Report of sa wg2 meeting #114


Discussion and conclusion



Yüklə 12,13 Mb.
səhifə285/311
tarix03.01.2022
ölçüsü12,13 Mb.
#43693
1   ...   281   282   283   284   285   286   287   288   ...   311
Discussion and conclusion:

Revision of TD S2 160433. This was Block approved.

TD S2 160500 (P-CR) Architectural assumptions and requirements for FS_GENCEF. (Source: Samsung). (Revision of TD S2 160435).
Abstract: Architectural assumptions and requirements for FS_GENCEF are presented.

Discussion and conclusion:

Revision of TD S2 160435. Revised in parallel sessions to TD S2 160539. This was left for e-mail approval. e-mail revision 2 was agreed. Revised in TD S2 160932. Approved.

TD S2 160501 (P-CR) Key issue of Group Creation and Modification. (Source: Convida Wireless, Samsung). (Revision of TD S2 160129).
Abstract: This contribution proposes a new key issue for GENCEF.

Discussion and conclusion:

Revision of TD S2 160129. This was revised off-line in TD S2 160871 which was reviewed and approved.

TD S2 160502 (P-CR) Key issue proposal: Minimization of signaling load. (Source: Samsung). (Revision of TD S2 160434).
Abstract: A new key issue aiming at studying minimization of signaling load is proposed.

Discussion and conclusion:

Revision of TD S2 160434. This was Block approved.

TD S2 160436 (P-CR) New solution: Group management via HSS. (Source: Samsung).
Abstract: A new solution to address the key issue on supporting group management is presented.

Discussion and conclusion:

The document was Postponed.



Yüklə 12,13 Mb.

Dostları ilə paylaş:
1   ...   281   282   283   284   285   286   287   288   ...   311




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin