Report of sa wg2 meeting #114


Discussion and conclusion



Yüklə 12,13 Mb.
səhifə201/311
tarix03.01.2022
ölçüsü12,13 Mb.
#43693
1   ...   197   198   199   200   201   202   203   204   ...   311
Discussion and conclusion:

Revision of TD S2 160267, merging TD S2 160239. It was agreed to remove 6.1.1.5.2 and (the second) 6.1.1.5.4.1. This was revised in TD S2 160857 which was approved.

TD S2 160295 (OTHER) GTP U IP address assignment and TEIDs allocation. (Source: Samsung).
Abstract: This contribution provides an option of supporting IP address assignment of GTP entities in control plane and TEIDs allocation in user plane.

Discussion and conclusion:

Huawei commented that this was a mixture of other solutions. Samsung commented that this adds the flows for the two solutions. This was left for off-line discussion and was revised in TD S2 160564 which was reviewed. Samsung asked to note this and they will refine it for contribution to the next meeting. This was then noted.


TAI list

TD S2 160241 (P-CR) CUPS Solutions for SGW Service Area. (Source: ZTE, KDDI).
Abstract: This contribution propose two solutions to address the key issue in clause 6.1.1.7 'Consideration for SGW Service Area and TAI list alignment due to control plane and user plane split of SGW'.


Yüklə 12,13 Mb.

Dostları ilə paylaş:
1   ...   197   198   199   200   201   202   203   204   ...   311




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin