Report of sa wg2 meeting #114


Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)



Yüklə 12,13 Mb.
səhifə196/311
tarix03.01.2022
ölçüsü12,13 Mb.
#43693
1   ...   192   193   194   195   196   197   198   199   ...   311

6.8 Feasibility Study on Control and User Plane Separation of EPC nodes (FS_CUPS)

Lawful interception

TD S2 160081 (P-CR) Consideration for performing LI functionality. (Source: Cisco Systems, Inc).
Abstract: This paper proposes one solution to support the LI reference points in the split architecture. The proposal is to terminate the LI related reference points in the control plane function.

Discussion and conclusion:

There were a number of questions for clarification and it was suggested to remove the text describing how the proposal is reached. This was left for off-line discussion and revised in TD S2 160559 which was reviewed. Alcatel-Lucent asked for a correction and this was discussed off-line and revised in TD S2 160854. This was left for e-mail approval. e-mail revision 4 was agreed. Revised in TD S2 160919. Approved.

TD S2 160418 (P-CR) Lawful interception in split architectures. (Source: Huawei, HiSilicon).
Abstract: This paper propose a solution for LI in split architectures.


Yüklə 12,13 Mb.

Dostları ilə paylaş:
1   ...   192   193   194   195   196   197   198   199   ...   311




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin