Report of sa wg2 meeting #114


Discussion and conclusion



Yüklə 12,13 Mb.
səhifə155/311
tarix03.01.2022
ölçüsü12,13 Mb.
#43693
1   ...   151   152   153   154   155   156   157   158   ...   311
Discussion and conclusion:

Revision of TD S2 154453 from meeting #112. Revised in drafting session to TD S2 16697. It was asked whether RAN can use an existing message for the resume procedure. It was clarified that RAN groups can choose appropriate messages and need not use those used in the stage 2 specification. This was left for further off-line discussion and revised in TD S2 160767. This was revised again, off-line, in TD S2 160827 which was reviewed. Editorial corrections and clean up was needed and this was revised in TD S2 160840 which was approved.

TD S2 160345 (DISCUSSION) MM procedure handling for CIoT UP Optimization. (Source: LG Electronics).
Abstract: This paper proposes to discuss how to handle resumption procedure when a UE initiates MM procedure (e.g. TAU) when applying CIoT UE Optimization.


Yüklə 12,13 Mb.

Dostları ilə paylaş:
1   ...   151   152   153   154   155   156   157   158   ...   311




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin