Report of sa wg2 meeting #114


Discussion and conclusion



Yüklə 12,13 Mb.
səhifə21/311
tarix03.01.2022
ölçüsü12,13 Mb.
#43693
1   ...   17   18   19   20   21   22   23   24   ...   311
Discussion and conclusion:

Revision of S2-160503. Agreed in parallel sessions. This was Block approved.

TD S2 160504 23.682 CR0156R2 (Rel 13, 'F'): Determination of MB2/Ns interface connection agreement. (Source: Samsung). (Revision of TD S2 160110).
Abstract: Summary of change: The SCEF derives the targeted PLMN ID from the location information included in the request in order to determine if it has MB2/Ns interface connection agreement with the PLMN.

Discussion and conclusion:

Revision of S2-160110. Agreed in parallel sessions. This was Block approved.

TD S2 160438 23.682 CR0163 (Rel 13, 'F'): No multiple External IDs or MSISDNs for monitoring event configuration. (Source: Samsung).
Abstract: Summary of change: Removal of possibility to add multiple External IDs or MSISDNs in the Monitoring Request message in describing the Monitoring Event Configuration and Deletion via HSS procedure.

Parallel discussion: Left open.

Decision:

The document was noted.

TD S2 160298 23.682 CR0161 (Rel 13, 'F'): Correct Event and Trigger Name – Availability after DDN Failure. (Source: Alcatel-Lucent).
Abstract: Summary of change: In Figure 5.7.2.1-1 step 2, correct the event name.


Yüklə 12,13 Mb.

Dostları ilə paylaş:
1   ...   17   18   19   20   21   22   23   24   ...   311




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin