The Scope of Works shall be defined in: CONSTRUCTION OF DIARY FARM. refer the bill of quantity and specification [insert “Section 6, Schedule of Requirements” or indicate where the Scope of Works shall be defined]
GCC 70.2
The Contractor shall carry out the Works at following Sites: [list sites].HARAMAYA woreda Sites are located at [insert location]and are defined in Drawings No. [insert Drawings No.].