PUBLIC HEALTH DIRECTORATE
REQUEST FOR PROPOSALS FOR THE MAITLANDS NATURE RESERVE
CONTRACT ENQUIRY NO.: 369/5/2011-2012
TENDERER
|
|
TELEPHONE / FACSIMILE
|
|
|
CLOSING DATE
|
|
NOVEMBER 2011
ISSUED BY:
Nelson Mandela Bay Metropolitan Municipality
Public Health Directorate
Environmental Management Sub-directorate
PO Box 11
PORT ELIZABETH
6000
Contact Person: Mr J Mkosana
Tel: +2741 506 5464
COMPULSORY MEETING
A compulsory briefing meeting to be held on 22 November 2011 at 11h00 in the Boardroom, SCM Unit, Harrower Road Offices must be attended by the applicant’s authorized representative.
An attendance register will be taken at the meeting and submissions by applicants who were not represented will not be accepted.
CLOSING DATE, TIME AND VENUE FOR SUBMISSIONS
One bound copies of the proposal, clearly marked “Contact Enquiry 369/5/2011-2012, Maitlands Proposal – Attention Mr. J Mkosana” must be deposited in the NMBMM Tender Box, which is located at the SCM Unit, Harrower Road Offices, Port Elizabeth or City Hall, Uitenhage by no later than 11h00 on 23 February 2012 where after same will be open in public at the same venues.
No late submissions will be accepted.
Posted, e-mailed, or faxed submissions will also not be accepted.
ENQUIRIES
Mr J Mkosana
Nelson Mandela Bay Metropolitan Municipality
Email: jmkosana@mandelametro.gov.za and phowes@mandelametro.gov.za
Tel: 041 - 506 5464
Fax: 041 – 585 7261
13th Floor
Brister House
Govan Mbeki Avenue
Port Elizabeth
6001
TABLE OF CONTENTS
DISCLAIMER
IMPORTANT NOTICE
1. INTRODUCTION 1
2. LEGAL ISSUES AND REQUIREMENTS 1
3. GENERAL INFORMATION 2
3.1 Location
3.2 Site information
3.3 Title deed and town planning restrictions
3.4 Civil services available
3.5 Existing facilities
3.6 Existing initiatives
4. ENVISAGED DEVELOPMENT 5
4.1 Introduction
4.2 Suggestions for type of facilities suitable for Maitland Nature Reserve
4.3 Access
4.4 Development platform and envelope (height, size etc.)
5. ADDITIONAL INFORMATION 9
6. TOURISM POTENTIAL 10
7. ENVIRONMENTAL REQUIREMENTS 11
7.1 Background
7.2 Environmental management principals
7.3 Generic requirements
7.4 Location based requirements
8. MINIMUM CRITERIA FOR PROPOSAL DOCUMENT 12
8.1 Functional and Spatial requirements
8.2 Legal requirements
8.3 Financial requirements
9. EVALUATION 16
10. SWORN STATEMENTS 18
11. GENERAL TERMS 18
12. APPOINTMENT 19
ANNEXURE “A” - Functionality criteria score sheet 20
ANNEXURE “B” - Affidavit for Companies, close Corporations and Trusts 22
ANNEXURE “C” - Affidavit for Individuals 25
ANNEXURE “D” - Certificate of Independent Bid Determination 27
ANNEXURE “E” - Suggested pro-forma for Budgeted Income Statement 30
ANNEXURE “L” - Suggested pro-forma for “price” 31
DISCLAIMER
This RFP has been prepared for the purpose of providing information to interested parties and allowing them to respond to it as part of the tender process of the Nelson Mandela Bay Metropolitan Municipality (NMBMM).
The NMBMM accepts no liability for any loss incurred by any person(s) due to events or actions taken as a consequence of the preparation and dissemination of this RFP document.
The NMBMM accepts no responsibility for the fairness, accuracy or completeness of any information or opinions, for any errors, omissions or mis-statements, negligent or otherwise, made by any person in this RFP document or any written or oral communication transmitted or made available at any time to an interested party or its advisers.
IMPORTANT NOTICE
Interested Parties are to note that the submission of any Proposal does not confer any right or expectation on any party that the NMBMM will accept any specific Proposal.
Any person submitting any Proposal agrees that the NMBMM shall be entitled to utilize any Intellectual Property contained in such Proposal and such party waives and abandons any claim of copyright and/or any other rights in respect of any such Intellectual Property.
The only, lowest or any proposal will not necessarily be accepted and the NMBMM reserves the right to accept the whole or any portion of any proposal and/or to withdraw this Request for Proposals.
NOTE:
Please read the instructions regarding returnables from Clause 8 in conjunction with the rest of the document.
Complete and submit Annexure A,(B or C),D,E and L where applicable.
Compile and attach Annexures F, G, H, I, J and K
-
INTRODUCTION
1.1 The purpose of this Request For Proposals (RFP) is to invite interested parties (Applicant/s) to submit proposals for the development of the Maitland Nature Reserve (the Reserve) in a Joint Venture (“JV”) with a Community Group or Entity (to be selected by the NMBMM pursuant to a separate competitive bidding process) in exchange for which development the JV will be granted a long term lease of the properties constituting the Reserve to enable the JV to use, manage and control the existing facilities situate on the properties (and the facilities to be established on the properties in terms of the proposal) in terms of the envisaged lease for the JV’s own account.
1.2 To encourage and ensure the involvement of the local community in the envisaged project, the NMBMM has called for an Expression of Interest from Community Groups or Entities situated in close proximity to the Reserve. It is envisaged that the successful Applicant and the successful Community Group or Entity will form a JV on a 74% (Applicant)/26%(Community Group or Entity) equity ownership basis under which to contract with the NMBMM subject to the Community Group or Entity being in a position to contribute its required equity funding of the envisaged JV. In this regard, Applicants are advised that the possibility exists that the Development Bank of South Africa and/or, the Eastern Cape Development Corporation and/or various Development Financing Institutions may well be prepared to consider financing the envisaged Project although no guarantees are furnished or to be implied in this regard.
1.3 It is accordingly a prerequisite that any interested party intending to respond to this RFP shall be prepared to conclude a Joint Venture agreement with the Community Group or Entity to be selected by the NMBMM.
-
LEGAL ISSUES AND REQUIREMENTS
2.1 The properties constituting the Reserve and identified in Chapter 3 below are currently registered in the name of the Regional Services Council – PE and a prerequisite to any award to be made in terms of this RFP is that a vesting transfer be registered in relation to the properties to reflect the NMBMM as owner thereof.
2.2 Any award to be made under this RFP shall furthermore be subject to such consents as may be required in terms of the Title Deeds under which the properties are held and the removal of such restrictive conditions contained therein which are inconsistent with the envisaged development.
2.3 To the extent that multiple properties constitute the Reserve, the NMBMM shall reserve the right in any lease to be concluded pursuant hereto (and the establishment of the JV referred to above) to consolidate such properties.
2.4 Any lease and the grant of any rights to use, control and manage the properties pursuant hereto (which shall be in favour of the JV) shall be subject to the prior compliance with the provisions of the Local Government: Municipal Finance Management Act 56 of 2003 and the Regulations promulgated thereunder and in particular, the Asset Transfer Regulations 2008.
2.5 The envisaged lease between the NMBMM and the JV (to be formed by the successful Applicant and the successful Community Group or Entity) shall consist of, inter alia, three phases, the first phase being for a period of two years from the date of conclusion thereof within which period the Applicant shall be obliged to acquire such consents, permissions or approvals as may be statutorily and/or otherwise required to undertake the development upon the properties. Phase two shall be for a period of two years commencing after phase one within which period the Applicant shall be obliged to undertake and complete its proposed development of the properties and phase three shall commence thereafter and endure for a period of thirty (30) years.
3. GENERAL INFORMATION
3.1 Location
Maitland Nature Reserve is situated approximately 30km west of Port Elizabeth at the mouth of the Maitland River. The Reserve has a unique combination of natural elements, which includes hills, indigenous forest and access to beaches - all of which are ingredients for great recreation potential.
The reserve is largely undisturbed, with previous developments mostly situated at the node indicated “C”. Note that the sand dune, lagoon and beach falls outside the proposed lease area. The Reserves consists of multiple properties with an overall size of roughly 130ha.
KEY:
A – Area proposed for self-catering chalets
B – Area proposed for up-market tented camp
C – Existing open picnic area
A
B
C
3.2 Site information
Status of Nature Reserve: Declared Nature Reserve
FARM NO
|
TITLE DEED
|
ZONING
|
EST. SIZE
|
OWNER
|
Portion 18 of 478, Maitland Mines
|
T5072/1971
|
Open Space Zone 3
|
27.7568ha
|
Regional Services Council – PE
|
Portion 19 of 478, Maitland Mines
|
T27114/1972
|
Open Space Zone 3
|
14.2653ha
|
Regional Services Council – PE
|
Portion 20 of 478, Maitland Mines
|
T27114/1972
|
Open Space Zone 3
|
16,3464ha
|
Regional Services Council – PE
|
Portion 21 of 478, Maitland Mines
|
T27114/1972
|
Open Space Zone 3
|
16,0442ha
|
Regional Services Council – PE
|
Portion 22 of 478, Maitland Mines
|
T18228/1975
|
Open Space Zone 3
|
24.8399ha
|
Regional Services Council – PE
|
Portion 23 of 478, Maitland Mines
|
T18228/1975
|
Open Space Zone 3
|
19,1006ha
|
Regional Services Council – PE
|
Portion 31 of 478, Maitland Mines
|
T24536/1970
|
Open Space Zone 3
|
9,7726ha
|
Regional Services Council – PE
|
Portion 66 of 478, Maitland Mines
|
T37718/1970
|
Open Space Zone 3
|
1,6599ha
|
Regional Services Council – PE
|
Portion 67 of 478, Maitland Mines
|
T24216/1973
|
Open Space Zone 3
|
1,7133ha
|
Regional Services Council – PE
|
Portion 68 of 478, Maitland Mines
|
T24216/1973
|
Open Space Zone 3
|
8009 square meters
|
Regional Services Council – PE
|
Portion 69 of 478, Maitland Mines
|
T24216/1973
|
Open Space Zone 3
|
2698 square meters
|
Regional Services Council – PE
|
3.3 Title deed and town planning restrictions
-
Copies of the Title Deeds under which the properties are held are available on request.
-
It shall be the responsibility of each JV and Applicant to ensure that its envisaged development of the properties does not contravene any applicable Town Planning restrictions.
-
Open Space Zone 3 falls under the Section 8 General Zoning Scheme. The primary use is as a “Nature Reserve”, where “Nature Reserve is defined as a National Park or other nature park under the ownership of a public authority, or any other game park or reserve where natural flora and fauna is protected. Accommodation facilities for tourists and holiday makers as well as overnight facilities are allowed.
3.4 Civil services available
-
At node A
Service
|
Available
|
Capacity and point of availability
|
Water
|
Yes
|
Unknown
|
Electricity
|
Unknown
|
Unknown
|
Waterborne sewerage
|
Unknown
|
Unknown
| -
At node B
Service
|
Available
|
Capacity and point of availability
|
Water
|
No
|
None
|
Electricity
|
No
|
None
|
Waterborne sewerage
|
No
|
None
| -
At node C
Service
|
Available
|
Capacity and point of availability
|
Water
|
Yes
|
Unknown
|
Electricity
|
Unknown
|
Unknown
|
Waterborne sewerage
|
Unknown
|
Unknown
|
3.5 Existing facilities
-
Good access road
-
Basic picnic facilities shared between Portion 66/478 and privately owned property Portion 36/478
-
Basic ablutions
-
Entrance gate
-
Run-down hall
3.6 Existing initiatives
-
Proposed new parking area at picnic site (NMBMM)
-
Proposed boardwalk connection from picnic site to beach (NMBMM)
4. ENVISAGED DEVELOPMENT
4.1 Introduction
The new development in Maitland Nature Reserve is envisaged to perform a complimentary function to the reserve. Suitable facilities previously identified are described below. Any additional functions or inspired proposals by the Applicant, that will enhance and highlight the existing natural environmental features of the nature reserve, will be considered.
4.2 Suggestions for suitable facilities at Maitland Nature Reserve
-
Self catering chalets (Node A):
The area around the accommodation should be demarcated and the chalets should be of a temporary nature (timber structures, or lightweight structures), and should leave no footprint should the NMBM wish to demolish these structures at the end of the lease period. Support structures should include a reception area with ablutions, cleaner’s store and linen store.
Suggested typical chalets:
Type 1: Accommodation for 4 people
|
Area or capacity
|
1 bedroom
|
Minimum 12m²
|
Open plan kitchen – living area with bunker beds
|
Minimum 25m²
|
Bathroom
|
Approximately 6m²
|
Braai facility and outdoor seating area
|
Approximately 12 m²
|
Type 2: Accommodation for 6 people
|
Area or capacity
|
2 bedrooms
|
Minimum 12m² each
|
Open plan kitchen – living area with bunker beds
|
Minimum 25m²
|
Bathroom
|
Approximately 6m²
|
Braai facility and outdoor seating area
|
Approximately 16 m²
|
-
Up-market tented camp (Node B):
The number of up-market tent structures proposed must be linked to a feasibility study to be submitted with this proposal. The area around the accommodation should be fenced and the tent structures should be of a temporary nature (timber structures, or lightweight structures), and should leave no footprint should the NMBM wish to demolish these structures at the end of the lease period.
Suggested typical tent structures:
Accommodation for 2 people
|
Area or capacity
|
1 bedroom
|
Minimum 12m²
|
Bathroom
|
Minimum 4m²
|
Suggested typical support structures:
Accommodation
|
Area or capacity
|
Large outdoor seating area
|
|
Large indoor lounge / reading area / games area
|
|
Restaurant / dining area
|
|
Possibility of outdoor pool
|
|
Walkways to tents and communal areas
|
|
Viewing decks
|
|
-
Upgrade existing picnic facilities (Node C): (picnic area shared with private property owner)
Proposals by applicant to upgrade existing facilities must be described in site development plan. Only basic facilities are needed: a braai and rubbish bins at each picnic site, the upgrading of existing ablution facility will be necessary. The possibility exists to develop a backpackers lodge with an interpretation centre and/or lapa/an adventure/tuck/souvenir-shop at the picnic site. The NMBMM is planning to relocate the parking area on the sea-side to the picnic area.
4.3 Access
-
Access to remain along existing external/internal routes.
-
Parking standards: conform to Department of Transportation Standards and NMBMM requirements.
-
Current no access to Node B, will need to be created.