Port Lincoln/Ceduna ESA
Map of the Port Lincoln/Ceduna ESA.
Disclaimer: The contents of this report are based on information available at the time of compilation. Over time, the reliability of the data and information may diminish. The Commonwealth, its officers, employees and agents do not accept responsibility for any inaccuracies contained in the report or for any negligence in the compilation of the report and disclaim liability for any loss suffered by any person arising from the use of this report.
Population Characteristics
In June 2011, the estimated resident population (ERP) of the Port Lincoln/Ceduna ESA was 35,965, representing a 0.3 per cent increase compared to a year earlier. Over the five years to June 2011, the ESA’s population grew by 3.3 per cent, which was lower than the growth rate for South Australia as a whole over the same period (5.6 per cent). The Port Lincoln/Ceduna ESA comprised 2.2 per cent of the state’s total population in June 2011. (Source: ABS Catalogue 3218.0, Regional Population Growth, Australia, 2010-11.)
ABS Census data show that there were 2,231 indigenous persons living in the Port Lincoln/Ceduna ESA in August 2011. This represented 6.5 per cent of the local population, and 7.3 per cent of the State’s total indigenous population.
The following chart depicts persons by 5-year age cohorts, comparing changes between the 2001 and 2011 ABS Census counts.
Population Characteristics (cont)
Persons by Country of Birth
|
Males
|
Females
|
Persons
|
% of Total
|
Australia
|
15,326
|
14,935
|
30,261
|
88.5%
|
Bosnia and Herzegovina
|
3
|
0
|
3
|
0.0%
|
Cambodia
|
0
|
4
|
4
|
0.0%
|
Canada
|
12
|
10
|
22
|
0.1%
|
China (excl SARs and Taiwan)
|
3
|
7
|
10
|
0.0%
|
Croatia
|
47
|
29
|
76
|
0.2%
|
Egypt
|
7
|
8
|
15
|
0.0%
|
Fiji
|
0
|
7
|
7
|
0.0%
|
Former Yugoslav Republic of Macedonia
|
3
|
3
|
6
|
0.0%
|
Germany
|
80
|
58
|
138
|
0.4%
|
Greece
|
14
|
17
|
31
|
0.1%
|
Hong Kong (SAR of China)
|
0
|
7
|
7
|
0.0%
|
India
|
20
|
16
|
36
|
0.1%
|
Indonesia
|
0
|
9
|
9
|
0.0%
|
Iraq
|
0
|
0
|
0
|
0.0%
|
Ireland
|
14
|
4
|
18
|
0.1%
|
Italy
|
29
|
27
|
56
|
0.2%
|
Japan
|
3
|
9
|
12
|
0.0%
|
Korea, Republic of (South)
|
6
|
6
|
12
|
0.0%
|
Lebanon
|
0
|
0
|
0
|
0.0%
|
Malaysia
|
6
|
14
|
20
|
0.1%
|
Malta
|
3
|
4
|
7
|
0.0%
|
Netherlands
|
57
|
67
|
124
|
0.4%
|
New Zealand
|
139
|
117
|
256
|
0.7%
|
Philippines
|
28
|
75
|
103
|
0.3%
|
Poland
|
10
|
3
|
13
|
0.0%
|
Singapore
|
0
|
0
|
0
|
0.0%
|
South Africa
|
35
|
36
|
71
|
0.2%
|
South Eastern Europe, nfd
|
6
|
5
|
11
|
0.0%
|
Sri Lanka
|
0
|
4
|
4
|
0.0%
|
Thailand
|
3
|
24
|
27
|
0.1%
|
Turkey
|
0
|
0
|
0
|
0.0%
|
United Kingdom Channel Islands and Isle of Man
|
465
|
556
|
1,021
|
3.0%
|
United States of America
|
19
|
21
|
40
|
0.1%
|
Vietnam
|
0
|
3
|
3
|
0.0%
|
Born elsewhere
|
118
|
107
|
225
|
0.7%
|
Country of birth not stated
|
823
|
741
|
1,564
|
4.6%
|
MESC
|
684
|
744
|
1,428
|
4.2%
|
OTMESC
|
328
|
406
|
734
|
2.1%
|
Total ESA
|
17,279
|
16,933
|
34,212
|
100.0%
|
Source: ABS 2011 Census
MESC = Main English Speaking Countries. Includes Canada, Ireland, New Zealand, United Kingdom, USA and South Africa
OTMESC = Other than Main English Speaking Countries
Educational Attainment
ABS 2006 Census data show that around 28 per cent of persons aged 15+ in the Port Lincoln/Ceduna ESA held a non-school qualification, compared to 37 per cent for South Australia as a whole.
The following table shows the number and proportion of major non-school qualifications held by residents (aged 15+) in the ESA compared to all ESAs in South Australia.
Persons Aged 15+ with a Non-school Qualification
|
Port Lincoln/
Ceduna ESA
(No. persons)
|
% Share
|
All ESAs
(No. persons)
|
% Share
|
Postgraduate Degree
|
133
|
0.5
|
22849
|
1.9
|
Graduate Diploma and Graduate Certificate
|
229
|
0.8
|
16073
|
1.3
|
Bachelor Degree
|
1422
|
5.3
|
120768
|
9.9
|
Advanced Diploma and Diploma
|
1233
|
4.6
|
79573
|
6.5
|
Certificate
|
4655
|
17.2
|
212177
|
17.4
|
Total
|
7672
|
28.4
|
451440
|
37.0
|
Source: ABS 2006 Census
Labour Force Status by Highest Non-School Qualification and Highest Year of School Completed
Highest Qualification/ School Year
|
Unemployed
|
Employed
|
Unemployment Rate
|
Post Graduate
|
0.0%
|
0.7%
|
0.0%
|
Graduate Diploma/Graduate Certificate
|
0.4%
|
1.2%
|
1.5%
|
Bachelor Degree
|
2.6%
|
7.6%
|
1.5%
|
Advanced Diploma/Diploma
|
3.1%
|
6.2%
|
2.1%
|
Certificate III or IV
|
12.1%
|
19.3%
|
2.7%
|
Certificate 1 or 11
|
3.4%
|
2.1%
|
6.7%
|
Certificate level nfd.
|
1.7%
|
2.0%
|
3.8%
|
Non-school qualification not stated
|
6.9%
|
6.0%
|
4.8%
|
Year 12
|
12.0%
|
14.3%
|
3.6%
|
Year 11
|
16.6%
|
16.7%
|
4.2%
|
Year 10
|
25.2%
|
15.0%
|
6.9%
|
Year 9
|
7.6%
|
4.7%
|
6.7%
|
Year 8 or below
|
6.7%
|
3.6%
|
7.7%
|
Did not go to school
|
0.4%
|
0.1%
|
20.0%
|
Highest year of school not stated
|
1.3%
|
0.5%
|
10.7%
|
Total
|
100.0%
|
100.0%
|
4.3%
|
Source: ABS 2006 Census (Tablebuilder)
Labour Market Characteristics
Labour Market – Port Lincoln/Ceduna ESA
Labour Force Status
|
Mar-2011
|
Dec-2011
|
Mar-2012
|
Unemployed
|
781
|
753
|
716
|
Unemployment Rate
|
4.3%
|
4.0%
|
3.8%
|
Labour Force
|
18,035
|
18,781
|
18,991
|
Source: DEEWR Small Area Labour Markets
Indigenous Labour Force Data
Labour Force Status
|
Port Lincoln/Ceduna ESA
|
All ESAs
|
Employed*
|
508
|
6540
|
Unemployed
|
67
|
1236
|
Labour Force
|
575
|
7776
|
Unemployment Rate
|
11.7%
|
15.9%
|
Participation Rate
|
51.4%
|
51.0%
|
Source: ABS 2006 Census
* Includes CDEP participants
Job Seeker Profile (March 2012) |
Pt Lincoln/Ceduna
|
Adelaide LMR
|
SA Country LMR
|
Job Seekers
|
1,759
|
44,344
|
19,474
|
Average Job Seeker Age
|
36
|
36
|
37
|
Average Job Seeker Unemployment Duration (mths)
|
34
|
27
|
32
|
Source: DEEWR Labour Market Information Portal
Centrelink Working Age Customer Population (includes CDEP & customers on zero allowances)
Payment Type
|
DSP
|
NSA
|
PPP
|
PPS
|
YLO
|
Mar 2011
|
1,442
|
1,323
|
223
|
566
|
254
|
Dec 2011
|
1,471
|
1,220
|
205
|
565
|
241
|
Mar 2012
|
1,465
|
1,216
|
200
|
578
|
223
|
Based on concordance of postcodes to ESAs.
(DSP = Disability Support Pension; NSA = Newstart Allowance; PPP = Parenting Payment Partnered; PPS = Parenting Payment Single; YLO = Youth Allowance Other)
Map of Unemployment Rates by Statistical Local Area (SLA) – Port Lincoln/Ceduna ESA
Source: DEEWR Small Area Labour Markets data – March quarter 2012
Employment by Industry and Occupation
Number of Businesses by Industry Division by Employment Size Ranges
Industry Division
|
Non Employing
|
Employ 1-4
|
Employ 5-19
|
Employ 20-49
|
Employ 50-99
|
Employ 100-199
|
Employ 200+
|
Total Business Counts
|
Agriculture, Forestry and Fishing
|
974
|
479
|
420
|
18
|
3
|
3
|
3
|
1900
|
Mining
|
9
|
3
|
0
|
3
|
0
|
0
|
0
|
15
|
Manufacturing
|
78
|
42
|
36
|
9
|
9
|
0
|
0
|
174
|
Electricity, Gas, Water and Waste Services
|
6
|
0
|
3
|
0
|
0
|
0
|
0
|
9
|
Construction
|
328
|
138
|
60
|
9
|
0
|
0
|
0
|
535
|
Wholesale Trade
|
51
|
18
|
12
|
0
|
0
|
0
|
0
|
81
|
Retail Trade
|
102
|
81
|
87
|
30
|
6
|
0
|
0
|
306
|
Accommodation and Food Services
|
42
|
27
|
36
|
12
|
0
|
6
|
0
|
123
|
Transport, Postal and Warehousing
|
122
|
45
|
12
|
3
|
0
|
0
|
0
|
182
|
Information Media and Telecommunications
|
12
|
0
|
0
|
0
|
0
|
0
|
0
|
12
|
Financial and Insurance Services
|
168
|
30
|
18
|
3
|
0
|
0
|
0
|
219
|
Rental, Hiring and Real Estate Services
|
289
|
24
|
18
|
3
|
0
|
0
|
0
|
334
|
Professional, Scientific and Technical Services
|
78
|
30
|
18
|
0
|
0
|
0
|
0
|
126
|
Administrative and Support Services
|
54
|
15
|
21
|
3
|
3
|
0
|
0
|
96
|
Public Administration and Safety
|
3
|
3
|
3
|
0
|
0
|
0
|
0
|
9
|
Education and Training
|
9
|
6
|
3
|
0
|
0
|
0
|
0
|
18
|
Health Care and Social Assistance
|
40
|
21
|
21
|
3
|
0
|
0
|
0
|
85
|
Arts and Recreation Services
|
12
|
0
|
0
|
0
|
0
|
0
|
0
|
12
|
Other Services
|
78
|
66
|
24
|
0
|
0
|
0
|
0
|
168
|
Not Classified*
|
48
|
6
|
0
|
0
|
0
|
0
|
0
|
54
|
Total
|
2503
|
1034
|
792
|
96
|
21
|
9
|
3
|
4458
|
Source: ABS Cat 8165.0, Counts of Australian Businesses by Statistical Local Areas by Employment Size Ranges , June 2009
*This category contains businesses which have not been coded to an industry.
Explanatory notes:
-
Counts of businesses are derived from the ABS Business Register (ABSBR). The ABSBR comprises businesses which are actively trading in the Australian economy.
-
Counts exclude the General Government Institutional Sector. Counts in the three industry sectors of Public Administration and Safety; Education and Training; and Health Care and Social Assistance include private sector activity only.
-
For businesses operating in more than one State or Territory, only the main state business address is included.
-
In some examples, the main state is determined by the State or Territory with the highest employment.
Economic Developments
Value of Building Approvals ($ ‘000)
Building Type
|
12 Months to April 2011
|
12 Months to April 2012
|
Residential
|
$54,078
|
$50,051
|
Non-Residential
|
$19,178
|
$25,617
|
Total Buildings
|
$73,256
|
$75,668
|
Source: SA LEO estimates based on SA Building Approvals by SLAs, ABS Cat. No. 8731.0 (Datacube)
Recent Industry Developments – Port Lincoln/Ceduna
-
Proposed new South Australian marine park sanctuary zones will impact on the local fishing industry, with up to 117 direct jobs being lost across the state. The SA Government will provide financial compensation to displaced fishers, including those in both the northern and southern rock lobster zones. (Port Lincoln Times, 31 May 2012)
-
Centrex Metals has increased its estimation of the amount of iron ore at its Bungalow Magnetite Project near Cowell by 230 per cent. The estimated grade of the product is also high. The Bungalow prefeasibility study is due for completion late this year, with ore to be shipped to the market via Port Spencer. (Port Lincoln Times, 29 May 2012)
-
Clean Seas Tuna expects to post a $17.5 million loss this financial year due to a drop in yellowtail kingfish production, caused by unusually high mortality rates. The company has halted fingerling production of yellowtail kingfish at its Arno Bay facility, pending a scientific solution to the problem. An unknown number of staff will be made redundant as a result. (Port Lincoln Times, 29 May 2012)
-
Despite recent softness in demand and prices for its products, Iluka Resources hopes to increase the Jacinth-Ambrosia operation from a current expected life of ten years, to around 20. The company has four deposits in the Eucla basin which have the potential to significantly extend the economic life of the Jacinth-Ambrosia facility. (The Advertiser, 24 May 2012)
-
Up to 12 people will be employed to operate new security equipment at the Port Lincoln Airport. Security firm ISS Facility Services is working with Complete Personnel to recruit staff for a 1 July commencement date. The airport has recently undergone a significant upgrade, including new terminal facilities. (Port Lincoln Times, 17 May 2012)
-
Iluka Resources will cut production of zircon due to falling global demand. Total zircon production across all of Iluka’s Australian mines, including the Jacinth-Ambrosia operation near Ceduna, will reduce from 500,000 tonnes to 430,000 tonnes in 2012. (The Advertiser, 9 May 2012)
-
Centrex Metals has launched a $45 million definitive feasibility study for its Fusion iron ore project and proposed bulk commodities port at Port Spencer. It is estimated the Fusion mine – near Koppio – will have a production capacity of between 5-10 million tonnes of magnetite concentrate per year, and require capital investment of between $1.7 billion and $2.6 billion. (Port Lincoln Times, 8 May 2012)
-
IronClad Mining will begin construction of its Lucky Bay export terminal next month. Meanwhile, work at the Wilcherry Hill iron mine, near Kimba, is progressing – the workers’ camp is ready, work on the processing facility has begun and the company expects the first ore to be exported in September/October 2012. (The Advertiser, 1 May 2012)
-
Proposed new marine park sanctuary zones are expected to reduce the SA Northern Zone Rock Lobster catch by around 55 tonnes per annum (out of a total quota of 310 tonnes per annum). The reduction could potentially result in a loss of $18 million in earnings and 8-10 fewer fishing boats from the current fleet of 45. There would be associated losses in employment in the region. (Port Lincoln Times, 1 May 2012)
-
IronClad Mining has received State Government approval to construct new port facilities at Lucky Bay near Cowell. The port will be used to export ore from IronClad’s Wilcherry Hill mine on Eyre Peninsula. (Port Lincoln Times, 19 April 2012)
-
The mine life at Iluka Resources’ Jacinth Ambrosia project could be extended by up to ten years by recent discoveries. A new deposit containing 2.2 million tonnes of heavy mineral sands has been identified 9km from the current JA mine. (The Advertiser, 18 April 2012)
-
Centrex Metals is anticipating that around 75 per cent of its mine and Port Spencer workforce will eventually live permanently in the area once operations are established. The remaining 25 per cent of the workforce will be fly in, fly out (FIFO). (Port Lincoln Times, 12 April 2012)
-
Pre-production drilling has commenced at IronClad Mining’s Wilcherry Hill iron ore project near Kimba. (Port Lincoln Times, 20 March 2012)
-
The first stage of Centrex Metals’ proposed deep water bulk commodities export facility at Port Spencer will require an estimated spend of $250 million. Stage one includes detailed design and construction of the jetty and materials handling systems, plus extensive site works. The facility will allow for the export of hematite iron ore and grain. Centrex is aiming to commence exports from Port Spencer by early 2015. The SA Government is yet to approve the project. (Whyalla News, 13 March 2012)
-
Construction work on a new $8.9 million fish unloading facility at Thevenard could begin in September, subject to available funding. The SA Government has committed $1.5 million to the project through the Regional Development Infrastructure Fund. Commonwealth funds of around $4 million are also being sought to enable the project to become viable. The project will generate work for around 170 construction workers. (West Coast Sentinel, 1 March 2012)
-
Mungana Goldmines hopes to turn the Tunkillia gold deposit near Ceduna into a mine within two years after buying it from Minotaur Exploration. An open-cut mine would cost $80 million to develop and would produce around 80,000 ounces of gold per annum for seven years. (The Advertiser, SA Business Journal, 28 February 2012)
-
The Eyre Peninsula Mining Alliance will hold mining careers expos at various locations across the region during March. Sessions will be run for both school students and the general public, providing information on jobs and careers in upcoming local mining projects. (Port Lincoln Times, 23 February 2012)
-
Centrex Metals’ proposed deep-water port at Port Spencer will soon enter the public consultation phase. A draft Public Environmental Report has been submitted to the SA Government, and a final version of the report is now being prepared for public scrutiny. (The Advertiser, SA Business Journal, 14 February 2012)
-
Production of graphite at the Uley mine, south of Port Lincoln, is due to commence early this year. MEGA Graphite Australia will advertise this month for a broad range of people to work on the project. (Port Lincoln Times, 10 January 2012)
-
Ironclad Mining expects infrastructure work at its Wilcherry Hill mine on Eyre Peninsula to start later this month, with the first ore produced in the March quarter. Employment of local people is a particular focus for the company. (The Advertiser, 4 January 2012)
-
The proposed $150 million Ceduna Keys marina and community centre development has been given major project status. Developers have two years to begin the project, although land ownership issues remain unresolved. Once completed, the development is expected to create more than 100 jobs in Ceduna. (West Coast Sentinel, 15 December 2011)
-
Mineral sands producer Iluka Resources has secured price increases of more than 80 per cent for some of its key products due to strong global demand. The company is the world’s largest producer of rutile and zircon, with both minerals used in various building materials, such as paint pigments and ceramic tiles. (The Advertiser, 9 December 2011)
-
Residential land developments at Tumby Bay and Port Neill have been delayed due to the current economic climate affecting real estate. However, developer Gemtree expects both projects to go ahead in 2012. (Port Lincoln Times, 17 November 2011)
-
Plans are being drawn-up to relocate Port Lincoln’s fishing fleet to a new facility in Proper Bay. The project involves a $100 million redevelopment of the existing Proper Bay wharf as well as establishing an industry park on adjacent land. The developer behind the project – Port Lincoln Proper – will commence discussions with interested parties this month. (Port Lincoln Times, 3 November 2011)
-
Grain exporter Viterra shipped 2.65 million tonnes of grain from Port Lincoln between October 1, 2010 and September 30, 2011, a new record for the company. (Port Lincoln Times, 3 November 2011)
-
Centrex Metals has nominated its Fusion Project as the company’s first large-scale magnetite iron ore mine on the Eyre Peninsula. The project is part of the Eyre Iron joint venture with Chinese company WISCO, and is currently undergoing feasibility studies. The mine would be located approximately 40 km from Centrex’s proposed Port Spencer deep-water port north of Tumby Bay. (The Advertiser, 3 November 2011)
-
A new supermarket and two additional retail spaces will be constructed on the corner of Porter and Liverpool Streets in Port Lincoln. T&S Freehold Pty Ltd is behind the 2570 sq m project, with construction expected to start in about two weeks. (Port Lincoln Times, 25 October 2011)
-
Adelaide Resources has commenced a drilling program searching for uranium deposits on the Eyre Peninsula. The company has formed a joint venture with Quasar Resources Pty Ltd – known as the Corrobinnie Uranium Joint Venture (CUJV) – to explore a number of priority targets. (Whyalla News, 20 October 2011)
-
The southern bluefin tuna quota will be increased by 32 per cent over the next three years. The decision was announced by the Commission for the Conservation for Southern Bluefin Tuna at a meeting in Bali this month. The increase effectively reverses the 1500-tonne quota cut introduced in 2009. (Port Lincoln Times, 18 October 2011)
-
Ironclad Mining has been granted a mining lease for its Wilcherry Hill iron ore project on the Eyre Peninsula. The first ore shipments to China are expected to occur in the first quarter of 2012. The company recently completed work on an accommodation village at Kimba for 40 workers, but this could be expanded to 80. (Port Lincoln Times, 18 October 2011)
-
Centrex Metals has almost doubled the size of its magnetite iron resource estimates on the Eyre Peninsula, from 320 million tonnes to around 614 million tonnes. The estimates cover various tenements, including the company’s Fusion and Carrow projects. (Port Lincoln Times, 29 September 2011)
-
A graphite mine at Sleaford, near Port Lincoln, is expected to become operational again after being closed since the 1990s. The mine’s operators – Mega Graphite Australia (MGA) and Strategic Energy Resources (SER) – expect to export the first product in late 2011 or early 2012. A number of management and operational staff will be required for the mine, with recruitment expected to occur soon. (Port Lincoln Times, 27 September 2011)
-
Centrex Metals’ proposed deepwater port north of Tumby Bay will be formally known as Port Spencer. This replaces the interim name of Sheep Hill, which reflected the closest land mark in the area identified on marine charts. Port Spencer will be a multi-user facility for the export of dry bulk commodities, including iron ore and grain. Parsons Brinckerhoff has completed a design feasibility study for the port infrastructure. (Port Lincoln Times, 20 September 2011)
-
BP Australia has received regulatory approval to begin under-sea seismic surveys for petroleum in an area 350 km southwest of Ceduna. Survey work is expected to commence in November 2011. (The Advertiser, 16 September 2011)
-
A $13.2 million upgrade of the Port Lincoln airport is scheduled to start at the end of the year. The Federal Government has contributed $4.5 million from its Regional Development Fund. The project includes a new carpark, taxiway and apron, airport terminal, and passenger/baggage screening facilities. (The Advertiser, 15 September 2011)
-
Lincoln Minerals says it’s Gum Flat mine will inject $20 million per annum into the local economy, via demand for labour and transport services, and indirectly through retail and hospitality spending. The company expects to employ around 150 people for the mine’s first two stages of development. (Port Lincoln Times, 1 September 2011)
-
Local oyster farms are experiencing strong demand from Japan as a result of significant damage to the Japanese oyster industry, arising from the March 2011 tsunami. Oyster farms in Coffin Bay, Streaky Bay, Smoky Bay, Ceduna, Haslam and Franklin Harbour have recorded increased export sales. (Port Lincoln Times, 1 September 2011)
-
Minerals explorer Lincoln Minerals hopes to be exporting iron ore from its Gum Flat tenement, 20 kms from Port Lincoln, within twelve months. The company will lodge a mining lease application with PIRSA this month. Around 500,000 tonnes of hematite ore will be exported via Port Lincoln each year. (Port Lincoln Times, 18 August 2011)
-
The Southern Bluefin Tuna annual catch quota could be reinstated within the next few months. The quota was cut from 5265 tonnes to 4016 tonnes in 2009 because tuna stocks were thought to be dangerously low. However, new scientific data show tuna stocks are much higher than previously calculated. The Commission for the Conservation of Southern Bluefin Tuna will meet in October to discuss quota limits. (The Advertiser, 3 August 2011)
-
Centrex Metals has received State Government approval for its iron ore mine at Wilgerup near Lock. However, mining won’t commence until after construction of a new deep-water bulk commodities port at Sheep Hill, which the company expects to complete in late 2014. The company had originally intended to export iron ore from Wilgerup via Port Lincoln but has abandoned this idea. (Port Lincoln Times, 2 August 2011)
-
The northern zone rock lobster Total Allowable Commercial Catch (TACC) will remain at 310 tonnes for the 2011-12 season. The TACC was lowered in 2009-10 to protect lobster stocks and promote stock rebuilding. (Port Lincoln Times, 21 July 2011)
-
Adelaide-based Bight Petroleum has been granted two oil exploration permits covering 8500sq km off the coast near Ceduna. The company will spend $68 million on the program over the next three years. (The Advertiser, 9 July 2011)
Miscellaneous
Commonwealth Electoral Divisions |
Grey (part)
|
Rowan Ramsey
|
LIB
| State Electoral Districts |
Flinders
|
Peter Treloar
|
LIB
|
Giles (part)
|
Lyn Breuer
|
ALP
|
Sources: Parliament of South Australia and Australian Electoral Commission
Postcodes and Localities – Port Lincoln/Ceduna ESA
Postcode
|
Localities
|
5602
|
Cowell
|
5603
|
Arno Bay, Wharminda
|
5604
|
Port Neill
|
5605
|
Butler Tanks, Tumby Bay
|
5606
|
Port Lincoln
|
5607
|
Coffin Bay, Coulta, Karkoo, Lipson, Louth Bay, Mount Hope, Murdinga, North Shields, Sheringa, Tooligie, Ungarra, Venus Bay, Wangary, Wanilla, Warrachie, Warrow
|
5630
|
Edillilie
|
5631
|
Cockaleechie, Cummins
|
5632
|
Kapinnie, Yeelanna
|
5633
|
Lock
|
5640
|
Cleve
|
5641
|
Buckleboo, Kimba
|
5642
|
Darke Peak, Kielpa, Rudall
|
5650
|
Cootra, Koongawa, Warramboo
|
5651
|
Kyancutta
|
5652
|
Wudinna
|
5653
|
Yaninee
|
5654
|
Minnipa, Mount Damper
|
5655
|
Poochera
|
5660
|
Cungena
|
5661
|
Wirrulla
|
5670
|
Elliston, Mount Wedge
|
5671
|
Calca, Port Kenny
|
5680
|
Chandada, Haslam, Mudamuckla, Nunjikompita, Smoky Bay, Streaky Bay
|
5690
|
Ceduna, Coorabie, Koonibba, Penong, Thevenard, Yalata
|