1.13Overall budget for the project (Forms A3.1 & A3.2 from CPFs)
A3.1 form:
A3.2 form
1.14Management level description of resources and budget.
The project budget is summarized in Table 9. The total labour costs are based on the person months as defined in the project effort form, section 8.1.
Table 9 Summary of project budget
Partner
|
Total labour1
|
Consumables
|
Durable Equipment
|
Protection of Knowledge
|
other costs
|
Travel + subsidence
|
Overheads
|
Total cost per partner
|
Funding requested
|
NTNU
|
266 640
|
30 000
|
14 000
|
-
|
-
|
18 000
|
62 128
|
390 768
|
390 768
|
CU
|
123 200
|
41 600
|
-
|
-
|
-
|
15 000
|
32 960
|
212 760
|
212 760
|
RWTH
|
170 000
|
12 000
|
-
|
-
|
-
|
12 000
|
36 400
|
230 400
|
230 400
|
IBET
|
95 745
|
54 000
|
10 000
|
-
|
-
|
15 000
|
31 949
|
206 694
|
206 694
|
INSA
|
110 484
|
40 000
|
20 000
|
-
|
-
|
15 000
|
34 097
|
219 581
|
219 581
|
UM II
|
100 440
|
40 000
|
15 000
|
-
|
-
|
15 000
|
31 088
|
201 528
|
201 528
|
DUT
|
95 418
|
40 000
|
18 000
|
-
|
-
|
15 000
|
30 684
|
199 101
|
199 101
|
EAWAG
|
94 600
|
32 000
|
15 000
|
-
|
-
|
15 000
|
28 320
|
184 920
|
184 920
|
UNITN
|
222 525
|
40 000
|
20 000
|
-
|
-
|
15 000
|
157 258
|
454 783
|
231 004
|
UTS 2
|
95 418
|
25 000
|
21 000
|
5 000
|
-
|
20 000
|
19 084
|
185 501
|
185 501
|
UKZN
|
41 400
|
12 000
|
10 000
|
-
|
-
|
12 000
|
12 680
|
88 080
|
88 080
|
Polymem
|
272 175
|
40 000
|
50 000
|
-
|
-
|
10 000
|
72 435
|
444 610
|
224 693
|
KMS
|
168 000
|
40 000
|
15 000
|
-
|
-
|
12 000
|
44 600
|
279 600
|
143 300
|
FlowConc
|
96 000
|
20 000
|
5 000
|
-
|
-
|
12 000
|
24 200
|
157 200
|
81 800
|
MILL
|
32 000
|
20 000
|
15 000
|
-
|
8 000
|
15 000
|
13 400
|
103 400
|
51 700
|
WHD
|
190 000
|
200 000
|
-
|
-
|
-
|
5 000
|
78 000
|
473 000
|
236 500
|
EV
|
72 800
|
20 000
|
-
|
-
|
-
|
15 000
|
18 560
|
126 360
|
63 180
|
IHE
|
50 000
|
3 600
|
-
|
-
|
-
|
3 600
|
10 720
|
67 920
|
33 960
|
1 Total labour is based on PMs from Efforts form (section 8.1)
2 UTS funds are supported by the Australian Government
For the AC model partners the PMs input is primarily allocated to Master Thesis student work, PhD fellowships and costs related to employing post-doc or researcher positions. For the FC/FCF partners the PMs the funds are to cover input by staff required to complete the tasks outlined in the project description. A breakdown of the budget allocations are shown in Table 10.
Table 10 Overview of project budget allocations
Partner
|
Budget allocations
|
NTNU
|
Personnel:
PhD fellowship / post-doc Research Officer (36 PM), project management staff (12 PM)
Consumables:
30.000 Chemical analysis costs (HPSEC, TOC, COD/FCOD, BOD, UV, PSD, Zeta pot., microscopy, MLSS/VMLSS, etc.) cleaning chemicals and operation additives
Durable equipment:
14.000 Modifications to existing pilot testing units and construction of new components/systems
|
CU
|
Personnel:
PhD fellowship (36 PM) and post-doc Researcher Officer (8 PM)
Consumables:
7.000 Fitting of side-stream modules
3.600 PC & data logging
4.000 Chemical fractionation method, biomass analysis
27.000 Chemical analysis costs (HPSEC, TOC, COD, BOD, UV etc.)
|
RWTH
|
Personnel:
Researcher (34 PM)
Consumables:
6.000 Membrane material Chemicals (Cleaning, Buffers, Organic Standards) HPLC-Column
6.000 Spare Parts and auxiliary material for lab and pilot scale plants
|
IBET
|
Personnel:
PhD fellowship (18 PM), post-doc Research Officer (21 PM)
Consumables:
54.000 Chemicals and other consumables for analysis (UV, GC, HPLC, Dionex, TOC, ICP), purchasing of molecular probes, acquirement of sensors (i.e. DO, pH etc.)
Durable equipment:
10.000 Purchase of electronic equipment for data acquisition and data processing
|
INSA
|
Personnel:
PhD fellowship (36 PM), post-doc Research Officer (8 PM)
Consumables:
14.000 PC & data logging & specific software for modelling
6.000 Membranes and modules
10.000 Spare parts and auxiliary material for lab scale plants and for the visualisation cell
10.000 Consumables and reactants for analysis
Durable equipment:
20.000 Modifications to existing pilot testing units and construction of new components/systems
|
UM II
|
Personnel:
PhD fellowship (36 PM) and post-doc Research Officer (4 PM)
Consumables:
40.000 Chemical analysis costs (DCO, N, PR, PS, gas, filters, membranes etc.)
Durable equipment:
15.000 Construction of a new pilot plant unit
|
DUT
|
Personnel:
PhD fellowships (38 PM)
Consumables:
30.000 Chemical analysis costs
10.000 Chemical costs for cleaning and operational tests
Durable equipment:
18.000 Modifications and building of filtration characterisation unit
|
EAWAG
|
Personnel:
Post-doc Research Officer (22 PM)
Consumables:
32.000 Chemical analysis and operating costs
Durable equipment:
15.000 Modifications to existing pilot testing units and construction of new components/systems
|
UNITN
|
Personnel:
Professor (6 PM), Associate Prof. (6 PM), Graduate Lab. technician (13 PM), Research Officers (12/24 PM)
Consumables:
40.000 Chemical analysis costs: (COD, UV, flow-cytometry etc.)
Durable equipment:
10.000 Modification to the large pilot scale installations (module replacement, piping rearrangement, etc.)
10.000 Electronic modifications and equipments
|
UTS
|
Personnel:
Masters thesis work, PhD fellowships, post-doc Research Officers
Consumables:
25.000 Chemical analysis costs: (TOC, MW distribution, endocrine disruptors, conventional water and sludge analysis), construction of membrane module samples
Durable equipment:
21.000 Construction of three lab-scale pilot plant units for testing
|
UKZN
|
Personnel:
Post-doc Research Officer, Masters student thesis work
Consumables:
12.000 Chemical analysis costs and pilot plant operating costs
Durable equipment:
10.000 Construction of pilot plant testing unit
|
Polymem
|
Personnel:
Engineers (40.5 PM), Technician (16.5 PM)
Consumables:
5.000 lab scale membranes modules
10.000 semi industrial modules for testing (pilot nr.1)
5.000 membrane modules for ageing tests (pilot nr.2)
15.000 full scale prototype modules for testing (pilot nr.3)
5.000 Chemical analysis costs: (COT, MEB, COD, BOD, UV, bacteria)
Durable equipment:
20.000 Construction of pilot nr.1 – MBR pilot plant for 5m3/d
10.000 Construction of ageing tests pilot plant
20.000 Construction of mobile filtration plant
|
KMS
|
Personnel:
Project Engineers (24 PM)
Consumables:
40.000 Manufacturing of membrane samples and modules
Durable equipment:
15.000 Construction of test units/pilot components
|
FlowConc
|
Personnel:
Project Engineer (15 PM)
Consumables / equipment:
25.000 Computer hardware and software, licences fees
|
MILL
|
Personnel:
Product Engineer (8 PM)
Consumables:
20.000 Construction of membranes and membrane modules
Durable equipment:
15.000 Construction of test units/pilots
|
WHD
|
Personnel:
Process operator (36 PM), Process Engineer (8 PM), Researcher/Project Manager (6 PM)
Consumables:
30.000 Operation for costs for operating and running the MBR pilot
170.000 Chemical and microbial analysis: (COD, BOD, N, P, heavy metals, micro pollutants, endocrine disrupting components, bacteria, viruses)
|
EV
|
Personnel:
Researcher, Engineer (15 PM)
Consumables:
6.000 PC and data acquisition system
14.000 Chemical analysis and operation costs
|
IHE
|
Personnel:
Post-doc Research Officer, Masters student thesis work
Consumables:
3.600 Chemical analysis costs: (LC-OCD)
|
There are two end-user representatives in the partner consortium, WDH and EV. These partners bring an added value to the project through access to existing treatment plants, large-scale pilot plants, and long term operation reference data of existing treatment plants. WHD is responsible for the Heenvliet wastewater treatment plant in the Netherlands. A pilot MBR with a capacity of 100 m3/h is currently under construction and will be used in this project. The pilot MBR can be operated in parallel to the existing plant with a capacity of 290 m3/h, but can also be operated in combination with the plant enabling a hybrid MBR combination. This option offers a very promising concept for upgrading of existing wastewater treatment plants. Operation of the pilot plant will make much information available to the project. A direct comparison can be made between the performance of the conventional wastewater treatment plants and MBRs. Several parameters will be monitored, like nutrient removal, removal of micro pollutants, removal of endocrine disrupting agents and disinfection. Also several operational parameters will be monitored and optimised, like energy consumption, membrane cleaning and general operational parameters. The joint knowledge from laboratory and pilot tests will result in the further development of the MBR concept. EV is responsible for several wastewater treatment plants of which two are MBR processes, the Rödingen MBR plant and the Nordkanal plant. This offers the unique opportunity of testing findings from the laboratory scale on full-scale systems.
The EUROMBRA partners include three membrane manufacturing companies, Polymen, KMS and MILL. The companies both manufacture membranes and construct membrane modules which opens a great potential for the project team to get access to membrane materials and modules at various stages of construction. The potential of testing new concepts and prototypes is also apparent depending on the progress of the research program outlined in this project. These partners will supply membrane modules and units to various levels of the activity in project.
The project consortium has further been strengthened by the participation of FlowConcept, a SME specializing in computation fluid dynamics (CFD). The CFD-modelling will strengthen the analysis and understanding of hydrodynamics both within the membrane modules themselves and in complete treatment process schemes.
The 12 remaining partners of the 18 partner consortium represent universities and/or research institutions. These partners either manage or have access to a variety of well equipped laboratories and research facilities with advanced analytical instruments and pilot plant units which will be made available to the project. The indirect costs requested in the budget are primarily related to operation and analysis costs for this equipment, building and/or adapting some of the testing units, supplementing equipment as needed for the defined tests to be undertaken.
Own resources made available to the project by AC model contractors. The contribution of person months (PMs) for the AC partners is shown in Table 11.
Table 11 Contribution of AC partners in personnel resources
Partip. No.
|
Participant short name
|
Resources
Personnel: Effort:
|
Amount
|
1
|
NTNU
|
T. Leiknes, Associate Professor 12 PMs
H. Ødegaard, Professor 3 PMs
L. Fiksdal, Professor 3 PMs
A. Grostad, Workshop Manager 4 PMs
G. Thorvaldsen, T. Hårberg, Laboratory Staff 6 PMs
Administration staff 4 PMs
|
120.000
30.000
30.000
23.200
34.800
23.200 Total: € 261.200
|
2
|
CU
|
Professor 4 PMs
Senior Researcher 2 PMs
Technical Staff 4 PMs
Administrators 2 PMs
|
68.746
22.097
29.462
19.642 Total: € 162.946
|
3
|
RWTH
|
T. Melin, Professor 3 PMs
S. Yüce, T. Wintgens, Senior Researcher 6 PMs
J. Bouge, Technical Staff 3 PMs
G. Spalding, Laboratory Staff 6 PMs
|
Total: € 90.000
|
4
|
IBET
|
M. Teresa Crespo 9 PMs
Fernanda Rodrigues 9 PMs
|
36.903
22.793 Total: € 59.696
|
5
|
INSA
|
C. Cabassud, Professor 6 PMs
C. Guigui, Assistant-professor 6 PMs
M. Spérandio, Assistant-professor 2 PMs
N. Clergerie, Technician 4 PMs
B. Reboul, Technician 4 PMs
|
38.256
27.312
9.104
8.437
8.437 Total: € 91.546
|
6
|
UM2
|
A. Grasmick, Professor 6 PMs
C. Wisnieski, Assistant-professor 4 PMs
M. Heran, Assistant-professor 4 PMs
R. Boilletot, Technician 4 PMs
Post-doc/PhD 6 PMs
|
38.256
18.208
18.208
8.437
16.800 Total: € 99.909
|
7
|
TU-Delft
|
J. van der Graaf, Professor 6 PMs
J. deKoning, Assistant-professor 6 PMs
A. van Nieuwenhuijzen, Assistant-professor 4 PMs
A. Schuit, Lab/Technician 4 PMs
|
43.648
30.032
20.021
16.875 Total: € 110.576
|
8
|
EAWAG
|
H. Siegrist, Professor 2 PMs
A. Joss, Scientist 6 PMs
K. Rottermann, Technician 5 PMs
|
28.000
60.000
40.000 Total: € 128.000
|
10
|
UTS*
|
S. Vigneswaran, Professor 5 PMs
H. H. Ngo, Dr. 2 PMs
H. Nguyen, Professor 1 PMs
A. Fane, Professor (UNSW) 1 PMs
P. Smith, Mr. 1 PMs
E. Laszlo, Research Assistant 6 PMs
|
Total: € 80.000
|
11
|
UKZN
|
C. Buckley, Professor 4 PMs
K. Foxon, Researcher 10 PMs
M. Guness, Technical Staff 12 PMs
|
15.625
13.540
7.500 Total: € 36.665
|
|
|
Sum person month contribution Total: € 1,120.508
|
* Activities of UTS are supported by the Australian Government
Contribution in laboratory facilities and equipment by AC partners are shown in Table 12:
Table 12 Contribution of AC partners in facilities and equipment resources
Partip. No.
|
Participant short name
|
Resources
Facilities / Equipment
|
Amount
|
1
|
NTNU
|
Pilot plants, laboratory equipment, analytical instruments
|
Total: € 100.000
|
2
|
CU
|
Pilot hall, equipment, laboratories, analytical instruments
|
Total: € 23.000
|
3
|
RWTH
|
MBR pilot plant, test modules, laboratory instruments
|
Total: € 200.000
|
4
|
IBET
|
Pilot plant, filtration unit, analysis instruments
|
Total: € 43.859
|
6
|
UM2
|
Laboratory, pilot plant, analytical instruments
|
Total: € 104.000
|
7
|
TU-Delft
|
Laboratory and equipment:
|
Total: € 12.500
|
8
|
EAWAG
|
Experimental apparatus – MBR pilot
|
Total: € 200.000
|
10
|
UTS*
|
Laboratory facilities, analysis, and equipment
|
Total: € 95.000
|
11
|
UKZN
|
Laboratory and equipment
|
Total: € 4.750
|
|
|
Sum facilities / equipment contribution Total: € 783.109
|
* Activities of UTS are supported by the Australian Government
The total in-kind contribution to the project by the AC cost partners based on person months and in-kind contribution is therefore estimated at € 1.903.617.