Sbd works (ncb)


The Contractor is responsible to remove all unnecessary materials from the site. [Specify who is to remove demolition materials if not the Contractor]



Yüklə 1,7 Mb.
səhifə132/140
tarix20.05.2023
ölçüsü1,7 Mb.
#127287
1   ...   128   129   130   131   132   133   134   135   ...   140
1 FOR PRINT UNION BID DOC

The Contractor is responsible to remove all unnecessary materials from the site. [Specify who is to remove demolition materials if not the Contractor]

GCC 52.5

[Specify if the design of particular temporary works is the responsibility of the Public Body]

GCC 53.1

[Specify, if necessary, the arrangements for soil studies]

GCC 55.1

[Specify whether there is a derogation from GCC Clause 55]

GCC 58.1

The amount of the Performance Security shall be: [indicate the amount of the Performance Security]

GCC 58.4

The types of acceptable Performance Securities are: [insert the name and description of Performance Security acceptable to the Public Body].
The currency shall be: [indicate currency of the Contract Security].

GCC 58.8

Discharge of the Performance Security shall take place: [insert (a) in accordance with GCC Sub-Clause 58.8; or (b) indicate how the Performance Security shall be discharged]



  1. Payments to the Contractor

GCC 59.1

All payment to the Contractor under this Contract shall be made in [insert currency].Ethiopian birr

GCC 60.1

Advance payment [insert “shall be” or “shall not be”] granted to the Contractor, at his request.


Yüklə 1,7 Mb.

Dostları ilə paylaş:
1   ...   128   129   130   131   132   133   134   135   ...   140




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2025
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin