HSE-BMS-006 Risk Assessment & JSA

Majority of accident that happens in the construction site is due to the fact that more personnel involved in the construction activities lack the basic knowledge of the various job step, the hazards and the control measures for each hazard

  • Majority of accident that happens in the construction site is due to the fact that more personnel involved in the construction activities lack the basic knowledge of the various job step, the hazards and the control measures for each hazard
  • The Work Method of Statement, Risk Assessment & Job Safety Analysis (JSA) will cover this gap by giving the people the necessary training, information etc… about each job (task) and how to carry it out without accidents
  • Introduction

JSA shall be conducted during;

  • JSA
  • JSA shall be conducted during;
  • Critical task
  • Non-routine Task
  • Permit To Work Task
  • Routine Task (Daily/pre-task)
  • Every work activities shall have a corresponding Work Method of Statement prepared by the task Supervisor or task Manager.
  • Risk Assessment shall be done with respect to the corresponding hazard that will be analyzed and mitigating measures during job hazard analysis.
  • JSA will be conducted to break down each job steps into safe more detailed procedures.
  • Risk Assessment is an extremely useful tool in providing a framework in which to identify the potential hazards & evaluate the risks associated with all our activities.
  • Risk Assessment now forms a routine element in education & training within the Project.
  • Risk Assessment
  • To prevent workplace injury, disease & property damage, it is necessary to identify the cause of accidents
  • This can de done:
    • Reactively by accident investigation, or
    • Proactively by carrying out risk assessments
  • Risk assessment enables the identification of those events or activities, which could cause harm & evaluation of the associated risks.
  • Risk Assessment
  • IDENTIFY POTENTIAL LOSS
  • Risk Assessments involve addressing the following questions:
    • What could go wrong?
    • How likely are such events?
    • What would happen if such events occurred?
    • What are the associated risks?
    • Are the risks acceptable?
    • How can the risks be reduced...or removed?
  • Risk Assessment
  • There is confusion in the interpretations of familiar words such as accident, hazard, risk & danger and so on;
  • Different sources of information put similar but different interpretations on these expressions or terms
  • So for the purpose of discussing risk assessment the following conditions apply on the Project:
  • 1. RISK ASSESSMENT
  • This is the process of identifying hazards and assessing the risk of harm and loss threatened by the hazard.
  • Definition

Yüklə 0,76 Mb.

Dostları ilə paylaş:
  1   2   3   4




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin