Discussion and conclusion:
Orange suggested changing the text from 'the study shall consider ...' to 'the study considers ...' etc. Other clarifications were also requested. This was revised off-line in TD S2 160745 which was reviewed and approved.
TD S2 160213 (P-CR) Robovolte Architectural Requirements. (Source: Huawei).
Abstract: This paper proposes architectural requirements of the TR for FS_RobVoLTE.
Discussion and conclusion:
Ericsson asked to replace 'should' with 'shall'. Nokia Networks suggested this should be clarified that no new interfaces or functional entities are to be defined. This was left for off-line discussion and revised in TD S2 160746 which was reviewed and approved.
TD S2 160360 (P-CR) Key issue Robust call in bad LTE coverage with 2G or 3G CS coverage. (Source: Huawei, HiSilicon, Intel, China Unicom, Deutsche Telekom, China Mobile, Teliasonera).
Abstract: This paper proposes a key issue for VoLTE subscriber call setup failure when in bad LTE coverage overlaid with 2/3G CS coverage.
Dostları ilə paylaş: |