1.7Workplanning and timetable


The scheduling of the work packages is shown as a GANTT diagram in Table 5.
Table 5: Project Planning and Timetable (quarterly activities)

Topic/Years quarter

1

2

3

4

5

6

7

8

9

10

11

12

WP1 Project scoping

1.1 Data acquisition and collation





































1.2 Calculation normalized parameters





































1.3 Literature survey & cost analysis





































1.4 Cost model development & refinement





































1.5 Report: cost evaluation





































WP2 Membrane module

2.1 Membrane characteristics





































2.2 Hydrodynamics in membrane filtration units





































2.3 Module design





































WP3 Aeration and membrane operation

3.1 Common methodology





































3.2 Laboratory-scale studies





































3.3 Characterization of aeration





































3.4 Definition of optimal parameters





































3.5 Analysis of process dynamics, modelling





































WP4 Process configuration

4.1 Characterize impact of reactor geometry on permeability





































4.2 Strategies for optimised nutrient elimination





































4.3 Impact of peak loads





































4.4 Recommendations for reactor configuration





































WP5 Feedwater characterisation and MBR monitoring

5.1 Characterisation methods





































5.2 Techniques for MBR monitoring





































5.3 Implementation techniques on MBR





































5.4 MBR process modelling





































5.5 Formulation and testing of operating guidelines





































WP6 Cleaning protocols

6.1 Cleaning strategies





































6.2 Cleaning protocols





































6.3 Residual / waste management





































6.4 Membrane life-time





































WP7 Concentrate / sludge handling and management

7.1 Sludge production model





































7.2 Sludge stabilization





































7.3 Dewaterability





































WP8 MBR case studies

8.1 Pilot and case studies





































8.2 Upgrading / retrofitting





































8.3 Cost model collation





































WP9 Presentation and dissemination of results

9.1 EUROMBRA web site, dissemination of results





































9.2 International workshop / conference





































9.3 Scientific reports





































9.4 Publications





































WP10 Overall scientific coordination











































Yüklə 1,14 Mb.

Dostları ilə paylaş:
1   2   3   4   5   6   7   8   9   10   ...   15




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin