Report of sa wg2 meeting #114



Yüklə 12,13 Mb.
səhifə70/311
tarix03.01.2022
ölçüsü12,13 Mb.
#43693
1   ...   66   67   68   69   70   71   72   73   ...   311
Concern #1: Can CT WG3 update the PCC specifications to allow a deferred activation/deactivation of the APN-AMBR without corresponding Stage 2 changes?
Concern #2: Although the request received by CT WG3 is to address a potential signalling storm on the Gx interface, it was recognized that other interfaces may be impacted as well, including GTP-C/NAS level signalling.
As such, a solution addressing Gx only is a partial solution and doesn't handle the end-to-end impact.
Action: CT WG3 kindly asks SA WG2 whether CT WG3 can proceed with the Stage 3 protocol changes to enable the deferred activation of APN-AMBR over Gx or whether related Stage 2 work would be required prior to that.


Yüklə 12,13 Mb.

Dostları ilə paylaş:
1   ...   66   67   68   69   70   71   72   73   ...   311




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin