Report of sa wg2 meeting #114


Discussion and conclusion



Yüklə 12,13 Mb.
səhifə229/311
tarix03.01.2022
ölçüsü12,13 Mb.
#43693
1   ...   225   226   227   228   229   230   231   232   ...   311
Discussion and conclusion:

Orange asked the reasoning behind the requirement in 4, for support of multi-RAT connectivity, as currently dual-connectivity is for a single RAT. It was suggested to clarify bullet 3 and remove bullet 4. This was further discussed off-line and revised in TD S2 160709 which was reviewed. 'compatible' should be corrected to 'comparable'. Issues were raised with bullet 3 and this needed clarification. This was further discussed off-line and revised in TD S2 160816 which was reviewed. MediaTek asked what was meant by multiple simultaneous connectivity. This was left for a future meeting and was noted.


Architectural Assumptions

TD S2 160169 (P-CR) Core and Access functional allocation. (Source: Ericsson).
Abstract: Providing functional requirements for core and access aspects.


Yüklə 12,13 Mb.

Dostları ilə paylaş:
1   ...   225   226   227   228   229   230   231   232   ...   311




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin