Training Requirements


The Vendor shall provide operational and maintenance training to personnel designated by VDOT and Fairfax County during installation, testing, and debugging. This training shall be provided through practical demonstrations, seminars, and other related technical procedures. Operations and maintenance manuals shall be provided for each trainee.
The training shall include, but not be limited to, the following:

A. Hands-on operation for each type of equipment

B. Explanation of system commands, their function, and their usage

C. Required preventive maintenance procedures

D. Servicing procedures

E. System troubleshooting or problem identification procedures



  1. Recommend spare parts




    1. Yüklə 359,2 Kb.

      Dostları ilə paylaş:
1   ...   26   27   28   29   30   31   32   33   ...   38




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin