Report of sa wg2 meeting #114


Discussion and conclusion



Yüklə 12,13 Mb.
səhifə216/311
tarix03.01.2022
ölçüsü12,13 Mb.
#43693
1   ...   212   213   214   215   216   217   218   219   ...   311
Discussion and conclusion:

Drafting session revision of TD S2 160195. This was reviewed and approved.

TD S2 160739 (P-CR) Evaluation and conclusion of Solution #1. (Source: Orange). (Revision of TD S2 160060).
Abstract: This contribution proposes an evaluation and conclusion for solution#1.

Parallel discussion: Extend this solution to key issues 1 & 3.

Discussion and conclusion:

Drafting session revision of TD S2 160060. Further corrections were needed and this was revised off-line in TD S2 160843. This was withdrawn.

TD S2 160197 (P-CR) Overall evaluation addressing key issue #1 and #3 for AULC. (Source: China Unicom, Intel, Orange).
Abstract: This paper proposes overall evaluation and conclusion on solutions for key issue #1 and #3.

Parallel discussion: The group wanted to handle the evaluation.


Yüklə 12,13 Mb.

Dostları ilə paylaş:
1   ...   212   213   214   215   216   217   218   219   ...   311




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin