Pre-Installation Site Survey

A pre-installation survey by the contractor(s) is highly recommended. As part of this on-site survey, the contractor should determine the impact of roadway geometry, bus stop placements, line of sight restrictions, pedestrian crossing volumes, and existing equipment to the system design. For example, in the case of installing equipment for EVP in areas that have closely spaced signalized intersections, it is important to consider the effect of overlapping detection distances. In the case of bus priority, detector placement must be carefully sited to avoid putting a bus in the dilemma-zone when the traffic signal turns amber. Detector placement and installation will need to consider the impacts of bus speed, length of green extension, and intersection width as well as location of bus stops. For example, for a bus traveling at 15 mph (22 fps) with a maximum green extension of 10 seconds through an intersection width of 40 feet, a detection distance of approximately 180 feet provides sufficient time to allow the bus to clear the dilemma zone.



Yüklə 359,2 Kb.

Dostları ilə paylaş:
1   ...   7   8   9   10   11   12   13   14   ...   38




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin