Upon the expiry of the Defects Liability Period, or where there is more than one such period, upon the expiry of the latest period, and when all defects or damage have been rectified, the Engineer shall issue to the Contractor a Final Acceptance Certificate and a copy thereof to the Public Body stating the date on which the Contractor completed his obligations under the Contract to the Engineer's satisfaction. The Final Acceptance Certificate shall be given by the Engineer within 30 days after the expiration of the above stated period, or as soon as any works ordered under GCC Clause 88 have been completed to the satisfaction of the Engineer. The works shall not be considered as completed until the Final Acceptance Certificate has been signed by the Engineer and delivered to the Public Body, with a copy to the Contractor. Notwithstanding the issue of the Final Acceptance Certificate, the Contractor and the Public Body shall remain liable for the fulfillment of any obligation incurred under the contract prior to the issue of the Final Acceptance Certificate, which remains unperformed at the time such Final Acceptance Certificate is issued. The nature and extent of any such obligation shall be determined by reference to the provisions of the contract. |
Special Conditions of Contract
Table of Clauses
Part 3General Provisions 1
Part 4The Contract 1
Part 5Obligations of the Public Body 4
Part 6Obligations of the Contractor 4
Part 7Payments to the Contractor 6
Part 8Performance of the Contract 8
Part 9Acceptance and Defects Liability 9
The following Special Conditions of Contract (SCC) shall supplement the General Conditions of Contract (GCC). Whenever there is a conflict, the provisions herein shall prevail over those in the GCC.
Dostları ilə paylaş: |