Wp 1 Energy and Urban Planning



Yüklə 445 b.
tarix29.07.2018
ölçüsü445 b.
#62617



WP 1.1 Energy and Urban Planning



Development in Energy Policies of innovations provided by CONCERTO : Wood Fire Heating systems integrated in urban media

  • Development in Energy Policies of innovations provided by CONCERTO : Wood Fire Heating systems integrated in urban media

  • used for other urban projects of Lyon agglomeration (Sathonay Camp planned in 2010-2011 – Bron Teraillon : diagnostic of existing system and study of Wood fuel solution)

  • Integration of results of this innovative project in local and national policies :

  • - reference framework for sustainable housing : done & applied

  • ° 3225 housing concerned

  • ° experience feedback (economic and operational : environment management, over cost identification, …)

  • - reference framework for office buildings : done & in test process

  • 96 000 m2 in planning process



Other part of local policy:

  • Other part of local policy:

  • collaboration with Rhône-Alpes Region in order to promote the Building Environmental Quality for the social housing with adapted assistance

  • => Reference framework in process

  • National level :

  • - project followed by ADEME

  • - Enertech implied as a consultant of the group “isolons la terre” (insulating the earth).

  • Target : reduction of heat consumption below 50 KWh/sq.m./year in renovated older buildings

  • - CONCERTO : reference program for debate on High Efficiency Buildings



WP 1.2 Ecobuildings Definition & Validation of the Objectives

  • Accompaniment of the Design

  • => Finished

  • Checking of program performance objectives (numerical simulation for energy consumption and thermal comfort)

  • => Finished

  • Checking of Consultation Documents established by developers for selection of building companies

    • Finished for 1 block. In process for the 2 others


  • Accompaniment and Analysis of the « Wood » Projects

  • - Data have to be validated

  • - Companies Consultation Documents are analyzed

  • - Asked for design allowing the reversibility of the burner rooms

  • Sustainable provisioning through local resource development

  • Preparation and programming of study "Coppice of short rotation“ less than 5 years (next 18 months)



Maintenance contracts

  • Maintenance contracts

  • - State of the actions carried out by the promoters on equipment managements

  • - Information retrieval and meets professionals

  • - Launching of a technical and legal study (subcontracting)

  • - Returned and Exchange with the promoters