Discussion and conclusion:
This was revised off-line to TD S2 160603. Withdrawn.
TD S2 160740 (P-CR) Evaluation of Solution 4. (Source: Ericsson). (Revision of TD S2 160160).
Abstract: Evaluation of solution #4.
Parallel discussion: Clarify if the solution is static overload solution or MME/SGSN can reject PRAs during the session if the overload status change Add in the text if and how MME/SGSN can reactivate rejected PRAs.
Discussion and conclusion:
Drafting session revision of TD S2 160160. Further corrections were needed and this was revised off-line in TD S2 160844. This was left for e-mail approval. Approved.
TD S2 160357 (P-CR) Evaluation of Solution #5. (Source: Huawei, Hisilicon).
Abstract: Provide evaluation of solution #5 in order to help make comparison with other solutions and reach conclusion on solution selection.
Parallel discussion: No concern raised during session.
Discussion and conclusion:
Agreed in drafting session. Agreed in parallel sessions. This was Block approved.
Dostları ilə paylaş: |