Report of sa wg2 meeting #114


Discussion and conclusion



Yüklə 12,13 Mb.
səhifə263/311
tarix03.01.2022
ölçüsü12,13 Mb.
#43693
1   ...   259   260   261   262   263   264   265   266   ...   311
Discussion and conclusion:

Revision of TD S2 160579. Agreed in parallel sessions. This was Block approved.

TD S2 160580 (P-CR) Solution for Key Issue 1. (Source: NEC). (Revision of TD S2 160092).
Abstract: This contribution proposes a solution for the key issue 1 based on the provisioning of packet flow description over the SCEF to the SPR/UDR.

Discussion and conclusion:

Revision of TD S2 160092. Some off-line proposals for changes were reported. This was further discussed off-line and revised in TD S2 160847. This was left for e-mail approval. e-mail revision 3 was agreed. Revised in TD S2 160913. Approved.

TD S2 160581 (P-CR) Provisioning sponsored data connectivity information via SCEF. (Source: China Mobile, China Unicom, Huawei, ZTE). (Revision of TD S2 160099).
Abstract: Proposal to the solution of Provisioning sponsored data connectivity information via SCEF.


Yüklə 12,13 Mb.

Dostları ilə paylaş:
1   ...   259   260   261   262   263   264   265   266   ...   311




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin