1 FOR PRINT UNION BID DOC

Rejection

          1. Components and materials which are not of the specified quality shall be rejected. A special mark may be applied to the rejected components or materials. This shall not be such as to alter them or affect their commercial value. Rejected components and materials shall be removed by the Contractor from the site within a period which the Engineer shall specify, failing which they shall be removed by the Engineer as of right at the expense and risk of the Contractor. Any work incorporating rejected components or materials shall be rejected.
          2. The Engineer shall, during the progress of the works and before the works are taken over, have the power to order or decide:
(mmmmmmmmmmm)the removal from the Site, within such time limits as may be specified in the order, of any components or materials which, in the opinion of the Engineer, are not in accordance with the contract;
(nnnnnnnnnnn)the substitution of proper and suitable components or materials; or
(ooooooooooo)the demolition and proper re-execution, or satisfactory repair, notwithstanding any previous test thereof or interim payment therefore, of any work which, in respect of components, materials, workmanship or design by the Contractor for which he is responsible, is not, in the opinion of the Engineer, in accordance with the Contract.
          1. The Engineer shall, as soon as reasonably practicable, give to the Contractor notice in writing of his decision specifying particulars of the alleged defects.
          2. The Contractor shall with all speed and at his expense make good the defects so specified. If the Contractor does not comply with such order, the Public Body shall be entitled to employ other persons to carry out the same and all expenses consequent thereon or incidental thereto may be deducted by the Public Body from any monies due or which may become due to the Contractor.
          3. The provisions of this GCC Clause shall not affect the right of the Public Body to claim under GCC Clauses 19 and 78.

Yüklə 1,7 Mb.

Dostları ilə paylaş:
1   ...   118   119   120   121   122   123   124   125   ...   140




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2025
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin