Report of sa wg2 meeting #114


Discussion and conclusion



Yüklə 12,13 Mb.
səhifə145/311
tarix03.01.2022
ölçüsü12,13 Mb.
#43693
1   ...   141   142   143   144   145   146   147   148   ...   311
Discussion and conclusion:

Revision of TD S2 154452 from meeting #112. Revised in TD S2 160760. AT&T asked whether eDECOR is used for 4.3.5.x. Alcatel-Lucent replied that this could be included by aligning with the parameters needed for eDECOR. It was suggested to include an editor's note on this to be further considered at the next meeting (i.e. before TSG approval of the CR). Further clarifications were needed and this was left for further off-line discussion and revised in TD S2 160763 which was reviewed. It was proposed to capture any outstanding issues under 'Other comments' in the CR cover sheet, to be revisited at the ad-hoc meeting. Qualcomm disagreed with this. A number of comments were made and this was further discussed off-line and revised in TD S2 160836 which was reviewed. There were some reservations to this and Ericsson asked for an editor's note to study NAS node selection was requested. It was decided that this could be updated at the next meeting. This CR was then approved.

TD S2 160228 23.401 CR2959 (Rel 13, 'B'): TAU procedure update for CIoT EPS Optimisation. (Source: Huawei, HiSilicon).
Abstract: Summary of change: TAU procedure update to support the CIoT EPS optimization.


Yüklə 12,13 Mb.

Dostları ilə paylaş:
1   ...   141   142   143   144   145   146   147   148   ...   311




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin