Report of sa wg2 meeting #114


Discussion and conclusion



Yüklə 12,13 Mb.
səhifə10/311
tarix03.01.2022
ölçüsü12,13 Mb.
#43693
1   ...   6   7   8   9   10   11   12   13   ...   311
Discussion and conclusion:

This LS was noted.

TD S2 160056 LS from TSG SA: LS to WGs on Application Architecture related SI/WI proposals not related to Critical Communications. (TSG SA)
Abstract: During TSG SA #70,.a proposal to change the Terms of Reference (TOR) for SA WG6 was considered. The proposal was to expand the scope of SA WG6 to include application architecture work (as described by the current SA WG6 TOR) beyond that related to critical communications. After presentation of the proposal, there followed a discussion, of how to address new application areas beyond that represented by MCPTT. TSG SA agreed that new application architecture related study and work item proposals (not related to critical communications) should first be brought to TSG SA Plenary for discussion. The approval and assignment to the appropriate working group, of such proposals, will be determined on a case-by-case basis. If necessary, as a consequence of approving such proposals, SA Plenary will consider if TOR modifications are required for SA WG6, or other 3GPP Working Group, in order to accommodate such work.

Convenors comment: Proposed to be considered by every WG, i.e. also by SA WG2, when receiving WI proposals that are considered as 'Application Architecture related proposals'.


Yüklə 12,13 Mb.

Dostları ilə paylaş:
1   ...   6   7   8   9   10   11   12   13   ...   311




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin