This agenda item was convened by Puneet Jain (Intel).
TD S2 160045 LS from RAN WG3: LS on DECOR and MOCN rerouting. (RAN WG3)
Abstract: RAN WG3 has discussed the interaction of MOCN rerouting for non-supporting UEs and DECOR rerouting and it was decided that MOCN rerouting first selects an operator that can serve the UE and after that an operator may initiate DECOR rerouting. After DECOR rerouting, the SGSN in the DCN ends the MOCN rerouting procedure with NAS accept in the DIRECT TRANSFER message.
Action: RAN WG3 asks SA WG2 to capture this in appropriate specifications.
Decision:
The document was noted.
TD S2 160507 23.401 CR2961R1 (Rel 13, 'F'): Alignment of support for DECOR in shared networks. (Source: TeliaSonera AB). (Revision of TD S2 160249).
Abstract: RAN WG3 has defined the Stage 3 details of how DECOR and MOCN interact. This CR introduces the assumptions made by RAN WG3 in Stage 2 specifications. Text is added to Section 4.3.25.3 to align the Stage 2 description of DECOR in MOCN shared networks.