GCC 79.2
|
The technical rules for drawing up the statements shall be: [Specify the technical rules for drawing up the statements]
|
GCC 80.2
|
The works, components, equipment and materials used in their construction must comply with:
Specification for Building Works 2014, ERA standard 2013 and Bill of Quantities (ssssssssssss)The requirements of [Specify the technical document(s) containing these requirements] |
GCC 80.3
|
[Specify whether preliminary technical acceptance is necessary and the conditions governing its implementation]
|
GCC 81
|
[Specify the places to be inspected and tested in accordance with GCC Clause 81 and the practical arrangements for testing]
|
GCC 83.2
|
[Specify if the equipment, temporary structures, plant and materials on the Site belong to the Public Body under GCC Clause 81 and the legal instrument(s) used]
|
|
Acceptance and Defects Liability
|
GCC 86.3
|
[Specify whether the Defects Liability Period begins if this does not run from the date of partial acceptance]
|
GCC 87
|
[Specify detailed arrangements for provisional acceptance; if any]
|
GCC 88.6
|
[Specify if the defects liability work necessitated by normal wear and tear is to be carried out by the Contractor]
|
GCC 88.7
|
[Specify if the duration of the defects liability period is less than the maximum of 365 days. Specify any additional obligations under the warranty, e.g. commercial warranty]
|