Discussion and conclusion:
Not Handled.
TD S2 160245 (P-CR) CUPS Dynamic load consideration for user plane selection. (Source: ZTE, KDDI).
Abstract: In this contribution, it is proposed to use dynamic reporting mechanism to retrieve the user plane node load.
Discussion and conclusion:
Not Handled.
TD S2 160240 (P-CR) CUPS Handover clarifications. (Source: ZTE, KDDI).
Abstract: In this contribution, some clarifications regarding the handover in the SGW-U relocation procedure are proposed.
Discussion and conclusion:
Some comments were made and clarifications were needed and this was left for further off-line discussion and revised in TD S2 160777 which was reviewed. Further corrections were suggested and this was further discussed off-line and revised in TD S2 160860. This was left for e-mail approval. Approved.
TD S2 160416 (P-CR) Solution to Key Issue 4. (Source: Huawei, HiSilicon).
Abstract: In this contribution, a solution is proposed to address key issue 4.
Dostları ilə paylaş: |