Sbd works (ncb)


Nonconformities and Omissions



Yüklə 1,7 Mb.
səhifə22/140
tarix20.05.2023
ölçüsü1,7 Mb.
#127287
1   ...   18   19   20   21   22   23   24   25   ...   140
1 FOR PRINT UNION BID DOC

Nonconformities and Omissions

          1. Provided that a Bid is substantially responsive, the Public Body may waive any non-conformity or omissions in the Bid that does not constitute a material deviation.
          1. Provided that a Bid is substantially responsive, the Public Body may request that the Bidder submit the necessary information or documentation, within a reasonable period of time, to rectify nonmaterial nonconformities or omissions in the Bid related to documentation requirements. Requesting information or documentation on such nonconformities shall not be related to any aspect of the price of the Bid. Failure of the Bidder to comply with the request may result in the rejection of its Bid.
          1. Provided that a Bid is substantially responsive, the Public Body shall rectify nonmaterial nonconformities or omissions. To this effect, the Bid Price shall be adjusted, for comparison purposes only, by the highest price quoted in this bidding process to reflect the price of the missing or non-conforming item or component.
        1. Dubious price quotations and errors in calculation

          1. Provided that the Bid is substantially responsive, the Public Body shall correct arithmetical errors on the following basis:
(a)If there is a discrepancy between the unit price and the total price that is obtained by multiplying the unit price and quantity, the unit price shall prevail and the total price shall be corrected, unless in the opinion of the Public Body there is an obvious misplacement of the decimal point in the unit price, in which case the total price as quoted shall govern and the unit price shall be corrected;
(b)If there is an error in a total corresponding to the addition or subtraction of subtotals, the subtotals shall prevail and the total shall be corrected; and
(c)If there is a discrepancy between words and figures, the amount in words shall prevail, unless the amount expressed in words is related to an arithmetic error, in which case the amount in figures shall prevail subject to (a) and (b) above.
          1. The Public Body shall correct the detected errors in calculation and notify the Bidder in writing of the corrections made without any delay, requesting the Bidder to confirm that he accepts the correction of the calculation error within the period specified in BDS from the date on which the notice was received. The corrections shall be clearly indicated in the Bid.
          1. If the Bidder that submitted the lowest evaluated Bid does not accept the correction of errors, its Bid shall be disqualified.

Yüklə 1,7 Mb.

Dostları ilə paylaş:
1   ...   18   19   20   21   22   23   24   25   ...   140




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2025
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin