1.13Overall budget for the project (Forms A3.1 & A3.2 from CPFs)

A3.1 form:








A3.2 form





1.14Management level description of resources and budget.

The project budget is summarized in Table 9. The total labour costs are based on the person months as defined in the project effort form, section 8.1.


Table 9 Summary of project budget

Partner

Total labour1

Consumables

Durable Equipment

Protection of Knowledge

other costs

Travel + subsidence

Overheads

Total cost per partner

Funding requested

NTNU

266 640

30 000

14 000

-

-

18 000

62 128

390 768

390 768

CU

123 200

41 600

-

-

-

15 000

32 960

212 760

212 760

RWTH

170 000

12 000

-

-

-

12 000

36 400

230 400

230 400

IBET

95 745

54 000

10 000

-

-

15 000

31 949

206 694

206 694

INSA

110 484

40 000

20 000

-

-

15 000

34 097

219 581

219 581

UM II

100 440

40 000

15 000

-

-

15 000

31 088

201 528

201 528

DUT

95 418

40 000

18 000

-

-

15 000

30 684

199 101

199 101

EAWAG

94 600

32 000

15 000

-

-

15 000

28 320

184 920

184 920

UNITN

222 525

40 000

20 000

-

-

15 000

157 258

454 783

231 004

UTS 2

95 418

25 000

21 000

5 000

-

20 000

19 084

185 501

185 501

UKZN

41 400

12 000

10 000

-

-

12 000

12 680

88 080

88 080

Polymem

272 175

40 000

50 000

-

-

10 000

72 435

444 610

224 693

KMS

168 000

40 000

15 000

-

-

12 000

44 600

279 600

143 300

FlowConc

96 000

20 000

5 000

-

-

12 000

24 200

157 200

81 800

MILL

32 000

20 000

15 000

-

8 000

15 000

13 400

103 400

51 700

WHD

190 000

200 000

-

-

-

5 000

78 000

473 000

236 500

EV

72 800

20 000

-

-

-

15 000

18 560

126 360

63 180

IHE

50 000

3 600

-

-

-

3 600

10 720

67 920

33 960


1 Total labour is based on PMs from Efforts form (section 8.1)

2 UTS funds are supported by the Australian Government
For the AC model partners the PMs input is primarily allocated to Master Thesis student work, PhD fellowships and costs related to employing post-doc or researcher positions. For the FC/FCF partners the PMs the funds are to cover input by staff required to complete the tasks outlined in the project description. A breakdown of the budget allocations are shown in Table 10.
Table 10 Overview of project budget allocations

Partner

Budget allocations

NTNU

Personnel:

PhD fellowship / post-doc Research Officer (36 PM), project management staff (12 PM)



Consumables:

30.000 Chemical analysis costs (HPSEC, TOC, COD/FCOD, BOD, UV, PSD, Zeta pot., microscopy, MLSS/VMLSS, etc.) cleaning chemicals and operation additives



Durable equipment:

14.000 Modifications to existing pilot testing units and construction of new components/systems



CU

Personnel:

PhD fellowship (36 PM) and post-doc Researcher Officer (8 PM)



Consumables:

7.000 Fitting of side-stream modules

3.600 PC & data logging

4.000 Chemical fractionation method, biomass analysis

27.000 Chemical analysis costs (HPSEC, TOC, COD, BOD, UV etc.)


RWTH

Personnel:

Researcher (34 PM)



Consumables:

6.000 Membrane material Chemicals (Cleaning, Buffers, Organic Standards) HPLC-Column

6.000 Spare Parts and auxiliary material for lab and pilot scale plants


IBET

Personnel:

PhD fellowship (18 PM), post-doc Research Officer (21 PM)



Consumables:

54.000 Chemicals and other consumables for analysis (UV, GC, HPLC, Dionex, TOC, ICP), purchasing of molecular probes, acquirement of sensors (i.e. DO, pH etc.)



Durable equipment:

10.000 Purchase of electronic equipment for data acquisition and data processing



INSA

Personnel:

PhD fellowship (36 PM), post-doc Research Officer (8 PM)



Consumables:

14.000 PC & data logging & specific software for modelling

6.000 Membranes and modules

10.000 Spare parts and auxiliary material for lab scale plants and for the visualisation cell

10.000 Consumables and reactants for analysis

Durable equipment:

20.000 Modifications to existing pilot testing units and construction of new components/systems



UM II

Personnel:

PhD fellowship (36 PM) and post-doc Research Officer (4 PM)



Consumables:

40.000 Chemical analysis costs (DCO, N, PR, PS, gas, filters, membranes etc.)



Durable equipment:

15.000 Construction of a new pilot plant unit



DUT

Personnel:

PhD fellowships (38 PM)



Consumables:

30.000 Chemical analysis costs

10.000 Chemical costs for cleaning and operational tests

Durable equipment:

18.000 Modifications and building of filtration characterisation unit



EAWAG

Personnel:

Post-doc Research Officer (22 PM)



Consumables:

32.000 Chemical analysis and operating costs



Durable equipment:

15.000 Modifications to existing pilot testing units and construction of new components/systems



UNITN

Personnel:

Professor (6 PM), Associate Prof. (6 PM), Graduate Lab. technician (13 PM), Research Officers (12/24 PM)



Consumables:

40.000 Chemical analysis costs: (COD, UV, flow-cytometry etc.)



Durable equipment:

10.000 Modification to the large pilot scale installations (module replacement, piping rearrangement, etc.)

10.000 Electronic modifications and equipments


UTS

Personnel:

Masters thesis work, PhD fellowships, post-doc Research Officers



Consumables:

25.000 Chemical analysis costs: (TOC, MW distribution, endocrine disruptors, conventional water and sludge analysis), construction of membrane module samples



Durable equipment:

21.000 Construction of three lab-scale pilot plant units for testing



UKZN

Personnel:

Post-doc Research Officer, Masters student thesis work



Consumables:

12.000 Chemical analysis costs and pilot plant operating costs



Durable equipment:

10.000 Construction of pilot plant testing unit



Polymem

Personnel:

Engineers (40.5 PM), Technician (16.5 PM)



Consumables:

5.000 lab scale membranes modules

10.000 semi industrial modules for testing (pilot nr.1)

5.000 membrane modules for ageing tests (pilot nr.2)

15.000 full scale prototype modules for testing (pilot nr.3)

5.000 Chemical analysis costs: (COT, MEB, COD, BOD, UV, bacteria)



Durable equipment:

20.000 Construction of pilot nr.1 – MBR pilot plant for 5m3/d

10.000 Construction of ageing tests pilot plant

20.000 Construction of mobile filtration plant



KMS

Personnel:

Project Engineers (24 PM)



Consumables:

40.000 Manufacturing of membrane samples and modules



Durable equipment:

15.000 Construction of test units/pilot components



FlowConc

Personnel:

Project Engineer (15 PM)



Consumables / equipment:

25.000 Computer hardware and software, licences fees



MILL

Personnel:

Product Engineer (8 PM)



Consumables:

20.000 Construction of membranes and membrane modules



Durable equipment:

15.000 Construction of test units/pilots



WHD

Personnel:

Process operator (36 PM), Process Engineer (8 PM), Researcher/Project Manager (6 PM)



Consumables:

30.000 Operation for costs for operating and running the MBR pilot

170.000 Chemical and microbial analysis: (COD, BOD, N, P, heavy metals, micro pollutants, endocrine disrupting components, bacteria, viruses)


EV

Personnel:

Researcher, Engineer (15 PM)



Consumables:

6.000 PC and data acquisition system

14.000 Chemical analysis and operation costs


IHE

Personnel:

Post-doc Research Officer, Masters student thesis work



Consumables:

3.600 Chemical analysis costs: (LC-OCD)



There are two end-user representatives in the partner consortium, WDH and EV. These partners bring an added value to the project through access to existing treatment plants, large-scale pilot plants, and long term operation reference data of existing treatment plants. WHD is responsible for the Heenvliet wastewater treatment plant in the Netherlands. A pilot MBR with a capacity of 100 m3/h is currently under construction and will be used in this project. The pilot MBR can be operated in parallel to the existing plant with a capacity of 290 m3/h, but can also be operated in combination with the plant enabling a hybrid MBR combination. This option offers a very promising concept for upgrading of existing wastewater treatment plants. Operation of the pilot plant will make much information available to the project. A direct comparison can be made between the performance of the conventional wastewater treatment plants and MBRs. Several parameters will be monitored, like nutrient removal, removal of micro pollutants, removal of endocrine disrupting agents and disinfection. Also several operational parameters will be monitored and optimised, like energy consumption, membrane cleaning and general operational parameters. The joint knowledge from laboratory and pilot tests will result in the further development of the MBR concept. EV is responsible for several wastewater treatment plants of which two are MBR processes, the Rödingen MBR plant and the Nordkanal plant. This offers the unique opportunity of testing findings from the laboratory scale on full-scale systems.


The EUROMBRA partners include three membrane manufacturing companies, Polymen, KMS and MILL. The companies both manufacture membranes and construct membrane modules which opens a great potential for the project team to get access to membrane materials and modules at various stages of construction. The potential of testing new concepts and prototypes is also apparent depending on the progress of the research program outlined in this project. These partners will supply membrane modules and units to various levels of the activity in project.
The project consortium has further been strengthened by the participation of FlowConcept, a SME specializing in computation fluid dynamics (CFD). The CFD-modelling will strengthen the analysis and understanding of hydrodynamics both within the membrane modules themselves and in complete treatment process schemes.
The 12 remaining partners of the 18 partner consortium represent universities and/or research institutions. These partners either manage or have access to a variety of well equipped laboratories and research facilities with advanced analytical instruments and pilot plant units which will be made available to the project. The indirect costs requested in the budget are primarily related to operation and analysis costs for this equipment, building and/or adapting some of the testing units, supplementing equipment as needed for the defined tests to be undertaken.
Own resources made available to the project by AC model contractors. The contribution of person months (PMs) for the AC partners is shown in Table 11.
Table 11 Contribution of AC partners in personnel resources

Partip. No.

Participant short name

Resources

Personnel: Effort:



Amount

1

NTNU

T. Leiknes, Associate Professor 12 PMs

H. Ødegaard, Professor 3 PMs

L. Fiksdal, Professor 3 PMs

A. Grostad, Workshop Manager 4 PMs

G. Thorvaldsen, T. Hårberg, Laboratory Staff 6 PMs

Administration staff 4 PMs



120.000

30.000


30.000

23.200


34.800

23.200 Total: € 261.200



2

CU

Professor 4 PMs

Senior Researcher 2 PMs

Technical Staff 4 PMs

Administrators 2 PMs



68.746

22.097


29.462

19.642 Total: € 162.946



3

RWTH

T. Melin, Professor 3 PMs

S. Yüce, T. Wintgens, Senior Researcher 6 PMs

J. Bouge, Technical Staff 3 PMs

G. Spalding, Laboratory Staff 6 PMs


Total: € 90.000



4

IBET

M. Teresa Crespo 9 PMs

Fernanda Rodrigues 9 PMs



36.903

22.793 Total: € 59.696



5

INSA

C. Cabassud, Professor 6 PMs

C. Guigui, Assistant-professor 6 PMs

M. Spérandio, Assistant-professor 2 PMs

N. Clergerie, Technician 4 PMs

B. Reboul, Technician 4 PMs


38.256

27.312


9.104

8.437


8.437 Total: € 91.546

6

UM2

A. Grasmick, Professor 6 PMs

C. Wisnieski, Assistant-professor 4 PMs

M. Heran, Assistant-professor 4 PMs

R. Boilletot, Technician 4 PMs

Post-doc/PhD 6 PMs


38.256

18.208


18.208

8.437


16.800 Total: € 99.909

7

TU-Delft

J. van der Graaf, Professor 6 PMs

J. deKoning, Assistant-professor 6 PMs

A. van Nieuwenhuijzen, Assistant-professor 4 PMs

A. Schuit, Lab/Technician 4 PMs



43.648

30.032


20.021

16.875 Total: € 110.576



8

EAWAG

H. Siegrist, Professor 2 PMs

A. Joss, Scientist 6 PMs

K. Rottermann, Technician 5 PMs


28.000

60.000


40.000 Total: € 128.000

10

UTS*

S. Vigneswaran, Professor 5 PMs

H. H. Ngo, Dr. 2 PMs

H. Nguyen, Professor 1 PMs

A. Fane, Professor (UNSW) 1 PMs

P. Smith, Mr. 1 PMs

E. Laszlo, Research Assistant 6 PMs


Total: € 80.000



11

UKZN

C. Buckley, Professor 4 PMs

K. Foxon, Researcher 10 PMs

M. Guness, Technical Staff 12 PMs


15.625

13.540


7.500 Total: € 36.665







Sum person month contribution Total: € 1,120.508

* Activities of UTS are supported by the Australian Government

Contribution in laboratory facilities and equipment by AC partners are shown in Table 12:


Table 12 Contribution of AC partners in facilities and equipment resources

Partip. No.

Participant short name

Resources

Facilities / Equipment



Amount

1

NTNU

Pilot plants, laboratory equipment, analytical instruments

Total: € 100.000

2

CU

Pilot hall, equipment, laboratories, analytical instruments

Total: € 23.000

3

RWTH

MBR pilot plant, test modules, laboratory instruments

Total: € 200.000

4

IBET

Pilot plant, filtration unit, analysis instruments

Total: € 43.859

6

UM2

Laboratory, pilot plant, analytical instruments

Total: € 104.000

7

TU-Delft

Laboratory and equipment:

Total: € 12.500

8

EAWAG

Experimental apparatus – MBR pilot

Total: € 200.000

10

UTS*

Laboratory facilities, analysis, and equipment

Total: € 95.000

11

UKZN

Laboratory and equipment

Total: € 4.750







Sum facilities / equipment contribution Total: € 783.109

* Activities of UTS are supported by the Australian Government
The total in-kind contribution to the project by the AC cost partners based on person months and in-kind contribution is therefore estimated at € 1.903.617.



Yüklə 1,14 Mb.

Dostları ilə paylaş:
1   ...   7   8   9   10   11   12   13   14   15




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin