FP7 Research Infrastructures

SEE-GRID-SCI

SEE-GRID eInfrastructure for regional eScience









SEE-GRID-SCI PSC-04 Meeting and Regional Environmental Science Workshop Minutes

Sofia, May 6-8, 2009



Author(s):

Ognjen Prnjat

Status –Version:

Final

Date:

May 20th, 2009

Distribution – Type:

Internal

Code:

SEEGRIDSCI-NA1-GR-Minutes-PSC04-a-2008-05-18

Abstract: This document provides the minutes for the SEE-GRID-SCI PSC04 meeting hosted by IPP-BAS and held in Sofia on May 6th- 8th, 2009.

 Copyright by the SEE-GRID-SCI Consortium



The SEE-GRID-SCI Consortium consists of:

GRNET

Coordinating Contractor

Greece

CERN

Contractor

Switzerland

IPP-BAS

Contractor

Bulgaria

ICI

Contractor

Romania

TUBITAK

Contractor

Turkey

SZTAKI

Contractor

Hungary

UPT

Contractor

Albania

UoBL

Contractor

Bosnia-Herzegovina

UKIM

Contractor

FYROM

UOB

Contractor

Serbia

UOM

Contractor

Montenegro

RENAM

Contractor

Moldova

RBI

Contractor

Croatia

IIAP-NAS-RA

Contractor

Armenia

GRENA

Contractor

Georgia

Document Revision History

Date

Issue

Author/Editor/Contributor

Summary of main changes

May 15, 2009

a

Ognjen Prnjat

Draft

May 18, 2009

a

Ognjen Prnjat

Final

Table of Contents

1. Introduction 3

2. Objectives 5

3. Meeting Agenda 6

4. Main points discussed during the meeting 8

5. Action points created at the meeting 11


1.Introduction


Meeting called by

GRNET

Type of meeting

PSC-04 meeting

Date – Time

May 6th-8th, 2009

Facilitator

IPP-BAS

Location

Vitosha Park Hotel, Sofia, Bulgaria

Attendees

1

Ognjen Prnjat

GRNET, Greece




2

Ioannis Liabotis

GRNET, Greece




3

Vassiliki Kotroni

National Observatory of Athens, Greece




4

Gabriel Neagu

National Institute for R&D in Informatics – ICI, Romania




5

Alexandru Stanciu

ICI, Romania




6

Bacu Victor

Technical University of Cluj-Napoca, Romania




7

Cevat Sener

METU, Turkey




8

Can Ozturan

Bogazici University, Turkey




9

Burcu Ortakaya

ULAKBIM, Turkey




10

Miklos Kozlovszky

MTA SZTAKI, Hungary




11

Danica Stojiljkovic

CERN, Switzerland




12

Mihajlo Savic

Elektrotehnicki fakultet Banja Luka, Bosnia and Herzegovina




13

Vladimir Slavnic

Institute of Physics Belgrade, Serbia




14

Branko Marovic

Belgrade University Computing Center, Serbia




15

Dusan Vudragovic

Institute of Physics Belgrade, Serbia




16

Luka Filipovic

University of Montenegro, Montenegro




17

Davor Davidovic

Rudjer Boskovic Institute, Croatia




18

Ramaz Kvatadze

GRENA, Georgia




19

Alexandr Golubev

RENAM Association, Moldova




20

Petru Bogatencov

RENAM Association, Moldova




21

Irina Borta

State Hidrometeorological Service, Moldova




22

Hrachya Astsatryan

IIAP of NAS RA, Armenia




23

Evis Trandafili

Politechnic University of Tirana, Albania




24

Neki Frasheri

Politechnic University of Tirana, Albania




25

Anastas Misev

UKIM, FYR of Macedonia




26

Margita Kon-Popovska

UKIM, FYR of Macedonia




27

Boro Jakimovski

UKIM, FYR of Macedonia




28


Kiril Boyanov

IPP-BAS, Bulgaria




29

Kosta Ganev

GPhI-BAS, Bulgaria




30

Maria Prodanova

GPhI-BAS, Bulgaria




31

Dimiter Syrakov

GPhI-BAS, Bulgaria




32

Todor Gurov

IPP-BAS, Bulgaria




33

Emanouil Atanassov

IPP-BAS, Bulgaria




34

Aneta Karaivanova

IPP-BAS, Bulgaria




35

Sofiya Ivanovska

IPP-BAS, Bulgaria




36

Dimitar Dimitrov

IPP-BAS, Bulgaria




37

Mariya Durchova

IPP-BAS, Bulgaria

Please read

All SEE-GRID-SCI Members


2.Objectives


ID

Description

Covered

O4.01

Review all-round project progress (All activities)



O4.02

Evaluate project baseline and adjust if needed the project workplan



O4.03

Present all Activities’ yearly progress in preparation for first review



O4.04

Assess NGI progress, reiterate EGI principles (NA2)



O4.05

Assess status of country-level training events; and other NA3 actions (NA3)



O4.06

VO progress: details (NA4)



O4.07

Detailed presentations regarding environmental VO developments by all partners involved. (NA4)



O4.08

Present initial version of the review demos of all 3 VOs (NA4)



O4.09

Assess status of EGEE-SEEGRID operational integration (SA1)



O4.10

JRA1 status and progress: operational tools and applications extensions (JRA1)



O4.11

Plan activities for next 3 months


3.Meeting Agenda




ID

Start time

Planned duration

Item description

Presenter

Desired outcome

Wednesday, May 6th, 2009




10:30




Arrival of attendees







4.01

11:00

10 min

PSC meeting start

Oprn, hosts

Acceptance of agenda, meeting objectives, main points to be addressed, announcement of participants. Logistics.

4.02

11:10

50 min

Technical execution plan overview and review goals

Iliab

Overview of main expectations of each Activity, and goals of meeting per Activity. Planning of review.

4.03

12:00

40 mins

NA1 review presentation and planning

Oprn

Measure NA1 progress, define future steps, establish actions




12:40

60 mins

Lunch







4.04

13:40

90 mins

SA1 review presentation and planning

DVud

Measure SA1 progress, define future steps, establish actions




15:10

30 min

Coffee







4.05

15:40

90 mins

JRA1 review presentation and planning

BMar

Measure JRA1 progress, define future steps, establish actions

4.06

17:10

50 mins

EGI philosophy, SSCs, and future of operations

OPrn

Understand vision of EGI and regional future




18:00




End day 1







Thursday, May 7th, 2008: Environmental Workshop




08:45




Arrival of attendees







4.07

09:00

60 mins

NA4 review presentation and planning

CSen

Measure N41 progress, define future steps, establish actions

4.08

10:00

60 mins

Environmental VO overview and planning

EAta

Report the work in the VO, future plans




11:00

30 min

Coffee







4.09

11:30

60 min

Environmental VO: review demonstration

EAta

Demonstration of environmental VO and the related JRA1 tool




12:30

60 min

Lunch







4.10

13:30

40 min

Bulgaria: Environmental VO detailed presentations:







4.11

14:10

20 min

Albania: Environmental VO detailed presentation







4.12

14:30

20 min

Croatia: suggested replacement for geomagnetism










14:50

30 min

Coffee







4.13

15:20

40 min

Romania: Environmental VO detailed presentation







4.14

16:00

20 min

Hungary: Environmental VO detailed presentation







4.15

16:20

20 min

Moldova: Environmental VO detailed presentation










16:20




End day 2 and excursion and dinner







Friday, May 8th, 2009




09:15




Arrival of attendees







4.16

09:30

60 min

Seismo VO planning and review demo

Cozt

Report the work in the VO, future plans

4.17

10:30

60 min

Meteo VO planning and review demo

VKot

Report the work in the VO, future plans




11:30

30 min

Coffee







4.18

12:00

60 mins

NA3 planning

MKol

Measure NA3 progress, define future steps, establish actions




13:00

60 min

Lunch







4.19

14:00

90 min

NA2 review presentation and planning

Gnea

Measure NA2 progress, define future steps, establish actions




15:30

30 min

Coffee







4.20

16:00

30 mins

Technical execution plan overview

Iliab

Wrap up and actions until next PSC




16:30




Meeting end









4.Main points discussed during the meeting


The specific topics covered and issues addressed/resolved during the meeting are presented in the following paragraphs grouped per project Activity. The action points that were generated can be found in the next section.

  • NA1: Technical Execution plan – opening and closing presentations – were given by Ioannis, laying out the main aims of PSC, summing up work aims and progress per activity; and main future actions per Activity respectively. NA1 presentation was given by Ognjen, with objectives, activities, milestones and deliverables overview – as for review. It was agreed that next meeting will be in Dubrovnik during week 7-11 September, and Karolj and Davor will inform the consortium ASAP. PSC06 will be held together with User Forum and Regional User Training in Istanbul – a full week 30Nov – 4Dec. PSC07 might be held in Zabljak in early 2010 and Luka and Bozo will investigate. It was agreed that VOs will continue to use EVO. Status of MoUs was reiterated (5 signed so far), and it was underlined that Activity Leaders should pursue actions as within MoUs. It was concluded that EAB is not needed and will not be formed. The necessity for contract amendment due to change of geomagnetism application will be investigated. It was pointed out that the quarterly report is in its near-final version, and different aspects of resource consumption have been analyzed – overall the project is on track. It was underlined that budget distribution will be carried out sometime in Q7, and also that travel costs are lower than expected and partners are invited to publish scientific work stemming for the project activities at conferences. It was agreed that the following issues will be underlined in the final report: delays in Moldova, overall problems in Albania, various small technical problems. Regarding deviations from workplan, only geomagnetism application change will be underlined. It was again stressed that contributions for all deliverables keep being late, that partners are fully responsible, and that deadlines must be followed because this is basic fairness and respect towards colleagues that partners collaborate with. Budget cuts will be implemented due to delays in previous and following quarters if partners cannot follow this basic rule. Ognjen also elaborated on future plans for EGI project, to be submitted to a call in November 2009. The project will bring together all NGIs from Europe, and NGI funding will be proportional to the size of the NGI in terms of CPUs and users, while applications funding will be through the Specialized Support Centers. Thus, all countries should strive to stabilize completely their NGIs, as well as to lobby for membership in European-wide SSCs. Ioannis presented different functional model for regional operations for the NGI era. It was decided that some level of regional operations will be kept and that some services will be ran on behalf of some partners – there was no objections. The idea of SEEGRID SSC was mentioned. Acad Boyanov brought forward the idea of the MoU on the regional level and it was agreed that Ognjen will investigate this.

  • NA2 leader has given the presentation as for review, with objectives, tasks, deliverables and milestones status. Metrics set was presented, as well as the associated monitoring approach. DNA2.3a results were presented in detail. Specifically, EGI metrics were analyzed and suggestions to partners were provided. Following this, progress per country was given, with recommendations by the NA2 leader: all countries should consult the NA2 presentation recommendations. AL, BA and MK should still send a Letter of Support to EGI-DS. All NGI representatives should study the NGI requirements for EGI membership and take relevant actions and attend the EGI PB meetings and also monitor SSC developments.

  • NA3 leader gave the presentation as for first review, with objectives, deliverables & milestones, and activities with detailed achievements per activity. A number of suggestions were made regarding the review presentation, specifically the graphs, and Miklos will take these into account. The action point status was revisited. The ISGTW publication plan was presented and agreed at the PSC level – average of 1-2 submissions a month – but this could depend on ISGTW and its backlog – Miklos should inform ISGTW. Upcoming dissemination event opportunities were discussed and partners were suggested to submit their work. The SEEGRIDSCI User Forum was discussed in detail – Miklos and ULAKBIM will drive the organization. A set of actions was defined related to this, including investigation of possibility of publication of proceedings. It was reiterated that in the second year we would expect to see similar amount of disseminations and training as in first year, to which the PSC agreed. Related to this, 2nd year training and dissemination plans should be put together by all partners. Online training materials have to be strengthened. Overall, it was concluded that a wider dissemination campaign is needed, and that this should be driven more strongly by NA3 leader.

  • NA4 presentation was given almost as for review (mixed with some actions), and covered the objectives, tasks, deliverables and milestones. Application review process was reiterated, and needs to be enforced continuously. DNA4.2 overview was given, with detailed applications status per VO. It was identified that actual collaborations should be clearly explained. Most importantly, all applications should go into production immediately, and those with late deployment deadlines should be monitored closely by NA4 leader and VO leaders. The status of Al CHERS application is not good and effort has to be concentrated there, Romanian and Bulgarian colleagues will provide support. The new applications from BG and HR have been accepted in the meteo VO. Modis has to provide a report regarding its interaction with GreenView. Applications accounting was presented and discussed (per-application accounting will need to be implemented but will not be presented at review). Structure of ASG was reiterated. The need for VO EVO meetings was also underlined, as well as the necessity to circulate minutes after the meeting. The need for more active dissemination of applications was identified – application web pages must be made. Gridifcation guideline deliverable has been discussed in detail, and timeline for production was suggested and agreed. Brief status of collaborations with other projects was given and it was agreed that these will be followed specifically within VOs. Regarding the SEEGRIDSCI user forum, it was underlined that all applications must attend the forum, and collaborating projects will be invited. Metrics were presented, and they are on track, but number of users per application needs to be provided. Status of action points was presented and new actions were identified. NA4 leader underlined that progress of applications should be followed closely by the VO Leaders during the last year of the project, in which Application Review Process becomes more important. He also underlined that in case of a technical problem, ASG should be immediately contacted through HelpDesk + mailing lists announced. Also, other VO activities (workshops, trainings). The most important NA4 point is that the project objective is to engage strong regional communities in the selected research fields, and that thus NA4 developers should deploy their applications ASAP in production so as to attract collaborations. NA4 developers should also disseminate applications and results; reach out to wider communities; make sure rich material is on the webpages; and finally publish collaborative papers.

Meteorology VO overall presentation was given by V.Kotroni, as for review, presenting the scope and aims of the meteo VO. The detailed REFS and WRF deployment plans and progress were presented, where all targets are met. Action plans for year 2 were presented. Dissemination aspects of meteo VO were presented. WRF was confirmed as the review application (with output graph visualisations). Finally, meteo VO metrics were presented. The collaboration of meteo VO with JRA1 is not clear and their use of OT/AS needs to be clarified. Overall, the meteo VO review presentation should be shorter and review demo needs to be prepared.

Seismology VO review presentation was not prepared and only status progress was given. Dissemination activities were presented, as well as international cooperation activities – here cooperation with EIDA and ORFEUS has to be investigated and reported upon, including potential MoU. The status of data collection is not satisfactory - data collection is a crucial issue: at least countries collaborating as in DoW should provide (Albania, Armenia, Moldova); while we aim to work with as many countries as possible (GR, SR, RO, BG, BA, ME and HU). Status of applications was presented in detail: however, it was not clear what are the contributions of third parties to applications development, and VO leader must have an insight in this. Review demo was given and a number of things are still unclear – the demo has to be improved. Overall, seismology VO must be managed more tightly by Contractor-ULAKBIM, NA4 leader and VO leader.

Environmental VO workshop brought together representatives from Bulgaria, Romania, Moldova, Croatia, Albania and Hungary, who all presented their work. Environmental VO manager presented overall VO progress, with metrics reaching the targets, accounting details presented, as well as first scientific results. The support structure was presented. Following this, the detailed status of the applications was given. Again, work of 3rd parties in applications needs to be understood better by the VO leader. Specifically regarding applications: ROMS needs to find international collaborations, MD needs to increase involvement with BG applications, GENESI-DR collaboration has to be further evaluated, and EGEE-GENESI-DR MoU analysed for the issue of certificates and data access; Moldovan application deployment timeline to be provided ASAP. Demo application is satisfactory.

  • In SA1, the presentation was given as for review, with objectives and metrics; followed by tasks, milestones and deliverables. Infrastructure development was presented – with a convenient map which was decided will be used in all Activity presentations. This was followed by core services, CA deployment status, infrastructure expansion, infrastructure management and tools, details of operations, SLA principles and statistics, infrastructure usage, status of link to Moldova, and status of interoperations. Some suggestions have been made for the presentation and Dusan has noted them and will implement them. Regarding discrepancies in resources commitments, it was agreed that all countries will provide explanations to the SA1 leader. Status of action points was revised and there are still too many open action points pending for a long time. A set of new action points was defined, related to the review and beyond.

  • JRA1 presentation was not prepared as for review (only ToC was given), and only covered current work and plans; not very well structured. The status of deliverables and metrics was given, all are met. DJRA1.3 results were discussed, and the status of AS/OTs was given, as well as documentation guidelines. An ongoing issue with reporting was identified – it should be precise and on time. JRA1 wiki needs to be filled by all developers; and applications should use the applications services and operational tools. Next, JRA1 metrics were presented and it was suggested that they should start being used every 3 months. At review, JTS will be demoed with environmental VO, SDSAS with seismo VO, and it is still pending what will be demoed with meteo VO. A set of reccomendations and actions was identified by teh JRA1 leader and JRA1 developers should consult the JRA1 presentation and follow these. It was decided no detailed action points need to be kept per AS/OT, and that general actions are also not useful, this being development work. The upcoming plans were discussed, and then details of developments were given for just couple of AS/OTs, where others didn’t provide input, which is not acceptable.

5.Action points created at the meeting




ID

Activity

Description

Owner

Initiated

Due

169

NA1

Check contract amendment

Valia

08/05/09

30/06/09

170

NA1

Finalize Dubrovnik PSC05 organization

K. Skala

08/05/09

30/06/09

171

NA2

Finalise Istanbul PSC04 and UF organisation

ULAKBIM, Miklos

08/05/09

30/09/09

172

NA2

Investigate regional MoU

O. Prnjat

08/05/09

31/07/09

173

NA2

Consult the NA2 presentation recommendations and carry out related NGi improvements

All NGI reps

08/05/09

31/07/09

174

NA2

Upload NGI Q4 reports on the project site

All NGI reps

08/05/09

25/06/09

175

NA2

Reconsider the relevance of some NGI metrics (e.g. eIRG membership, local policy documents)

G. Neagu

08/05/09

31/07/09

176

NA2

Provide information about new EGI developments (events, documents and decisions), provide support to NGI representatives to cope with EGI developments

O. Prnjat, G. Neagu

08/05/09

30/10/09

177

NA2

Analyze status of LoI submission to EGI.org, including activation of funding support

G. Neagu

08/05/09

15/06/09

178

NA2

Stimulate the inclusion of eInfrastructure strategy within national IT strategy plans

All NGI reps

08/05/09

30/11/09

179

NA3

Install and configure a conference web portal

Burcu, Miklos

08/05/09

31/07/09

180

NA3

Advertise/Announce the User Forum

Miklos, Dimitra

08/05/09

15/09/09

181

NA3

Create & invite a scientific/evaluation board

Miklos

08/05/09

31/07/09

182

NA3

Review papers

Scientific board

08/05/09

31/10/09

183

NA3

Collect publication possibilities (with ISBN)

Miklos, Burcu, Aneta K.

08/05/09

30/06/09

184

NA3

Plan the training event in Turkey

Burcu, Can

08/05/09

30/09/09

185

NA3

Online training materials have to be strengthened

Miklos

08/05/09

31/07/09

186

NA3

Lightweight first line support training material

Emanouil

08/05/09

31/07/09

187

NA3

Website improvements to be carried out

Ioannis

08/05/09

30/06/09

188

NA3

Inform ISGTW about planned publication schedule

Miklos

08/05/09

31/05/09

189

NA3

2nd year training and dissemination plans should be put together by all partners

All partners

08/05/09

30/06/09

190

NA3

Everyone should publish papers

All partners

08/05/09

30/04/10

191

NA4

Romanian team support for CHERS

D. Gorgan, Florin Pop, Emanouil Neki

08/05/09

31/07/09

192

NA4

Report about MODIS integration with GreenView to be provided (is it a module or extension)

P. Bogatencov

08/05/09

25/05/09

193

NA4

Gridifcation Guideline ToC

D. Davidovic

08/05/09

30/06/09

194

NA4

VO leaders to analyze the status of international collaborations and keep track of details.

VO Leaders

08/05/09

25/05/09

195

NA4

Number of users per application and per VO needs to be provided, including graphs

C. Sener

08/05/09

22/05/09

196

NA4

Demos (together with JRA1 tool used) to be finalized

VO leaders, demonstartors

08/05/09

22/05/09

197

NA4

Progress of applications should be followed closely by the VO Leaders

VO leaders

08/05/09

Ongoing

198

NA4

VOMS group per application

C. Sener

08/05/09

31/07/09

199

NA4

Presentations are expected from CCIAQ and ROMS (prepared using the template) together with the input for SA1, JRA1, NA4 surveys)

E. Atanasov, D. Davidovic

08/05/09

15/07/09

200

NA4

Cooperation with EIDA and ORFEUS has to be investigated and reported upon.

C. Ortuzan

08/05/09

22/05/09

201

NA4

Seismo VO and NA4 leader clarify contributions of third parties to applications development,

C. Ortuzan

08/05/09

22/05/09

202

NA4

Seismo VO demo improvement

C. Ortuzan

08/05/09

22/05/09

203

NA4

Implement additional SDSAS methods as further needed by applications

C. Ortuzan

08/05/09

31/07/09

204

NA4

Study performance of file access

C. Ortuzan

08/05/09

31/07/09

205

NA4

Environmental VO and NA4 leader clarify contributions of third parties to applications development

Emanouil

08/05/09

22/05/09

206

NA4

Find collaborations for ROMS application

Davor

08/05/09

15/06/09

207

NA4

GENESI-DR collaboration has to be further evaluated, and EGEE-GENESI-DR MoU analyzed for the issue of certificates and data access

D. Gorgan

08/05/09

15/06/09

208

NA4

Moldovan application deployment timeline to be provided

P. Bogatencov

08/05/09

25/05/09

209

SA1

All countries that do not meet site number or CPU commitments to send reports to SA1 leader and PM explaining the situation and future plans

GIMs

08/05/09

25/05/09

210

SA1

All sites that do not appear to publish accounting to check the problem

GIMs

08/05/09

22/05/09

211

SA1

New accounting graphs will be produced for the review (Y1 graphs)

Emanouil

08/05/09

25/05/09

212

SA1

Helpdesk statistics to be produced and used as backup slides for review

Alex S.

08/05/09

22/05/09

213

SA1

Include results from monitoring of vo.ops.see-grid.eu to the CIC portal

Antun

08/05/09

15/06/09

214

SA1

Define logical DNS names for SA1 services

Antun

08/05/09

15/06/09

215

JRA1

Final decision on presentation of OT at review

Branko

08/05/09

22/05/09

216

JRA1

Provide up to date data for JRA1 metrics

JRA1 contractors

08/05/09

15/07/09

217

JRA1

Resolve licensing compatibility issues regarding licenses of components

Boro, Anastas, Davor

08/05/09

15/07/09

218

JRA1

Calculate and analyse JRA1 metrics

Branko

08/05/09

15/08/09

219

JRA1

MJRA1.3 report

IPP - Emanouil

08/05/09

01/09/09

220

JRA1

All AS beyond development stage at Y1 to implement, describe and provide installation packaging

JRA1 contractors

08/05/09

15/09/09

221

SA1

Deployment of additional core services for discipline VOs per country

Antun

18/05/09

15/09/09





Yüklə 286,3 Kb.

Dostları ilə paylaş:




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin