Discussion and conclusion:
A number of corrections were needed and this was revised off-line in TD S2 160878. This was left for e-mail approval. e-mail revision 3 was agreed. Revised in TD S2 160931. Approved.
Key issue: System related
TD S2 160251 (P-CR) Key Issue on Architecture principle for Grouping of CP Entities. (Source: Sprint).
Abstract: This contribution proposes to discuss about architecture principle for next generation architecture and introduces a key issue for Control Plane entities.
Discussion and conclusion:
Merged with TD S2 160093 in drafting session into TD S2 160670.
TD S2 160094 (P-CR) New key issue: Interconnection model for the control plane functional entities of the core network. (Source: Cisco Systems, Inc., Vodafone, Allot Communications).
Abstract: This paper highlights the issues with the existing control plane interconnection model, which is based on point-to-point interface, and proposes a new key issue to study alternative interconnection model for the control plane functional entities of the core network.
Dostları ilə paylaş: |