Report of sa wg2 meeting #114


Discussion and conclusion



Yüklə 12,13 Mb.
səhifə147/311
tarix03.01.2022
ölçüsü12,13 Mb.
#43693
1   ...   143   144   145   146   147   148   149   150   ...   311
Discussion and conclusion:

Some corrections were needed and this was left for further off-line discussion and revised off-line in TD S2 160766 which was reviewed. A further correction was needed and this was revised off-line in TD S2 160838 which was reviewed. The CR revision number needed correction and this was revised accordingly also to clean up the cover sheet, in TD S2 160908 which was approved.

TD S2 160322 23.401 CR2951R4 (Rel 13, 'B'): Introduction of attach procedure changes for CIoT EPS optimization. (Source: Alcatel-lucent?, Vodafone?, Qualcomm). (Revision of TD S2 154452).
Abstract: Summary of change: The Attach procedure changes are introduced A new section allowing network preferred behaviour negotiation is introduced. Header compression configuration during Attach is added.


Yüklə 12,13 Mb.

Dostları ilə paylaş:
1   ...   143   144   145   146   147   148   149   150   ...   311




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin