1.8Graphical presentation of work packages

A graphic presentation of the project activities and interaction in the project are shown in Figure 2. Project scoping as defined in WP1 will be the main activity in the beginning together with initiation steps for the experimental work in most of the WPs that make up the experimental R&D activity. These WPs will eventually constitute the bulk of activity within the project. As they are closely interlinked and related the various tasks will be conducted in parallel within the WPs. The tasks within each work package shall be coordinated through the Work Package Committees (WPC) as defined under section 6 to ensure integration and exchange of necessary findings between the respective WP tasks. Coordination of the activities will be ensured by having WP meetings as necessary and by distributing the Interim Activity Reports (each 6 months) and the Periodic Activity Reports (every 12 months) to all project partners through the projects internet-based information system.


Figure 2 Graphic presentation of Work Packages and the relationship between each.




1.9Work package list /overview



Table 6 Work package overview


Work-package
No


Work package title

Lead
contractor
No


Person-months

Start
month


End
month


Deliverable
No


WP1

Project scoping

CU

18

0

36

D1, D9, D16 D33, D40

WP2

Membrane module

RWTH

117

3

36

D4, D10, D17, D19, D26, D34

WP3

Aeration and membrane operation

INSA

135

0

36

D2, D5, D11, D20, D35

WP4

Process configuration

EAWAG

59

0

36

D6, D12, D21, D27, D36

WP5

Feedwater characterisation and MBR monitoring

IBET

127

0

36

D7, D13, D22, D37,

WP6

Cleaning protocols

Polymem

55

0

36

D8, D14, D23 D24, D28, D29, D38

WP7

Concentrate / sludge handling and management

UNITN

19

3

36

D3, D15, D18 D30, D39

WP8

MBR case studies

TU-Delft

64

6

36

D16, D31, D32, D40

WP9

Presentation and dissemination of results

NTNU

17

0

36

D41, D42, D43 D44,

WP10

Overall and scientific coordination

NTNU

9

0

36

D45, D46, D47 D48, D49




TOTAL




600












1.10Deliverables list

The project deliverables have essentially been organized in chronological order based on planed delivery date.


Table 7 Deliverables list

Del. no.

Deliverable name

WP no.

Responsible Partner

Relevant to objective no.

Recipients

Nature

Dissemination
level


Delivery date:

Planed Real

D1

Data acquisition and collation completed for all partners

1

CU

10

All partners

R

PU

M 3




D2

Definition of (a) normalized parameters, and (b) common analytical methodologies

3

INSA

2, 10

All partners

R

PP

M 3




D3

State of the art and definition on a common basis: parameter definition for sludge component

7

UNITN

2

All partners

R

PP

M 3




D4

Definition of membrane materials and analytical tools selected

2

RWTH

2, 4

WPs 3-4-6-8

R

PP

M 6




D5

Literature review / data on aeration and main operating conditions in MBRs

3

INSA

5

All partners

R

PU

M 6




D6

Scope of study: shock loads, nutrient removal

4

EAWAG

6, 3

WPs 5-6-7

R

PP

M 6




D7

Protocol for the different characterization and monitoring techniques (off-line and on-line).

5

IBET

2

WPs 2-3-4-8

R

PP

M 6




D8

Identification of cleaning protocols, literature & pilot plant studies

6

Polymem

5

All partners

R

PU

M 6




D9

Outline cost analysis, pilot plant data, & identification of base operating conditions

1

CU

10

All partners

R

PP/PU

M 6




D10

Membrane materials characterisation and filtration tests

2

RWTH

4, 1

All partners

R

PP

M 12




D11

Characterization of air/water flow in different modules

3

INSA

1, 5

All partners

R

PU

M 12




D12

Results of raw sewage challenge trials

4

DUT

3

All partners

R

PU

M 12




D13

Characterization and comparison of monitoring techniques applied to the selected MBRs operated by involved partners

5

IBET

2

All partners

R

PU

M 12




D14

Cleaning protocol tests

6

Polymem

5

All partners

R

PU

M 12




D15

Mathematical model development, sludge

7

UNITN

9, 3, 5

All partners

R

PP

M 12




D16

Cost analysis, literature data (incl. pilot plant trials conducted by partners)

1, 8

CU

10

All partners

R

PU

M 12




D17

Process system for module investigation set-up

2

RWTH

1

WPs 3-5

R

PP

M 18




D18

Completion of development, calibration and validation of the mathematical model

7

UNITN

3, 5

WP 8

R

PP

M18




D19

Membrane module tests and characterisation of mass transfer systems

2

RWTH

1

All partners

R

PP/PU

M 24




D20

Experimental data on laboratory scale experiments, aeration trials

3

INSA

5

All partners

R

PU

M 24




D21

Nutrient elimination trials

4

UNITN

8

All partners

R

PU

M 24




D22

Modelling packages for all MBR systems studied and formulation of operational guidelines.

5

IBET

1, 3, 5

All partners

R

PU

M 24




D23

Testing of cleaning protocols

6

Polymem

5

All partners

R

PU

M 24




D24

Recommendations for chemical waste management

6

WHD

9, 10

All partners

R

PU

M 24




D25

Assessment of impact of process conditions (SRT, MLSS concentration) on residual respiration rate

7

UNITN

5

All partners

R

PU

M 24




D26

Module investigation completed and optimisation goals defined

2

RWTH

1

WPs 3-4-6-8

R

PP/PU

M 30




D27

Impact of reactor configuration on membrane performance and nutrient elimination assessed

4

EAWAG

8

All partners

R

PU

M 30




D28

Pilot plant testing

6

WHD

3, 5, 10

All partners

R

PU

M 30




D29

Membrane module autopsies complete

6

Polymem

1

WPs 2-3-5

R

PP/PU

M 30




D30

Completion of study of filterability (SRF) and dewaterability (CST) for AS and MBR plants; pilot scale belt press tests

7

UNITN

9

All partners

R

PU

M 30




D31

Collation of data from sludge dewatering trials

8

WHD

9

All partners

R

PU

M 33




D32

Collation of all data, sludge, pilot and full-scale MBR trials

8

WHD

9

All partners

R

PU

M 33




D33

Outline cost analysis, all data

1

CU

10

All partners

R

PU

M 33




D34

Improved membrane module design and operation concept

2

RWTH

1

All partners

R

PU

M 36




D35

Aeration and operation of MBRs as a function of waste water quality and module configuration

3

INSA

3, 5

All partners

R

PU

M 36




D36

Recommendations for reactor configuration, dimensioning and process control

4

EAWAG

5, 10

All partners

R

PU

M 36




D37

Operational guidelines for optimising MBR performance on tested systems.

5

IBET

5, 10

All partners

R

PU

M 36




D38

Life-time analysis as a function of membrane cleaning

6

Polymem

5, 10

All partners

R

PU

M 36




D39

Appropriate sludge management

7

UNITN

9, 10

All partners

R

PU

M 36




D40

Cost model and cost benefit analysis, all data

1, 8

CU

10

All partners

R

PU

M 36




D41

Initiation of project web-site (The site will be updated throughout the program)

9

NTNU

11

All partners

O

PP/PU

M 3




D42

Organization of international workshops/conferences

9

NTNU

11

Public

O

PU

-




D43

Publications; scientific reports, workshop/conferences contributions, journal papers

9

NTNU

11

Public

O

PU

M 6-36




D44

Summary website; Results, reports, publications and conclusion of project

9

NTNU

11

Public

O

PU

M 36




D45

Project kick-off meeting

10

NTNU

-

All partners

O

PP

M 3




D46

Clustering activity with the AMEDEUS project.

10

NTNU

-

All partners

O

PU

M 1-36




D47

Interim Activity Reports / Periodic Activity Reports.

10

NTNU

-

All partners

R

PP

M 3-36




D48

Project Steering Committee meetings.

10

NTNU

-

PSC members

R

PP

M 6-36




D49

Project finished (final report, software available, documents published, and final financial report).

10

NTNU

11

Public

R

PU

M 36




Yüklə 1,14 Mb.

Dostları ilə paylaş:
1   ...   4   5   6   7   8   9   10   11   ...   15




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin