INFO

Noted






















9.2
















SAE - issues.

This work item covers all issues for CT1.



9.2.1

Work Items: SAES-St3-CT1imp

SAES-St3-netsel

Tuesday














High level and common (for all accesses) functions:

Stage 3 SAE impact on services, network functions and capabilities

Stage 2 & 3 for Network selection procedures









C1-080279

Reference version TR 24.801, v 0.5.1

TR Rapporteur




Withdrawn

TR








C1-080335

Reference version TR 24.801, v 0.5.1

TR Rapporteur




Noted

TR

Reference version of the TR









C1-080124

Discussion paper on division of non-3GPP UE - EPC functions to TSes

Samsung




Noted

Discussion









C1-080152

Discussion on the scope of the proposed technical specifications

Qualcomm Europe/Gerardo




Noted

Discussion









C1-080153

Agreement for the documentation of normative specifications

Qualcomm Europe/Gerardo

24.801

Revised to C1-080434







C1-080125

Proposed scope and skeleton of TS 24.hkl

Samsung




Revised to C1-080435

New TS skeleton









C1-080150

Skeleton of TS 24.abc

Qualcomm Europe/Gerardo




Revised to C1-080437

TS








C1-080151

Scope of TS 24.abc

Qualcomm Europe/Gerardo




Revised to C1-080436

New TS








C1-080246

Draft Scope and Template for TS 24.efg

Rapporteur(Motorola)




Revised to C1-080438

New TS








C1-080218

List of issues that require resolution in order to determine document structure

Alcatel-Lucent / Keith Drage




Noted

INFO


All issues are addressed by C1-080204, 205 and 282.







C1-080205

Decision on specification work for E-UTRA

Ericsson

24.801

Revised to C1-080439

  • New PDs for EMM / ESM

  • New TS (describing procedures)

  • Pointer to 24.007 / 24.008 (for IEs and basic encoding rules)







C1-080204

EMM Protocol Discriminator

Nokia

Discussion


Noted

Conclusions merged into C1-080439









C1-080282

ESM Protocol Discriminator

Nokia Siemens Networks

Discussion


Noted

Conclusions merged into C1-080439










C1-080280

Revised WID for CT aspects of System Architecture Evolution

Nokia Siemens Networks

WID

Revised to C1-080440

The TR will not continue to be maintained on material that are transferred to the new TSs (covered by the CT1-WID) to avoid duplication of documentation.









C1-080281

WID for CT1 aspects of System Architecture Evolution

Nokia Siemens Networks

WID

Revised to C1-080441

It was commented that the goal is to complete the work (100%) on SAE by December 2008. In order to achieve this, it was questioned if the TS should be sent to the CT#41 in September for approval. Due to this, it was decided not to send the TSs to the September plenary for approval, but to maintain control of the TSs in the WG until they were sufficiently stable, and not put them under version control too early.









C1-080013

SAE:Synchronization of Allowed CSG List

ZTE

24.801

Postponed

This issue is not completed by stage 1 and stage 2.









C1-080014

SAE : Selective Access of CSG Area

ZTE

24.801

Postponed

This was seen as service requirements.









C1-080123

Discussion on loss of DL NAS messages and duplication detection

Samsung

Discussion

Noted

CT1 was of the opinion that NAS message duplication detection would be useful.

Further, CT1 was of the opinion that similar handling of uplink and downlink would be useful.

The outgoing LS in 399 will inform RAN about this









C1-080203

Clarification for FFS in section 6.2.5.1.2

Marvell

24.801

Postponed

The related stage 2 was not handled at the SA2 meeting.









C1-080298

24.801 Network Selection

Alcatel-Lucent

24.801

Postponed

It would be useful to keep PLMN selection in one group (SA2 or CT1). This could be useful to discuss and conclude on in the joint CT1/SA2 meeting in February.









C1-080314

Access control in E-UTRAN

NTT DoCoMo

Discussion

Revised to C1-080442







C1-080315

CS Fallback : Overview and Open Issue

NTT DoCoMo

Discussion

Noted







C1-080316

IP address allocation in UTRAN/GERAN initial attach

NTT DoCoMo

Discussion

Revised to C1-080443







C1-080434

Agreement for the documentation of normative specifications

Qualcomm Europe/Gerardo

24.801

Agreed

Revision of C1-080153









C1-080435

Proposed scope and skeleton of TS 24.hkl

Samsung




Revised to C1-080568

Revision of C1-080125

New TS skeleton








C1-080436

Scope of TS 24.abc

Qualcomm Europe/Gerardo




Agreed

Revision of C1-080151

New TS








C1-080437

Skeleton of TS 24.abc

Qualcomm Europe/Gerardo




Agreed

Revision of C1-080150

TS








C1-080438

Draft Scope and Template for TS 24.efg

Rapporteur(Motorola)




Revised to C1-080569

Revision of C1-080246

New TS








C1-080439

Decision on specification work for E-UTRA

Ericsson

24.801

Agreed

Revision of C1-080205



  • New PDs for EMM / ESM

  • New TS (describing procedures)

  • Pointer to 24.007 / 24.008 (for IEs and basic encoding rules)







C1-080440

Revised WID for CT aspects of System Architecture Evolution

Nokia Siemens Networks

WID

Revised to C1-080567

Revision of C1-080280

The TR will not continue to be maintained on material that are transferred to the new TSs (covered by the CT1-WID) to avoid duplication of documentation.








C1-080441

WID for CT1 aspects of System Architecture Evolution

Nokia Siemens Networks

WID

Agreed

Revision of C1-080281

It was commented that the goal is to complete the work (100%) on SAE by December 2008. In order to achieve this, it was questioned if the TS should be sent to the CT#41 in September for approval. Due to this, it was decided not to send the TSs to the September plenary for approval, but to maintain control of the TSs in the WG until they were sufficiently stable, and not put them under version control too early.








C1-080442

Access control in E-UTRAN

NTT DoCoMo

Discussion

Revised to C1-080570

Revision of C1-080314









C1-080443

IP address allocation in UTRAN/GERAN initial attach

NTT DoCoMo

Discussion

Agreed

Revision of C1-080316









C1-080567

Revised WID for CT aspects of System Architecture Evolution

Nokia Siemens Networks

WID

Agreed

The WID is technically endorsed by CT3 and CT4.

Revision of C1-080440

Revision of C1-080280

The TR will not continue to be maintained on material that are transferred to the new TSs (covered by the CT1-WID) to avoid duplication of documentation.

The only change is to add CATT as supporting company.









C1-080568

Proposed scope and skeleton of TS 24.hkl

Samsung




Agreed

Revision of C1-080435

Revision of C1-080125

New TS skeleton









C1-080569

Draft Scope and Template for TS 24.efg

Rapporteur(Motorola)




Agreed

Revision of C1-080438

Revision of C1-080246

New TS








C1-080570

Access control in E-UTRAN

NTT DoCoMo

Discussion

Agreed

Revision of C1-080442

Revision of C1-080314























9.2.2

Work Items: SAES-St3-NASmob

SAES-St3-BCQOS

SAES-St3-CT1sec-LTE

Tuesday














SAE for LTE access:

Stage 3 for UE NAS mobility procedures in idle and active mode

Stage 3 for Session management, bearer control and QoS aspects

Stage 3 for security aspects for LTE Access











C1-080015

SAE :GMM & EMM Relationship

ZTE

24.801

Postponed

Related with LS in C1-080451









C1-080016

SAE :Correction of PDN Context

ZTE

24.801

Withdrawn







C1-080061

TR24.801 - The impact of ISR on TAU Accept message

Huawei

24.801

Postponed







C1-080062

TR24.801 - The impact of ISR on periodic tracking area update timer T3412

Huawei

24.801

Postponed







C1-080063

TR24.801 - A new scenario for TAU procedure from ISR

Huawei

24.801

Postponed







C1-080064

TR24.801 - A new "attach type" for attach request message

Huawei

24.801

Agreed







C1-080065

TR24.801 - the handling for PTI mismatching case

Huawei

24.801

Revised to C1-080454







C1-080066

TR24.801 - Discussion on the presence for EPS bearer context status IE

Huawei

24.801

Revised to C1-080455







C1-080067

TR24.801 - Discussion on the handling of Dedicated Bearer Modification Procedure without QoS

Huawei

24.801

Revised to C1-080456







C1-080068

TR24.801 - Discussion of relationship of SM and ESM entity

Huawei

24.801

Revised to C1-080457







C1-080069

TR24.801 - remove the FFS on Static IP address

Huawei

24.801

Revised to C1-080539







C1-080070

TR24.801 - Discussion on supporting uplink signalling with Service request

Huawei

24.801

Withdrawn

Request that 0070 and 0290 be discussed in sequence.

Content merged with C1-080540








C1-080071

TR24.801 - A particular abnormal case in Attach procedure

Huawei

24.801

Postponed

293 & 85 are related

This was considered as an abnormal case.

It was agreed to focus on normal and unsuccessful cases at this point in time. Abnormal cases can then be added at a later point in time when the text in the TSs becomes more complete.









C1-080072

TR24.801 - Synchronize the handling of S-TMSI

Huawei

24.801

Withdrawn

Covered by 0197 so concerns merged into revision of 0197.









C1-080073

TR24.801 - Remove the FFS about two IP address per bearer

Huawei

24.801

Withdrawn

0073 and 0154 will be revised to C1-080418









C1-080074

TR24.801 - TA List Unchanged optimization

Huawei

24.801

Revised to C1-070547







C1-080075

SAE : ECM state

ZTE

24.801

Withdrawn

0075 1st then 0241 and on that see how to proceed with 0077 and 0079.

0241 use same term but relate back to Stage 2.

Progress with 0241 and topics of GUTI that is in 0075 will be merged to revision of 0197.









C1-080076

SAE :GUTI Reallocation

ZTE

24.801

Withdrawn

Merged into revision of 0197









C1-080077

SAE :Service Request

ZTE

24.801

Withdrawn







C1-080078

SAE : GUTI Handling

ZTE

24.801

Withdrawn

Concerns to be checked and merged into revision of 0197.









C1-080079

SAE : Identification

ZTE

24.801

Withdrawn







C1-080085

Notification of Radio Bearer establishment at Attach

Fujitsu

Discussion

Postponed

This was considered as an abnormal case.

It was agreed to focus on normal and unsuccessful cases at this point in time. Abnormal cases can then be added at a later point in time when the text in the TSs becomes more complete.








C1-080086

Notification of Radio Bearer establishment at Tracking Area Update

Fujitsu

Discussion

Postponed

This was considered as an abnormal case.

It was agreed to focus on normal and unsuccessful cases at this point in time. Abnormal cases can then be added at a later point in time when the text in the TSs becomes more complete.








C1-080087

Last Visited TAI

CATT

24.801

Revised to C1-080548







C1-080088

Tracking Area and TAI

CATT

24.801

Revised to C1-080550







C1-080154

IP address allocation via NAS signalling

Qualcomm Europe/Gerardo

24.801

Revised to C1-080418.

0073 and 0154 will be merged in the revision.









C1-080155

IPv4 address allocation via DHCPv4

Qualcomm Europe/Gerardo

24.801

Agreed







C1-080156

IPv6 prefix delegation via DHCPv6

Qualcomm Europe/Gerardo

24.801

Revised to C1-080551







C1-080196

CR to 24.801 : Activation of dedicated bearers at attach

Ericsson

Discussion

Withdrawn

Content partly incorporated in C1-080292









C1-080197

CR to 24.801 : Introduction of the GUTI concept

Ericsson

Discussion


Revised to C1-080419

This will be basis for further discussion.











C1-080198

CR to 24.801 : Authentication and Security Mode Command procedures

Ericsson

Discussion

Revised to C1-080561







C1-080206

Update of 6.5 and 6.6. General message format and IE coding

Ericsson

24.801

Revised to C1-080562







C1-080207

Update of 6.2.5.1 Attach procedure initiation

Ericsson

24.801

Revised to C1-080563







C1-080208

Update of 6.2.5.1 Attach accepted by the network

Ericsson

24.801

Revised to C1-080564

0291 and 0208 has similarities on provision of APN.









C1-080209

Update of 6.2.5.1 Attach not accepted by the network

Ericsson

24.801

Revised to C1-080565







C1-080241

Including Term ECM

Vodafone

24.801

Revised to C1-080420







C1-080283

Next steps on the way to an SM protocol

Nokia Siemens Networks, Nokia

Discussion

Noted

The rapporteur invited interested parties to inform him about intended contributions on SM, in order to have a coordinated approach to future contributions on SM.









C1-080290

CR 24.801: clarifications on service request procedure

NEC

24.801

Revised to C1-080540








C1-080291

CR 24.801: default bearer context activation

NEC

24.801

Revised to C1-080566

0161 and 0291 discuss use of PCO part, some overlap on this use of PCO

0291 and 0208 has similarities on provision of APN.








C1-080292

CR 24.801: attach with dedicated bearer activation

NEC

24.801

Revised to C1-080552







C1-080293

CR 24.801: conditions for sending ATTACH COMPLETE

NEC

24.801

Agreed







C1-080294

CR 24.801: paging initiation for NAS signalling

NEC

24.801

Agreed







C1-080295

CR 24.801: reject causes for EMM procedures

NEC

24.801

Revised to C1-080450

Related outgoing LS in C1-080451 to clarify relation between “EPS service” and “GPRS service” if any









C1-080317

Proposal on Service Request Timer(T3417 & T3419)

NTT DoCoMo




Postponed

Discussion









C1-080418

IP address allocation via NAS signalling

Qualcomm Europe/Gerardo

24.801

Agreed

Revision of C1-080154.

0073 and 0154 will be merged in the revision.








C1-080419

CR to 24.801 : Introduction of the GUTI concept

Ericsson

Discussion


Agreed

Revision of C1-080197

This will be basis for further discussion.









C1-080420

Including Term ECM

Vodafone

24.801

Agreed

Revision of C1-080241









C1-080450

CR 24.801: reject causes for EMM procedures

NEC

24.801

Agreed

Revision of C1-080295

Related outgoing LS in C1-080451 to clarify relation between “EPS service” and “GPRS service” if any








C1-080454

TR24.801 - the handling for PTI mismatching case

Huawei

24.801

Agreed

Revision of C1-080065









C1-080455

TR24.801 - Discussion on the presence for EPS bearer context status IE

Huawei

24.801

Agreed

Revision of C1-080066









C1-080456

TR24.801 - Discussion on the handling of Dedicated Bearer Modification Procedure without QoS

Huawei

24.801

Agreed

Revision of C1-080067









C1-080457

TR24.801 - Discussion of relationship of SM and ESM entity

Huawei

24.801

Revised to C1-080650

Revision of C1-080068









C1-080539

TR24.801 - remove the FFS on Static IP address

Huawei

24.801

Agreed

Revision of C1-080069









C1-080540

CR 24.801: clarifications on service request procedure

NEC

24.801

Agreed

Revision of C1-080290










C1-080547

TR24.801 - TA List Unchanged optimization

Huawei

24.801

Agreed

Revision of C1-070074









C1-080548

Last Visited TAI

CATT

24.801

Agreed

Revision of C1-080087

The term last visited registered TAI should be considered changed to a shorter term that would not give the readers incorrect impression.








C1-080550

Tracking Area and TAI

CATT

24.801

Agreed

Revision of C1-080088









C1-080551

IPv6 prefix delegation via DHCPv6

Qualcomm Europe/Gerardo

24.801

Agreed

Revision of C1-080156









C1-080552

CR 24.801: attach with dedicated bearer activation

NEC

24.801

Agreed

Revision of C1-080292









C1-080561

CR to 24.801 : Authentication and Security Mode Command procedures

Ericsson

Discussion

Revised to C1-080651

Revision of C1-080198









C1-080562

Update of 6.5 and 6.6. General message format and IE coding

Ericsson

24.801

Agreed

Revision of C1-080206









C1-080563

Update of 6.2.5.1 Attach procedure initiation

Ericsson

24.801

Agreed

Revision of C1-080207









C1-080564

Update of 6.2.5.1 Attach accepted by the network

Ericsson

24.801

Revised to C1-080652

Revision of C1-080208

0291 and 0208 has similarities on provision of APN.








C1-080565

Update of 6.2.5.1 Attach not accepted by the network

Ericsson

24.801

Agreed

Revision of C1-080209









C1-080566

CR 24.801: default bearer context activation

NEC

24.801

Agreed

Revision of C1-080291

0161 and 0291 discuss use of PCO part, some overlap on this use of PCO

0291 and 0208 has similarities on provision of APN.









C1-080650

TR24.801 - Discussion of relationship of SM and ESM entity

Huawei

24.801

Agreed

Revision of C1-080457

Revision of C1-080068








C1-080651

CR to 24.801 : Authentication and Security Mode Command procedures

Ericsson

Discussion

Agreed

Revision of C1-080561

Revision of C1-080198








C1-080652

Update of 6.2.5.1 Attach accepted by the network

Ericsson

24.801

Agreed

Revision of C1-080564

Revision of C1-080208

0291 and 0208 has similarities on provision of APN.
























9.2.3

Work Items: SAES-St3-intersys-2_3G

SAES-St3-intersys-C2k

Tuesday














SAE for Interoperation between LTE and legacy cellular PS accesses:

Stage 3 for Inter-system mobility between E-UTRAN and 2G/3G

Stage 3 for Inter-system mobility between E-UTRAN and CDMA2000









C1-080080

LTE to HRPD Optimized Handover

Nortel

Discussion

Revised to C1-080554







C1-080242

GUTI handling during RAU from E-UTRAN to UTRAN/GERAN

Vodafone

24.801

Revised to C1-080421

Overlapping parts (to 0197) will be removed.









C1-080306

Issues on EMM and GMM state synchronisation

Qualcomm Europe

Discussion

Noted

The topic is candidate for joint discussions in CT1 & SA2.









C1-080421

GUTI handling during RAU from E-UTRAN to UTRAN/GERAN

Vodafone

24.801

Postponed

Revision of C1-080242

Overlapping parts (to 0197) will be removed.








C1-080554

LTE to HRPD Optimized Handover

Nortel

Discussion

Agreed

Revision of C1-080080
























9.2.4

Work Items: SAES-St3-non-3GPP

SAES-St3-CT1MIP

SAES-St3-intersys-n3GPP

SAES-St3-CT1sec-MIP

Tuesday














SAE for support of non-3GPP accesses:

Stage 3 for Access to the EPC via non-3GPP access networks

Stage 3 for Inter-system mobility between E-UTRAN and non 3GPP accesses

Stage 3 for Mobility management based on mobile IP

Stage 3 security aspects for non3GPP Access









C1-080157

DSMIPv6 general section update

Qualcomm Europe/Gerardo

24.801

Agreed







C1-080158

IPsec security association establishment through IKEv2

Qualcomm Europe/Gerardo

24.801

Revised to C1-080555







C1-080159

DSMIPv6 detach procedure

Qualcomm Europe/Gerardo

24.801

Revised to C1-080556







C1-080160

DSMIPv6 returning home scenario

Qualcomm Europe/Gerardo

24.801

Revised to C1-080557







C1-080161

Home agent discovery during E-UTRAN attach

Qualcomm Europe/Gerardo

24.801

Revised to C1-080559

0161 and 0291 discuss use of PCO part, some overlap on this use of PCO









C1-080162

Home agent discovery via DHCPv6

Qualcomm Europe/Gerardo

24.801

Revised to C1-080560







C1-080296

CR 24.801: mandatory support of MOBIKE in ePDG

NEC

24.801

Agreed







C1-080555

IPsec security association establishment through IKEv2

Qualcomm Europe/Gerardo

24.801

Revised to C1-080653

Revision of C1-080158









C1-080556

DSMIPv6 detach procedure

Qualcomm Europe/Gerardo

24.801

Revised to C1-080654

Revision of C1-080159









C1-080557

DSMIPv6 returning home scenario

Qualcomm Europe/Gerardo

24.801

Agreed

Revision of C1-080160









C1-080559

Home agent discovery during E-UTRAN attach

Qualcomm Europe/Gerardo

24.801

Agreed

Revision of C1-080161

0161 and 0291 discuss use of PCO part, some overlap on this use of PCO








C1-080560

Home agent discovery via DHCPv6

Qualcomm Europe/Gerardo

24.801

Revised to C1-080655

Revision of C1-080162









C1-080653

IPsec security association establishment through IKEv2

Qualcomm Europe/Gerardo

24.801

Agreed

Revision of C1-080555

Revision of C1-080158

The only change is to properly introduce and reference the references.









C1-080654

DSMIPv6 detach procedure

Qualcomm Europe/Gerardo

24.801

Agreed

Revision of C1-080556

Revision of C1-080159

The only change is to properly reference the references









C1-080655

Home agent discovery via DHCPv6

Qualcomm Europe/Gerardo

24.801

Agreed

Revision of C1-080560

Revision of C1-080162

The only change is to properly reference the references and change section to subclause.
























9.3

Work Item: PRIOR-MM

Tuesday














Multimedia priority service.
































































9.4
















AS – MRFC protocol.

This covers both the study item and the work item.



9.4.1

Study Item: MRFC

Tuesday














Study Item for AS – MRFC protocol.







C1-080249

24.880 outstanding issues

HP




Noted

INFO








C1-080250

Charging requirements clarification

HP




Noted

Discussion









C1-080251

Editorial updates : mediactrl drafts

HP

24.880

Agreed























9.4.2

Work Item: MRFC-AS

Tuesday














Work Item for AS – MRFC protocol. This is based on the corresponding Study Item.
































































9.5

Work Item: UUSIW

Wednesday















User – User Signalling interworking
































































9.6

Work Item: PctCbl-Intw

Wednesday















Packetcable – Protocol enhancements.







C1-080243

Completion of CIC and DAI requirements for MGCF

Nortel

24.229

Revised to C1-080472

Correct spelling mistake









C1-080472

Completion of CIC and DAI requirements for MGCF

Nortel

24.229

Agreed

Revision of C1-080243

Correct spelling mistake























9.7

Work Item: PctCbl-Deploy

Wednesday















Packetcable – Regulatory requirements.
































































9.8

Work Item: PctCbl-Sec

Wednesday















Packetcable – Security requirements.







C1-080089

Miscelanous Corrections on SIP Digest

Nokia Siemens Networks

24.229

Revised to C1-080473







C1-080219

Enhancements to security introduction text

Alcatel-Lucent / Keith Drage

24.229

Revised to C1-080474







C1-080473

Miscelanous Corrections on SIP Digest

Nokia Siemens Networks

24.229

Agreed

Revision of C1-080089









C1-080474

Enhancements to security introduction text

Alcatel-Lucent / Keith Drage

24.229

Agreed

Revision of C1-080219
























9.9

Work Item: EVA

Thursday














Enhancements for VGCS applications.







C1-080286

TCRT: Clarification of the channel to be used for uplink access

Nokia Siemens Networks

43.068

Revised to C1-080452







C1-080452

TCRT: Clarification of the channel to be used for uplink access

Nokia Siemens Networks

43.068

Agreed

Revision of C1-080286
























9.10
















Personal Network Management.

This cover both the stage 2 and the stage 3 issues.




9.10.1

Work Item: PNM

Wednesday















This agenda item is PNM CRs on stage 2

The TS 23.259 “Personal Network Management (PNM); Procedures and Information Flows; Stage 2” was seen sufficiently stable to be sent to CT#39 for approval.











C1-080234

TS 23.259 v120 PNM

Vodafone




Noted

Info








C1-080185

Revised PNM WID

Research in Motion




Revised to C1-080460

WID








C1-080177

Error procedures for the priority handling of the session redirection in IMS

Huawei

23.259

Revised to C1-080461







C1-080178

Error procedures for the priority handling of the session redirection in the CS domain

Huawei

23.259

Revised to C1-080462







C1-080184

PNM Stage 1 - Stage 2 Gap Analysis

Research in Motion

Discussion

Noted

Questioned if all requirements are covered.

Commented that the successful cases and the signalling flows were meant to cover relevant aspects to achieve the stage 1 service requirements and not give a complete picture.

PNE is currently not covered by TS 23.259 and was not intended to be covered by the current stage 2/3 WID (even though this is indicated by the title).










C1-080186

Clarifying PNM Scope

Research in Motion

23.259

Revised to C1-080458

No company has contributed to the PNE part, thus the TS 23.259 lacks a major part of the PNM functionality.

The title will not be changed.

Outgoing LS in C1-080459 to indicate this concern.









C1-080187

PN Configuration Procedures Editorials

Research in Motion

23.259

Agreed







C1-080188

PN Registration and Configuration Restructuring

Research in Motion

23.259

Agreed

This CR must be made 1st, before the other CRs are incorporated.









C1-080189

PN Configuration Consolidation

Research in Motion

23.259

Revised to C1-080463







C1-080190

PN Access Control Cleanup

Research in Motion

23.259

Revised to C1-080464







C1-080236

PNM AC Logic

Vodafone

23.259

Revised to C1-080465







C1-080237

Clause 6 Update

Vodafone

23.259

Agreed







C1-080310

Interdomain Networking

ZTE

23.259

Revised to C1-080466

Questioned if the flow was useful to add until it was resolved how the CSRN / IMRN was transported to the PNM AS.

Questioned if this was a general issue or a PNM-specific issue. If general, which spec to document it in? This can be compared with issues documented in VCC and CSI, thus document this in PNM.








C1-080458

Clarifying PNM Scope

Research in Motion

23.259

Agreed

Revision of C1-080186

No company has contributed to the PNE part, thus the TS 23.259 lacks a major part of the PNM functionality.

Outgoing LS in C1-080459 to indicate this concern.









C1-080460

Revised PNM WID

Research in Motion




Agreed

Revision of C1-080185

WID








C1-080461

Error procedures for the priority handling of the session redirection in IMS

Huawei

23.259

Agreed

Revision of C1-080177









C1-080462

Error procedures for the priority handling of the session redirection in the CS domain

Huawei

23.259

Agreed

Revision of C1-080178









C1-080463

PN Configuration Consolidation

Research in Motion

23.259

Agreed

Revision of C1-080189









C1-080464

PN Access Control Cleanup

Research in Motion

23.259

Revised to C1-080573

Revision of C1-080190









C1-080465

PNM AC Logic

Vodafone

23.259

Agreed

Revision of C1-080236









C1-080466

Interdomain Networking

ZTE

23.259

Revision of C1-080310

Questioned if the flow was useful to add until it was resolved how the CSRN / IMRN was transported to the PNM AS.

Questioned if this was a general issue or a PNM-specific issue. If general, which spec to document it in? This can be compared with issues documented in VCC and CSI, thus document this in PNM.








C1-080573

PN Access Control Cleanup

Research in Motion

23.259

Agreed

Revision of C1-080464

Revision of C1-080190























9.10.2

Work Item:

PNM


Wednesday













This agenda item is PNM CRs on stage 3








C1-080235

TS 24.259 v030 PNM

Vodafone

Info

Noted








C1-080191

PN Access Control in IM CN Subsystem

Research in Motion

24.259

Revised to C1-080467







C1-080192

Signalling Flow for PN Access Control in IM CN Subsystem

Research in Motion

24.259

Revised to C1-080468







C1-080193

PN Stage 3 Flows Cleanup

Research in Motion

24.259

Agreed







C1-080238

Roles for PN-configuration and PN-query

Vodafone

24.259

Agreed







C1-080239

Signalling flow for PN UE Name changing

Vodafone

24.259

Agreed

The rapporteur was asked to write Sh and not sh for the Sh interface.









C1-080240

signalling flow cleanup

Vodafone

24.259

Agreed







C1-080307

Signalling flow for interdomain networking

ZTE

24.259

Revised to C1-080469







C1-080308

gsmSCF Capability in PN UE redirection

ZTE

24.259

Revised to C1-080470

The styles must be corrected.









C1-080309

PN UE role in Access Control

ZTE

24.259

Revised to C1-080471







C1-080311

Discussion: PNM stage 3 Access Control protocol

Panasonic

Discussion

Withdrawn







C1-080312

CR against 24.259: Stage 3 Access Control procedures

Panasonic

24.259

Withdrawn







C1-080313

CR against 24.259: Signaling flows for Access Control

Panasonic

24.259

Withdrawn







C1-080467

PN Access Control in IM CN Subsystem

Research in Motion

24.259

Revised to C1-080657

Revision of C1-080191









C1-080468

Signalling Flow for PN Access Control in IM CN Subsystem

Research in Motion

24.259

Agreed

Revision of C1-080192









C1-080469

Signalling flow for interdomain networking

ZTE

24.259

Agreed

Revision of C1-080307









C1-080470

gsmSCF Capability in PN UE redirection

ZTE

24.259

Revised to C1-080656

Revision of C1-080308

The styles must be corrected.








C1-080471

PN UE role in Access Control

ZTE

24.259

Agreed

Revision of C1-080309









C1-080656

gsmSCF Capability in PN UE redirection

ZTE

24.259

Agreed

Revision of C1-080470

Revision of C1-080308

The styles must be corrected.









C1-080657

PN Access Control in IM CN Subsystem

Research in Motion

24.259

Revised to C1-080659

Revision of C1-080467

Revision of C1-080191








C1-080659

PN Access Control in IM CN Subsystem

Research in Motion

24.259

Agreed

Revision of C1-080657

Revision of C1-080467

Revision of C1-080191
























9.11

Work Item:

IMSProtoc2

Thursday














IP Multimedia Core Network Subsystem - IMS Stage3 Protocol Evolution for Rel-8.







C1-080008

Procedure at S-CSCF

Alcatel-Lucent/Milo Orsic

24.229

Revised to C1-080600








C1-080009

Empty RES

Alcatel-Lucent/Milo Orsic

24.229

Agreed








C1-080010

Alias URI

Alcatel-Lucent/Milo Orsic

24.229

Revised to C1-080601








C1-080011

Notification at S-CSCF

Alcatel-Lucent/Milo Orsic

24.229

Revised to C1-080602








C1-080012

NAT traversal

Alcatel-Lucent/Milo Orsic

24.229

Revised to C1-080604

Rel-7 CR in C1-080603

It was decided that this should also become a Rel-7 CR.








C1-080057

Use of P-Served user draft

LM Ericsson




Noted

Discussion



Two different proposals were made to solve the outlined problem. There was no conclusion on which solution should be taken. Ericsson (Alf) took an action item to organize a conference call on this issue, to find a compromise solution. The phone conference will be announced on the CT1 reflector.







C1-080060

Use of p-Served User draft for Call forwarding

LM Ericsson

24.229

Postponed








C1-080105

Enabling service triggering after call forwarding

Nokia Siemens Networks, Nokia, Vodafone

24.229

Postponed








C1-080163

Allow Multiple Registrations in Rel 8

Qualcomm Europe/Roozbeh

24.229

Postponed








C1-080172

Handling of 3GPP Access Network Info at the P-CSCF

Huawei

24.229

Withdrawn








C1-080200

IPv4 and IPv6 support

Telecom Italia

24.229

Revised to C1-080609








C1-080201

P-CSCF access awareness

Telecom Italia




Noted

Discussion









C1-080202

P-CSCF awareness for 3GPP accesses

Telecom Italia

24.229

Revised to C1-080605








C1-080244

Procedures at IBCF and P-CSCF for the optional support of ISUP encapsulation within IMS

Nortel

24.229

Revised to C1-080610








C1-080277

Discussion of need for enhancement to ISC interface

Alcatel-Lucent / Eric Henrikson




Noted

Discussion



The problem described in the discussion paper was acknowledged and it was said, that steps have to be taken to solve it. The possible solution was discussed, but it was too early in discussion to come to a final agreement. Alcatel-Lucent (Keith) took an action item to set up a conference call on this issue before the next CT1 meeting. The conference call will be announced on the CT1 mailing list.







C1-080278

B2BUA AS influence of filter criteria evaluation

Alcatel-Lucent / Eric Henrikson

23.218

Postponed








C1-080320

Annex K: ICE procedures for the IBCF

LM Ericsson

24.229

Revised to C1-080611








C1-080323

Wildcarded Public User Identity: P-CSCF impact

LM Ericsson

24.229

Revised to C1-080612








C1-080324

Wildcarded Public User Identity: S-CSCF impact

LM Ericsson

24.229

Revised to C1-080613








C1-080405

Correction to user initiated mergency re-registration

Qualcomm Europe/Roozbeh

24.229

Agreed

Revision of C1-080143

WI changed to IMSProtoc2 as this is a pure rel-8 change.








C1-080513

Correction on the value used for P-Preferred-Identity header at UE

NTT

24.229

Agreed

Revision of C1-080082

TEI7

What is the correct WI for this CR?



This is changed to a Rel-8 only CR. IMSProtoc2 is the correct Work Item. The revision of the original contribution has been moved to Agenda Item 9.11.







C1-080600

Procedure at S-CSCF

Alcatel-Lucent/Milo Orsic

24.229

Agreed

Revision of C1-080008

Only change is to correct the clauses affected on the cover page.








C1-080601

Alias URI

Alcatel-Lucent/Milo Orsic

24.229

Agreed

Revision of C1-080010










C1-080602

Notification at S-CSCF

Alcatel-Lucent/Milo Orsic

24.229

Revised to C1-080631

Revision of C1-080011

This is currently a Rel-8 only CR. Based on the revision it has to be decided whether this CR also should go into earlier releases.








C1-080605

P-CSCF awareness for 3GPP accesses

Telecom Italia

24.229

Revised to C1-080632

Revision of C1-080202










C1-080609

IPv4 and IPv6 support

Telecom Italia

24.229

Agreed

Revision of C1-080200










C1-080610

Procedures at IBCF and P-CSCF for the optional support of ISUP encapsulation within IMS

Nortel

24.229

Revised to C1-080649

Revision of C1-080244










C1-080611

Annex K: ICE procedures for the IBCF

LM Ericsson

24.229

Revised to C1-080643

Revision of C1-080320










C1-080612

Wildcarded Public User Identity: P-CSCF impact

LM Ericsson

24.229

Agreed

Revision of C1-080323










C1-080613

Wildcarded Public User Identity: S-CSCF impact

LM Ericsson

24.229

Revised to C1-080644

Revision of C1-080324










C1-080631

Notification at S-CSCF

Alcatel-Lucent/Milo Orsic

24.229

Agreed

Revision of C1-080602

Revision of C1-080011

This is currently a Rel-8 only CR. Based on the revision it has to be decided whether this CR also should go into earlier releases.


The only change is to remove the word "either" from the first change.







C1-080632

P-CSCF awareness for 3GPP accesses

Telecom Italia

24.229

Revised to C1-080571

Revision of C1-080605

Revision of C1-080202








C1-080643

Annex K: ICE procedures for the IBCF

LM Ericsson

24.229

Agreed

Revision of C1-080611

Revision of C1-080320

The only change is to convert the second new Note in subclause K.2.4.7.1 to normative text.









C1-080644

Wildcarded Public User Identity: S-CSCF impact

LM Ericsson

24.229

Agreed

Revision of C1-080613

Revision of C1-080324

The only change is to put the first "d" into the word wildcarded in section 5.4.3.6.1









C1-080571

P-CSCF awareness for 3GPP accesses

Telecom Italia

24.229

Revised to C1-080658

Revision of C1-080632

Revision of C1-080605

Revision of C1-080202










C1-080649

Procedures at IBCF and P-CSCF for the optional support of ISUP encapsulation within IMS

Nortel

24.229

Postponed

Revision of C1-080610

Revision of C1-080244








C1-080658

P-CSCF awareness for 3GPP accesses

Telecom Italia

24.229

Agreed

Revision of C1-080571

Revision of C1-080632

Revision of C1-080605

Revision of C1-080202

Correction of styles are needed.
























9.12

Work Item:

Overlap-C1

Tuesday














CT1 aspects of overlap signalling.
































































9.13
















This agenda item is for TISPAN R1 and R2 maintenance and 3GPP re-documentation of this.



9.13.1

Work Item:

MAINT_R1


Monday













TISPAN R1 maintenance.

For correction is in this agenda item, please group also possible related mirror CRs here.










C1-080220

Maintenance of TISPAN release 1 common IMS

Alcatel-Lucent / Keith Drage

WID

Revised to C1-080428







C1-080221

Addition of H248 deliverables to Maintenance of TISPAN release 1 common IMS

Alcatel-Lucent / Keith Drage

WID

Noted

New content is targeted for C1-080428









C1-080106

TS 24.405 v1.1.4 (Transfer of ETSI ts 183 005 v1.1.3, CONF)

MCC

3GPP TS

Agreed

Rel-7 (To be frozen after TSG approval)

To be sent for approval as part of rel-7 (Tisp R1)








C1-080107

TS 24.406 v1.2.2 (Transfer of ETSI TS 183 006 v1.2.1, MWI)

MCC

3GPP TS

Agreed

Rel-7 (To be frozen after TSG approval)

To be sent for approval as part of rel-7 (Tisp R1) and rel-8 (tisp R2)








C1-080108

TS 24.407 v1.3.1 (Transfer of ETSI TS 183 007 v1.3.0; OIP/OIR)

MCC

3GPP TS

Agreed

Rel-7 (To be frozen after TSG approval)

To be sent for approval as part of rel-7 (Tisp R1) and rel-8 (tisp R2)








C1-080109

TS 24.410 v1.2.3 (Transfer of ETSI TS 183 010 v1.2.2; HOLD)

MCC

3GPP TS

Agreed

Rel-7 (To be frozen after TSG approval)

To be sent for approval as part of rel-7 (Tisp R1) and rel-8 (tisp R2)








C1-080110

TS 24.416 v1.2.2 (Transfer of ETSI TS183 016 v1.2.1; MCID)

MCC

3GPP TS

Agreed

Rel-7 (To be frozen after TSG approval)

To be sent for approval as part of rel-7 (Tisp R1)








C1-080113

TS 24.429 v1.3.3 (Transfer of ETSI TS 183 029 v 1.3.2; ECT)

MCC

3GPP TS

Agreed

Rel-7 (To be frozen after TSG approval.)

To be sent for approval as part of rel-7 (Tisp R1)








C1-080114

TS 24.441 v1.1.2 (Transfer of ETSI TS 183 041 v1.1.1; endorse 24.247)

MCC

3GPP TS

Agreed

Rel-7 (To be frozen after TSG approval.)

To be sent for approval as part of rel-7 (Tisp R1) and rel-8 (tisp R2)








C1-080120

TS 24.403 v1.8.1 (Transfer of ETSI ES 283 003 v1.8.0; endorse 24.229)

MCC

3GPP TS

Agreed

Rel-7 (To be frozen after TSG approval)

To be sent for approval as part of rel-7 (Tisp R1)








C1-080121

TS 24.430 v1.1.2 (transfer of ETSI ES 283 030 v1.1.1; endorse 24.141)

MCC

3GPP TS

Agreed

Rel-7 (To be frozen after TSG approval)

To be sent for approval as part of rel-7 (Tisp R1) and rel-8 (tisp R2)








C1-080355

TS 24.404 v1.5.1 (Transfer of ETSITS 183 004 v1.5.0, CDIV)

MCC

3GPP TS

Agreed

Rel-7 (To be frozen after TSG approval)

To be sent for approval as part of rel-7 (Tisp R1)








C1-080358

TS 24.408 v 1.5.1(Transfer of ETSI TS 183 008, TIP/TIR)

MCC

3GPP TS

Agreed

Rel-7 (To be frozen after TSG approval)

To be sent for approval as part of rel-7 (Tisp R1)








C1-080361

TS 24.423 v 1.4.1 (Transfer of ETSI TS 183 023 v1.4.0, XCAP)

MCC

3GPP TS

Agreed

Rel-7 (To be frozen after TSG approval)

To be sent for approval as part of rel-7 (Tisp R1) and rel-8 (tisp R2)








C1-080321

Addition of 3GPP supplementary service specification

LM Ericsson

24.173

Agreed

3 TSs are still not available from TISPAN, These TSs need to be available to be able to proceed with the CR









C1-080428

Maintenance of TISPAN release 1 common IMS

Alcatel-Lucent / Keith Drage

WID

Agreed

Revision of C1-080220

Keith Drage to be added as rapporteur of all the new TSs for TISPAN R1








C1-080446

TS 24.411 v 1.3.1 (Transfer of ETSI TS 183 011 v1.3.0; ACR/CB)

MCC

3GPP TS

Agreed

Rel-7 (To be frozen after TSG approval)

To be sent for approval as part of rel-7 (Tisp R1) and rel-8 (tisp R2)








C1-080542

TS 24.428 v1.6.1 (Transfer of ETSI TS 183 028 v1.6.0; basic comm)

MCC

3GPP TS

Agreed

Rel-7 (To be frozen after TSG approval)

To be sent for approval as part of rel-7 (Tisp R1) and rel-8 (tisp R2)























9.13.2

Work Item:

MAINT_R2


Monday













TISPAN R2 maintenance.

For correction is in this agenda item, please group also possible related mirror CRs here.










C1-080222

Maintenance of TISPAN release 2 common IMS

Alcatel-Lucent / Keith Drage

WID

Revised to C1-080429







C1-080223

Addition of H248 deliverables to Maintenance of TISPAN release 2 common IMS

Alcatel-Lucent / Keith Drage

WID

Noted

New content is targeted for C1-080429









C1-080111

TS 24.516 v2.5.1 (Transfer of ETSI TS183 016 v2.5.0; MCID)

MCC

3GPP TS

Agreed

Rel-8 ( To be frozen after TSG approval)

To be sent for approval as part of rel-8 (tisp R2)








C1-080115

TS 24.447 v2.1.2 (Transfer of ETSI TS183 047 v 2.1.1; AOC)

MCC

3GPP TS

Agreed

Rel-8 (To be frozen after TSG approval.)

To be sent for approval as part of rel-8 (tisp R2)








C1-080117

TS 24.451 v2.1.1 (Transfer of ETSI TS 183 051 v 2.1.0; endorse 24.341)

MCC

3GPP TS

Agreed

Rel-8 (To be frozen after TSG approval.)

To be sent for approval as part of rel-8 (tisp R2)








C1-080118

TS 24.454 v 2.1.1 (Transfer of ETSI TS 183 054 v2.1.0; CUG)

MCC

3GPP TS

Agreed

Rel-8 (To be frozen after TSG approval.)

To be sent for approval as part of rel-8 (tisp R2)








C1-080356

TS 24.504 v2.4.1 (Transfer of ETSITS 183 004 v2.3.0, CDIV)

MCC

3GPP TS

Agreed

Rel-8 (To be frozen after TSG approval.)

To be sent for approval as part of rel-8 (tisp R2)








C1-080359

TS 24.508 v 2.7.1 (Transfer of ETSI TS 183 008 v2.7.0, TIP/TIR)

MCC

3GPP TS

Agreed

Rel-8 (To be frozen after TSG approval.)

To be sent for approval as part of rel-8 (tisp R2)








C1-080363

TS 24.503 v 2.5.2 (Transfer of ETSI TS283 003 v2.5.1, endorse 24.229)

MCC

3GPP TS

Agreed

Rel-8 (To be frozen after TSG approval.)

To be sent for approval as part of rel-8 (tisp R2)








C1-080429

Maintenance of TISPAN release 2 common IMS

Alcatel-Lucent / Keith Drage

WID

Agreed

Revision of C1-080222

Keith Drage to be added as rapporteur of all the new TSs for TISPAN R2








C1-080447

TS 24.529 v 2.5.1 (Transfer of ETSI TS 183 029 v2.5.0, ECT)

MCC

3GPP TS

Agreed

Rel-8 (To be frozen after TSG approval.)

To be sent for approval as part of rel-8 (tisp R2)








C1-080543

TS 24.528 v2.4.1 (Transfer of ETSI TS 183 028 v2.4.0; basic comm)

MCC

3GPP TS

Agreed

Rel-8 (To be frozen after TSG approval.)

To be sent for approval as part of rel-8 (tisp R2)








C1-080544

TS 24.505 v2.5.1 (Transfer of ETSI TS 183 005 v2.5.0; CONF)

MCC

3GPP TS

Agreed

Rel-8 (To be frozen after TSG approval.)

To be sent for approval as part of rel-8 (tisp R2)























9.13.3

Work Item:

REDOC_TIS-C1

Monday














This agenda item is for TISPAN re-documentation within 3GPP.








C1-080224

Documentation of TISPAN NGN R1 and R2 in 3GPP TSG CT

Alcatel-Lucent / Keith Drage

WID

Revised to C1-080431







C1-080225

Addition of H248 deliverables to Documentation of TISPAN NGN R1 and R2 in 3GPP TSG CT

Alcatel-Lucent / Keith Drage

WID

Noted

New content is targeted for C1-080431









C1-080112

TS 24.616 v2.5.2 (Transfer of ETSI TS183 016 v2.5.0; MCID)

MCC

3GPP TS

Agreed

Rel-8 (After TSG approval, TS 24.616 is not meant to be frozen.)

The TS is sent for information to CT#39.








C1-080116

TS 24.647 v2.1.3 (Transfer of ETSI TS183 047 v 2.1.1; AOC)

MCC

3GPP TS

Agreed

Rel-8 (After TSG approval, TS 24.647 is not meant to be frozen.)

The TS is sent for information to CT#39.








C1-080119

TS 24.654 v 2.1.2 (Transfer of ETSI TS 183 054 v2.1.0; CUG)

MCC

3GPP TS

Agreed

Rel-8 (After TSG approval TS 24.654 is not meant to be frozen.)

The TS is sent for information to CT#39.








C1-080357

TS 24.604 v2.4.2(Transfer of ETSITS 183 004 v2.3.0, CDIV)

MCC

3GPP TS

Agreed

Rel-8 (After TSG approval TS 24.604 is not meant to be frozen.)

The TS is sent for information to CT#39.








C1-080360

TS 24.608 v 2.7.2 (Transfer of ETSI TS 183 008 v2.7.0, TIP/TIR)

MCC

3GPP TS

Agreed

Rel-8 (After TSG approval TS 24.608 is not meant to be frozen.)

The TS is sent for information to CT#39.








C1-080362

TS 24.623 v 1.4.2 (Transfer of ETSI TS 183 023 v1.4.0, XCAP)

MCC

3GPP TS

Agreed

Rel-8 (After TSG approval TS 24.623 is not meant to be frozen.)

The TS is sent for information to CT#39.








C1-080364

TS 24.606 v1.2.3 (Transfer of ETSI TS 183 006 v1.2.1, MWI)

MCC

3GPP TS

Agreed

Rel-8 (After TSG approval TS 24.606 is not meant to be frozen.)

The TS is sent for information to CT#39.








C1-080365

TS 24.607 v1.3.2 (Transfer of ETSI TS 183 007 v1.3.0; OIP/OIR)

MCC

3GPP TS

Agreed

Rel-8 (After TSG approval TS 24.607 is not meant to be frozen.)

The TS is sent for information to CT#39.








C1-080366

TS 24.610 v1.2.4 (Transfer of ETSI TS 183 010 v1.2.2; HOLD)

MCC

3GPP TS

Agreed

Rel-8 (After TSG approval TS 24.610 is not meant to be frozen.)



The TS is sent for information to CT#39.







C1-080093

CR against 24.647 AOC Modify Scope

Nokia Siemens Networks

24.647

Agreed







C1-080094

CR against 24.654 CUG Modify Scope

Nokia Siemens Neworks

24.654

Agreed







C1-080095

CR against 24.616 MCID Modify Scope

Nokia Siemens Networks

24.616

Agreed







C1-080096

CR against 24.604 CDIV Modify Scope

Nokia Siemens Networks

24.604

Agreed







C1-080097

CR against 24.605 CONF Modify Scope

Nokia Siemens Networks

24.605

Agreed







C1-080098

CR against 24.606 MWI Modify Scope

Nokia Siemens Networks

24.606

Agreed







C1-080099

CR against 24.607 OIP/OIR Modify Scope

Nokia Siemens Networks

24.607

Agreed







C1-080100

CR against 24.608 TIP/TIR Modify Scope

Nokia Siemens Networks

24.608

Agreed







C1-080101

CR against 24.610 HOLD Modify Scope

Nokia Siemens Networks

24.610

Agreed







C1-080102

CR against 24.611 ACR/CB Modify Scope

Nokia Siemens Networks

24.611

Agreed







C1-080103

CR against 24.628 Basic Comm Modify Scope

Nokia Siemens Networks

24.628

Agreed







C1-080104

CR against 24.629 ECT Modify Scope

Nokia Siemens Networks

24.629

Agreed







C1-080122

SIP XML addition for support of transit specific content

Deutsche Telekom, T-Mobile

24.229

Revised to C1-080533

It was agreed that the xml schema should be specified in CT3 (29.163).

The CR is dependant on a CR to CT3








C1-080304

Insertion of SDP in INVITE by UE for conversationnal services

France Telecom

24.628

Postponed







C1-080322

Addition of 3GPP supplementary service specification

LM Ericsson

24.173

Revised to C1-080432

The references to TISPAN TSs may be replaced by references to 3GPP TSs. To be added to the cover sheet of all TSs to be sent for information.









C1-080431

Documentation of TISPAN NGN R1 and R2 in 3GPP TSG CT

Alcatel-Lucent / Keith Drage

WID

Agreed

Revision of C1-080224









C1-080432

Addition of 3GPP supplementary service specification

LM Ericsson

24.173

Agreed

Revision of C1-080322

The references to TISPAN TSs may be replaced by references to 3GPP TSs. To be added to the cover sheet of all TSs to be sent for information.

In clause 6.2, OIR changed to OIP.









C1-080448

TS 24.611 v 1.3.2 (Transfer of ETSI TS 183 011 v1.3.0; ACR/CB)

MCC

3GPP TS

Agreed

Rel-8 (After TSG approval TS 24.611 is not meant to be frozen.)

The TS is sent for information to CT#39.








C1-080449

TS 24.629 v 2.5.2 (Transfer of ETSI TS 183 029 v2.5.0, ECT)

MCC

3GPP TS

Agreed

Rel-8 (After TSG approval TS 24.629 is not meant to be frozen.)

The TS is sent for information to CT#39.








C1-080533

SIP XML addition for support of transit specific content

Deutsche Telekom, T-Mobile

24.229

Agreed

Revision of C1-080122

It was agreed that the xml schema should be specified in CT3 (29.163).

The CR is dependant on a CR to CT3









C1-080545

TS 24.605 v2.5.2Transfer of ETSI TS 183 005 v2.5.0; CONF)

MCC

3GPP TS

Agreed

Rel-8 (After TSG approval TS 24.605 is not meant to be frozen.)

The TS is sent for information to CT#39.








C1-080546

TS 24.628 v2.4.2 (Transfer of ETSI TS 183 028 v2.4.0; basic comm)

MCC

3GPP TS

Agreed

Rel-8 (After TSG approval TS 24.628 is not meant to be frozen.)

The TS is sent for information to CT#39.























9.14

Work Item:

NBA


Tuesday













NASS Bundled Authentication.








C1-080226

Inclusion of NASS bundled authentication

Alcatel-Lucent / Keith Drage

24.229

Revised to C1-080518








C1-080518

Inclusion of NASS bundled authentication

Alcatel-Lucent / Keith Drage

24.229

Agreed

Revision of C1-080226

























9.15

Work Item:

PPACR-C1


Thursday













Paging Permission with Access Control.








C1-080318

Solution selection for Paging Permission (PPACR) with Access control

NTT DoCoMo




Noted

Related outgoing LS in C1-080537

Discussion

Moved to correct agenda item

The current service requirements are for GERAN & UTRAN.

Decoupling of the solutions for GERAN & UTRAN accesses is a possibility.

RAN2 is working on a concept for this in EUTRAN.

CT1 would like to follow the proposed recommendations.


































































9.16
















IMS supplementary services.


9.16.1

Work Item:

CCBS-NR-C1


Thursday













Call Completion on Busy Subscriber (CCBS) / Call Completion on Non-Reachable (CCNR) in IMS.








C1-080227

NGN IMS Supplementary Services; Call Completion on Busy Subscriber (CCBS), Call Completion No Reply (CCNR)

Alcatel-Lucent / Keith Drage

WID

Revised to C1-080477







C1-080257

CCBS_NR-C1_initial_draft

Deutsche Telekom




Revised to C1-080478







C1-080258

CCBS_NR-C1_proposal_for_41_introduction

Deutsche Telekom

24.6xy

Withdrawn

The content to be merged in to clause 1 (scope) of C1-080478









C1-080259

CCBS_NR-C1_proposal_for_42_description

Deutsche Telekom

24.6xy

Agreed







C1-080260

CCBS_NR-C1_proposal_for_43_operational_requirements

Deutsche Telekom

24.6xy

Agreed







C1-080261

CCBS_NR-C1_proposal_for_44_coding_requirements

Deutsche Telekom

24.6xy

Revised to C1-080480







C1-080262

CCBS_NR-C1_proposal_for_45_signalling_requirements

Deutsche Telekom

24.6xy

Revised to C1-080481







C1-080263

CCBS_NR-C1_proposal_for_46_CCBS_service_interaction

Deutsche Telekom

24.6xy

Revised to C1-080482







C1-080264

CCBS_NR-C1_proposal_for_48_interworking

Deutsche Telekom

24.6xy

Revised to C1-080483

Questioned how the interworking with “PSTN/ISDN Emulation” could be handled as this has not been transferred to Common IMS.









C1-080265

CCBS_NR-C1_proposal_for_49_timer_values

Deutsche Telekom

24.6xy

Agreed







C1-080266

CCBS_NR-C1_proposal_for_A_signalling_flows

Deutsche Telekom

24.6xy

Revised to C1-080479

Apply the structure from existing CT1 specifications wrt informative example flows.









C1-080267

CCBS_NR-C1_proposal_for_B_filter_criteria

Deutsche Telekom

24.6xy

Revised to C1-080484







C1-080477

NGN IMS Supplementary Services; Call Completion on Busy Subscriber (CCBS), Call Completion No Reply (CCNR)

Alcatel-Lucent / Keith Drage

WID

Agreed

Revision of C1-080227









C1-080478

CCBS_NR-C1_initial_draft

Deutsche Telekom




Agreed

Revision of C1-080257









C1-080479

CCBS_NR-C1_proposal_for_A_signalling_flows

Deutsche Telekom

24.6xy

Agreed

Revision of C1-080266

Apply the structure from existing CT1 specifications wrt informative example flows.








C1-080480

CCBS_NR-C1_proposal_for_44_coding_requirements

Deutsche Telekom

24.6xy

Agreed

Revision of C1-080261









C1-080481

CCBS_NR-C1_proposal_for_45_signalling_requirements

Deutsche Telekom

24.6xy

Agreed

Revision of C1-080262









C1-080482

CCBS_NR-C1_proposal_for_46_CCBS_service_interaction

Deutsche Telekom

24.6xy

Agreed

Revision of C1-080263









C1-080483

CCBS_NR-C1_proposal_for_48_interworking

Deutsche Telekom

24.6xy

Agreed

Revision of C1-080264









C1-080484

CCBS_NR-C1_proposal_for_B_filter_criteria

Deutsche Telekom

24.6xy

Agreed

Revision of C1-080267
























9.16.2

Work Item:

CW-C1


Thursday













Communication Waiting in IMS.








C1-080228

Definition of Communication Wait Service

Alcatel-Lucent / Keith Drage

WID

Revised to C1-080485







C1-080268

CW-C1_initial_draft

Deutsche Telekom

24.6xy

Revised to C1-080486







C1-080269

CW-C1_proposal_for_41_introduction

Deutsche Telekom

24.6xy

Withdrawn

The content to be merged in to clause 1 (scope) of C1-080486









C1-080270

CW-C1_proposal_for_42_description

Deutsche Telekom

24.6xy

Revised to C1-080487







C1-080271

CW-C1_proposal_for_43_operational_requirements

Deutsche Telekom

24.6xy

Agreed







C1-080272

CW-C1_proposal_for_45_signalling_requirements

Deutsche Telekom

24.6xy

Revised to C1-080488







C1-080273

CW-C1_proposal_for_46_service_interaction

Deutsche Telekom

24.6xy

Agreed







C1-080274

CW-C1_proposal_for_47_interworking

Deutsche Telekom

24.6xy

Revised to C1-080489







C1-080275

CW-C1_proposal_for_49_service_configuration

Deutsche Telekom

24.6xy

Revised to C1-080490







C1-080276

CW-C1_proposal_for_B_filter_criteria

Deutsche Telekom

24.6xy

Revised to C1-080491







C1-080329

CW-C1_discussion

Deutsche Telekom

Discussion

Noted

Concerns if P-CSCFs are service-aware.









C1-080485

Definition of Communication Wait Service

Alcatel-Lucent / Keith Drage

WID

Agreed

Revision of C1-080228









C1-080486

CW-C1_initial_draft

Deutsche Telekom

24.6xy

Agreed

Revision of C1-080268









C1-080487

CW-C1_proposal_for_42_description

Deutsche Telekom

24.6xy

Agreed

Revision of C1-080270









C1-080488

CW-C1_proposal_for_45_signalling_requirements

Deutsche Telekom

24.6xy

Agreed

Revision of C1-080272









C1-080489

CW-C1_proposal_for_47_interworking

Deutsche Telekom

24.6xy

Agreed

Revision of C1-080274









C1-080490

CW-C1_proposal_for_49_service_configuration

Deutsche Telekom

24.6xy

Agreed

Revision of C1-080275









C1-080491

CW-C1_proposal_for_B_filter_criteria

Deutsche Telekom

24.6xy

Agreed

Revision of C1-080276
























9.17

Work Item:

OAM8-Trace

Thursday














Service level tracing in IMS.







C1-080325

Protocol Impact of IMS Debugging/Trace

Vodafone




Noted

Discussion



The proposed solution was discussed and the need for further discussion was seen. Vodafone (Peter) took the action item to organize a conference call on this issue. The conference call will be announced on the CT1 mailing list.







C1-080326

Impact of Debugging on the IP Multimedia Call Model

Vodafone

23.218

Revised to C1-080614

OAM7-Trace

WI incorrect, shall be OAM8-Trace








C1-080327

Debugging of SIP signalling

Vodafone

24.229

Revised to C1-080615

OAM7-Trace

WI incorrect, shall be OAM8-Trace








C1-080328

Debugging configuration in the IMS managed object

Vodafone

24.167

Revised to C1-080616

OAM7-Trace

WI incorrect, shall be OAM8-Trace








C1-080614

Impact of Debugging on the IP Multimedia Call Model

Vodafone

23.218

Postponed

Revision of C1-080326

OAM7-Trace

WI incorrect, shall be OAM8-Trace









C1-080615

Debugging of SIP signalling

Vodafone

24.229

Postponed

Revision of C1-080327

OAM7-Trace

WI incorrect, shall be OAM8-Trace









C1-080616

Debugging configuration in the IMS managed object

Vodafone

24.167

Postponed

Revision of C1-080328

OAM7-Trace

WI incorrect, shall be OAM8-Trace













































9.18

Work Item:

REDOC_3GPP2, IMSCAT, IMSFA

Monday














3GPP2 alignments.
This agenda item is intended to cover issues that are for 3GPP – 3GPP2 alignment due to Common IMS.

WIs, discussion documents and CRs. Note that stage 3 CRs on new functionality needs to be conditionally agreed on the condition that stage 1 and stage 2 CRs will be approved at the March plenary. Due to this, such CRs needs to have the CR-numbers of the relevant stage 1 and stage 2 TSs indicated on the cover page










C1-080387

3GPP2 Input to Common IMS

3GPP2

WID

Revised to C1-080408







C1-080388

IMS CAT

Nortel

WID

Revised to C1-080409







C1-080389

Flexible Alerting

Nortel

WID

Revised to C1-080410







C1-080002

Derivation of temporary ID

Alcatel-Lucent/Milo Orsic

24.229

Withdrawn

Postponed in the Common IMS WS as the paper was more targeted towards TS 23.003









C1-080003

IP-CAN procedure for cdma2000

Alcatel-Lucent/Milo Orsic

24.229

Revised to C1-080372







C1-080004

Dual IP-stack UE

Alcatel-Lucent/ Milo Orsic

24.229

Revised to C1-080373







C1-080005

Access-network-charging-info for cdma2000 access

Alcatel-Lucent/ Milo Orsic

24.229

Revised to C1-080374







C1-080006

P-CSCF interface to IP-CAN

Alcatel-Lucent/ Milo Orsic

24.229

Revised to C1-080375







C1-080007

R-UIM

Alcatel-Lucent/ Milo Orsic

24.229

Revised to C1-080376







C1-080048

Addition of other access network types.

LM Ericsson

23.218

Revised to C1-080377







C1-080164

Alternative call flows when both UEs need to reserve resources

Qualcomm Europe/Roozbeh

24.930

Withdrawn

Postponed in the Common IMS WS as this example flow that was discussed several times in CT1 contained no new normative requirements









C1-080165

Alternate call flow when originating UE needs to reserve resources

Qualcomm Europe/Roozbeh

24.930

Revised to C1-080378







C1-080166

Alerting called user

Qualcomm Europe/Roozbeh

24.930

Withdrawn

Postponed in the Common IMS WS as this example flow that was discussed several times in CT1 contained no new normative requirements









C1-080167

Messaging references

Qualcomm Europe/Roozbeh

24.247

Revised to C1-080379







C1-080168

Security mechanisms for presence

Qualcomm Europe/Roozbeh

24.141

Revised to C1-080380







C1-080169

Network presence

Qualcomm Europe/Roozbeh

24.141

Revised to C1-080381







C1-080170

Timestamp in Register request

Qualcomm Europe/Roozbeh




Noted

Discussion









C1-080171

Add Timestamp in Register Request

Qualcomm Europe/Roozbeh

24.229

Revised to C1-080382







C1-080372

IP-CAN procedure for cdma2000

Alcatel-Lucent/Milo Orsic

24.229

Revised to C1-080411

Revision of C1-080003

Endorsed by the WS

CIMS-080004

WI to be added by MCC later.








C1-080373

Dual IP-stack UE

Alcatel-Lucent/ Milo Orsic

24.229

Postponed

Outgoing LS in C1-080417

Revision of C1-080004

CIMS-080005

The rationale for this CR was not clear, and it was commented in the WS that SA1 and SA2 should be asked for advice on this.

Commented that simultaneous use of IPv4 and IPv6 address seems to be prohibited by SA2.

Related CR in Tdoc C1-080200








C1-080374

Access-network-charging-info for cdma2000 access

Alcatel-Lucent/ Milo Orsic

24.229

Revised to C1-080412

Revision of C1-080005

Endorsed by the WS

CIMS-080006

Some editorial corrections needed.

WI to be added by MCC later.









C1-080375

P-CSCF interface to IP-CAN

Alcatel-Lucent/ Milo Orsic

24.229

Revised to C1-080413

Revision of C1-080006

Endorsed by the WS

CIMS-080007

The correct reference version must be used.

WI to be added by MCC later.









C1-080376

R-UIM

Alcatel-Lucent/ Milo Orsic

24.229

Revised to C1-080414

Revision of C1-080007

Endorsed by the WS

CIMS-080008

The correct reference version must be used.

WI to be added by MCC later.









C1-080377

Addition of other access network types.

LM Ericsson

23.218

Revised to C1-080415

Revision of C1-080048

Endorsed by the WS

CIMS-080062

IMSProtoc2 is incorrect WI

The CR cover sheet must be corrected.

WI to be added by MCC later.








C1-080378

Alternate call flow when originating UE needs to reserve resources

Qualcomm Europe/Roozbeh

24.930

Revised to C1-080416

Revision of C1-080165

Endorsed by the WS

CIMS-080063

This CR was seen as useful to add to the TR and thereby lifting the TR to rel-8.

WI to be added by MCC later.









C1-080379

Messaging references

Qualcomm Europe/Roozbeh

24.247

Agreed

Revision of C1-080167

Endorsed by the WS

CIMS-080046

WI to be added by MCC later. The MCC was requested to correct the revision of the CR from 0 to 1.








C1-080380

Security mechanisms for presence

Qualcomm Europe/Roozbeh

24.141

Revised to C1-080422

Revision of C1-080168

Endorsed by the WS

CIMS-080069

WI to be added by MCC later.

The originator was requested to provide the CR-number of TS 33.141.

MCC was requested to update the cover sheet with the CR-number

The CR must be conditionally approved on the condition that the SA3-CR is approved aswell.

Is this really an issue that can be determined by the access?








C1-080381

Network presence

Qualcomm Europe/Roozbeh

24.141

Revised to C1-080423

Revision of C1-080169

Endorsed by the WS

CIMS-080070

WI to be added by MCC later.

This is not dependant on the access.









C1-080382

Add Timestamp in Register Request

Qualcomm Europe/Roozbeh

24.229

Postponed

Revision of C1-080171

Endorsed by the WS

CIMS-080071

WI to be added by MCC later.

There was no conclusion and agreement on this proposal at present.









C1-080383

Alternative Signalling Flow for CONF Service

Nortel Networks, Alcatel-Lucent, Tatara Systems, Qualcomm Europe, US Cellular, Motorola, SPRINT

 

Revised to C1-080424

Endorsed by the WS

This CR has to be revised to be based on the latest draft TS 24.605

CIMS-080013









C1-080384

Adding Third Party Call Control AS Functionality to ECT Service

Nortel Networks, Alcatel-Lucent, Qualcomm Europe, US Cellular, Tatara Systems, Motorola, SPRINT

 

Revised to C1-080425

Endorsed by the WS

This CR has to be revised to be based on the latest draft TS 24.629

CIMS-080017









C1-080385

Adding Third Party Call Control AS Functionality to CONF Service

Nortel Networks, Alcatel-Lucent, Qualcomm Europe, US Cellular, Tatara Systems, Motorola, SPRINT

 

Revised to C1-080426

Endorsed by the WS

This CR has to be revised to be based on the latest draft TS 24.605

CIMS-080018









C1-080386

Conclusions from 3GPP/3GPP2 Common IMS Workshop

Chairs of Common IMS workshop

Report

Noted








C1-080391

IMS Flexible Alerting Supplementary Service

Nortel Networks, Ericsson, Alcatel-Lucent, Qualcomm Europe, Tatara Systems, US Cellular, Motorola, SPRINT

TS

Revised to C1-080427

TS skeleton









C1-080408

3GPP2 Input to Common IMS

3GPP2

WID

Revised to C1-080549

Revision of C1-080387









C1-080409

IMS CAT

Nortel

WID

Agreed

Revision of C1-080388









C1-080410

Flexible Alerting

Nortel

WID

Revised to C1-080663

Revision of C1-080389

Proposed to make this to a WT and not a BB.

The objective of this task is redocumentation, but some changes to adopt this to common IMS is needed.









C1-080411

IP-CAN procedure for cdma2000

Alcatel-Lucent/Milo Orsic

24.229

Agreed

Revision of C1-080372

Revision of C1-080003

Endorsed by the WS

CIMS-080004

WI to be added by MCC later.









C1-080412

Access-network-charging-info for cdma2000 access

Alcatel-Lucent/ Milo Orsic

24.229

Agreed

Revision of C1-080374

Revision of C1-080005

Endorsed by the WS

CIMS-080006

Some editorial corrections needed.

WI to be added by MCC later.








C1-080413

P-CSCF interface to IP-CAN

Alcatel-Lucent/ Milo Orsic

24.229

Agreed

Revision of C1-080375

Revision of C1-080006

Endorsed by the WS

CIMS-080007

The correct reference version must be used.

WI to be added by MCC later.








C1-080414

R-UIM

Alcatel-Lucent/ Milo Orsic

24.229

Agreed

Revision of C1-080376

Revision of C1-080007

Endorsed by the WS

CIMS-080008

The correct reference version must be used.

WI to be added by MCC later.








C1-080415

Addition of other access network types.

LM Ericsson

23.218

Agreed

Revision of C1-080377

Revision of C1-080048

Endorsed by the WS

CIMS-080062

IMSProtoc2 is incorrect WI

The CR cover sheet must be corrected.

WI to be added by MCC later.









C1-080416

Alternate call flow when originating UE needs to reserve resources

Qualcomm Europe/Roozbeh

24.930

Agreed

Revision of C1-080378

Revision of C1-080165

Endorsed by the WS

CIMS-080063

This CR was seen as useful to add to the TR and thereby lifting the TR to rel-8.

WI to be added by MCC later.








C1-080422

Security mechanisms for presence

Qualcomm Europe/Roozbeh

24.141

Revised to C1-080661

Revision of C1-080380

Revision of C1-080168

Endorsed by the WS

CIMS-080069

WI to be added by MCC later.

The originator was requested to provide the CR-number of TS 33.141.

MCC was requested to update the cover sheet with the CR-number

The CR must be conditionally approved on the condition that the SA3-CR is approved aswell.

Is this really an issue that can be determined by the access?









C1-080423

Network presence

Qualcomm Europe/Roozbeh

24.141

Revised to C1-080664

Revision of C1-080381

Revision of C1-080169

Endorsed by the WS

CIMS-080070

WI to be added by MCC later.

This is not dependant on the access.

The CR-number is to be added when available.

The CR is conditionally approved on the condition that the stage 2 CR is approved.








C1-080424

Alternative Signalling Flow for CONF Service

Nortel Networks, Alcatel-Lucent, Tatara Systems, Qualcomm Europe, US Cellular, Motorola, SPRINT

 

Agreed

Revision of C1-080383

Endorsed by the WS

This CR has to be revised to be based on the latest draft TS 24.605

CIMS-080013








C1-080425

Adding Third Party Call Control AS Functionality to ECT Service

Nortel Networks, Alcatel-Lucent, Qualcomm Europe, US Cellular, Tatara Systems, Motorola, SPRINT

 

Revised to C1-080665

Revision of C1-080384

Endorsed by the WS

This CR has to be revised to be based on the latest draft TS 24.629

CIMS-080017








C1-080426

Adding Third Party Call Control AS Functionality to CONF Service

Nortel Networks, Alcatel-Lucent, Qualcomm Europe, US Cellular, Tatara Systems, Motorola, SPRINT

 

Agreed

Revision of C1-080385

Endorsed by the WS

This CR has to be revised to be based on the latest draft TS 24.605

CIMS-080018








C1-080427

IMS Flexible Alerting Supplementary Service

Nortel Networks, Ericsson, Alcatel-Lucent, Qualcomm Europe, Tatara Systems, US Cellular, Motorola, SPRINT

TS

Agreed

Revision of C1-080391

TS skeleton








C1-080549

3GPP2 Input to Common IMS

3GPP2

WID

Agreed

Revision of C1-080408

Revision of C1-080387








C1-080663

Flexible Alerting

Nortel

WID

Agreed

Revision of C1-080410

Revision of C1-080389

Proposed to make this to a WT and not a BB.

The objective of this task is redocumentation, but some changes to adopt this to common IMS is needed.








C1-080661

Security mechanisms for presence

Qualcomm Europe/Roozbeh

24.141

Revised to C1-080666

Revision of C1-080422

Revision of C1-080380

Revision of C1-080168

Endorsed by the WS

CIMS-080069

WI to be added by MCC later.

The originator was requested to provide the CR-number of TS 33.141.

MCC was requested to update the cover sheet with the CR-number

The CR must be conditionally approved on the condition that the SA3-CR is approved aswell.

Is this really an issue that can be determined by the access?








C1-080664

Network presence

Qualcomm Europe/Roozbeh

24.141

Agreed

Revision of C1-080423

Revision of C1-080381

Revision of C1-080169

Endorsed by the WS

CIMS-080070

WI to be added by MCC later.

This is not dependant on the access.

The CR-number is to be added when available.

The CR is conditionally approved on the condition that the stage 2 CR is approved.

All affected subclauses to be added.








C1-080665

Adding Third Party Call Control AS Functionality to ECT Service

Nortel Networks, Alcatel-Lucent, Qualcomm Europe, US Cellular, Tatara Systems, Motorola, SPRINT

 

Agreed

Revision of C1-080425

Revision of C1-080384

Endorsed by the WS

This CR has to be revised to be based on the latest draft TS 24.629

CIMS-080017









C1-080666

Security mechanisms for presence

Qualcomm Europe/Roozbeh

24.141

Agreed

Revision of C1-080661

Revision of C1-080422

Revision of C1-080380

Revision of C1-080168

Endorsed by the WS

CIMS-080069

WI to be added by MCC later.

The originator was requested to provide the CR-number of TS 33.141.

MCC was requested to update the cover sheet with the CR-number

The CR must be conditionally approved on the condition that the SA3-CR is approved aswell.

Is this really an issue that can be determined by the access?
























9.19
















This agenda item is for other Rel-8 topics not covered by the agenda items above.
Whether documents in this agenda item are treated in a joint session or not depends on the papers.


9.19.1

All other IMS-related WIs

Thursday














This agenda item is for other IMS related Rel-8 topics not covered by the agenda items above.








C1-080058

Issues to be studied by CT1 in the 3GPP TR 23.820 on IMS Restoration Procedures

LM Ericsson




Noted

Discussion

The related notes were taken by CT4 delegates presenting the discussion document and will be given as input to CT4.








C1-080059

Presentation of 3GPP TR 23.820 on IMS Restoration Procedures

LM Ericsson




Noted

Discussion









C1-080173

WID for Support of Service-Level Interworking for Messaging Services Stage 3

Huawei, Ericsson

WID

Revised to C1-080475

Questioned whether the impact was within the scope of 24.341, or whether the functionality was appropriate to place in a separate specification.









C1-080174

Skeleton for Support of Service-Level Interworking for Messaging Services Stage 3

Huawei

24.341










C1-080229

Business communications: Current ETSI TISPAN documentation

Alcatel-Lucent / Keith Drage

INFO

Noted







C1-080230

Business communication and IMS: an overview

Alcatel-Lucent / Keith Drage

INFO

Noted







C1-080231

Business communications: Current SIP protocol related issues

Alcatel-Lucent / Keith Drage

INFO

Noted

Work is ongoing in SA-groups on the SA-aspects.









C1-080232

Proposed new work item: IMS System enhancements for corporate network access

Alcatel-Lucent / Keith Drage

WID

Revised to C1-080534







C1-080302

Delivering Request-URI to UE managing several terminals

France Telecom




Noted

Discussion

Moved from Agenda Item 8.5 to Agenda Item 9.19.1 (Discussion Paper already presented)








C1-080303

Delivering Rrequest-URI to UE

France Telecom

24.229

Postponed

Moved from Agenda Item 8.5 to Agenda Item 9.19.1 (Discussion Paper already presented)









C1-080475

WID for Support of Service-Level Interworking for Messaging Services Stage 3

Huawei, Ericsson

WID

Agreed

Revision of C1-080173

Questioned whether the impact was within the scope of 24.341, or whether the functionality was appropriate to place in a separate specification.








C1-080534

Proposed new work item: IMS System enhancements for corporate network access

Alcatel-Lucent / Keith Drage

WID

Revised to C1-080662

Revision of C1-080232

Some concerns was raised on the dates.








C1-080662

Proposed new work item: IMS System enhancements for corporate network access

Alcatel-Lucent / Keith Drage

WID

Agreed

Revision of C1-080534

Revision of C1-080232

Some concerns was raised on the dates in the tispan documentation and consequently on the end dates of the WI.
























9.19.2

All other Non-IMS-related WIs

Thursday














This agenda item is for other non-IMS related Rel-8 topics not covered by the agenda items above.








C1-080247

Corrections to +CMOLRG

Motorola

27.007

Agreed

TEI8


Moved to agenda item for rel-8







C1-080248

Modify/Add AT-commands for MO Location Request

Motorola

27.007

Withdrawn

TEI8


Moved to agenda item for rel-8







C1-080255

PLMN Selection on receipt of GAN cause Location not allowed

Ericsson

23.122

Revised to C1-080538

TEI8








C1-080256

Handling of NAS-layer cause value when in GAN

Ericsson

24.008

Agreed

TEI8








C1-080287

TCRT: Paging for incoming p-t-p transaction to service subscriber in an ongoing broadcast call

Nokia Siemens Networks

43.069

Agreed







C1-080288

TCRT: Warning tone for call termination due to time out of voice inactivity time

Nokia Siemens Networks

43.068

Revised to C1-080453







C1-080305

I-WLAN NSP

Research in Motion, Telefonica O2 Europe

WID


Revised to C1-080476

This WID is a BB to the stage 1 WID









C1-080453

TCRT: Warning tone for call termination due to time out of voice inactivity time

Nokia Siemens Networks

43.068

Agreed

Revision of C1-080288









C1-080476

I-WLAN NSP

Research in Motion, Telefonica O2 Europe

WID


Agreed

Revision of C1-080305

This WID is a BB to the stage 1 WID








C1-080538

PLMN Selection on receipt of GAN cause Location not allowed

Ericsson

23.122

Revision of C1-080255

TEI8






















































































































































Yüklə 2,28 Mb.

Dostları ilə paylaş:
1   2   3   4   5   6   7




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin