Report of sa wg2 meeting #114


Discussion and conclusion



Yüklə 12,13 Mb.
səhifə291/311
tarix03.01.2022
ölçüsü12,13 Mb.
#43693
1   ...   287   288   289   290   291   292   293   294   ...   311
Discussion and conclusion:

Orange suggested changing the text from 'the study shall consider ...' to 'the study considers ...' etc. Other clarifications were also requested. This was revised off-line in TD S2 160745 which was reviewed and approved.

TD S2 160213 (P-CR) Robovolte Architectural Requirements. (Source: Huawei).
Abstract: This paper proposes architectural requirements of the TR for FS_RobVoLTE.

Discussion and conclusion:

Ericsson asked to replace 'should' with 'shall'. Nokia Networks suggested this should be clarified that no new interfaces or functional entities are to be defined. This was left for off-line discussion and revised in TD S2 160746 which was reviewed and approved.

TD S2 160360 (P-CR) Key issue Robust call in bad LTE coverage with 2G or 3G CS coverage. (Source: Huawei, HiSilicon, Intel, China Unicom, Deutsche Telekom, China Mobile, Teliasonera).
Abstract: This paper proposes a key issue for VoLTE subscriber call setup failure when in bad LTE coverage overlaid with 2/3G CS coverage.


Yüklə 12,13 Mb.

Dostları ilə paylaş:
1   ...   287   288   289   290   291   292   293   294   ...   311




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin