Report of sa wg2 meeting #114


Discussion and conclusion



Yüklə 12,13 Mb.
səhifə77/311
tarix03.01.2022
ölçüsü12,13 Mb.
#43693
1   ...   73   74   75   76   77   78   79   80   ...   311
Discussion and conclusion:

Postponed TD S2 153752 from meeting #112. This LS was already answered in SA WG2#112 (TD S2 154406). Noted in parallel sessions.

TD S2 160063 23.402 CR2925 (Rel 13, 'F'): Correction to ePDG selection for emergency bearer services. (Source: Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks).
Abstract: Summary of change: clause4.5.4a.3 about the Dynamic selection of an ePDG that can support emergency sessions is modified to refer only to the 'Operator Identifier' FQDN as described in clause 4.5.4.2.


Yüklə 12,13 Mb.

Dostları ilə paylaş:
1   ...   73   74   75   76   77   78   79   80   ...   311




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin