Numer dokumentu: / Document number:

E-ILF-B-C11-ARC-SPC-0002_R03

Inwestor: / Investor:

The Capital City of Warsaw is represented by Zarząd Transportu Miejskiego [Municipal Transport Authority] in Warsaw, on behalf of and for the benefit of which acts the company Metro Warszawskie Sp. z o. o. in Warsaw; ul. Wilczy Dół 5
The Capital City of Warsaw represented by the Municipal Transport Management in Warsaw, on behalf and for the benefit of which acts Metro Warszawskie Sp. z o. o. in Warsaw; 5 Wilczy Dół Street, Warsaw







Projekt ubiega się o współfinansowanie przez Unię Europejską z Funduszy Spójności w ramach Programu Operacyjnego Infrastruktura i Środowisko /

The Project is applying for the European Union co-financing from the Cohesion Fund within the framework of the Operational Program Infrastructure and Environment





Wykonawca: / Contractor:







ASTALDI S.p.A. – leader

via G. V. Bona

65 – 00156 Rome, Italy


Gülermak Ağır Sanayi İnşaat ve Taahhüt A.Ş. – partner

Karanfil Sokak 15/2 Kızılay 06650 Ankara



Przedsiębiorstwo Budowy Dróg i Mostów Sp. z o.o. – partner

ul. Kolejowa 28,

05-300 Mińsk Mazowiecki, Poland


Projektant / Designer:





ILF CONSULTING ENGINEERS Polska Sp. z o. o.

ul. Postępu 15 B,



02-676 Warsaw, Poland



Nazwa inwestycji: / Investment name:

PROJEKT I BUDOWA II LINII METRA OD STACJI „RONDO DASZYŃSKIEGO”

DO STACJI „DWORZEC WILEŃSKI” W WARSZAWIE /

DESIGN AND CONSTRUCTION OF THE UNDERGROUND LINE II FROM “RONDO DASZYŃSKIEGO” STATION TO THE “DWORZEC WILEŃSKI” STATION IN WARSAW

Przedmiot opracowania:/ Subject of the study:

BUILDING PERMIT DESIGN
ARCHITECTURAL-BUILDING DESIGN


Building Investment no. 5, C11 “ŚWIĘTOKRZYSKA” station
Świętokrzyska Street / Marszałkowska Street – PKiN area – Warsaw
and within the chainage scope 120+50–125 with railway installations and systems


ARCHITECTURE




Volume III; Chapter 01

Copy no.

Warsaw, August 2010







Full name

License no.

Revision date

Signature

Design works coordinator

M.Sc. Eng. Sławomir Kaszewski

MAZ/0070/POOK/05

08.2010




Design team:

Designers:

Subject scope

Full name

License no.

Revision date

Signature

Architecture

M.Sc. Eng. (Arch) Ewa Rosiak

9/ZPOIA/2006

08.2010





Checked by:


Subject scope

Full name

License no.

Revision date

Signature

Architecture

M.Sc. Eng. (Arch.) Ewa Radomska-Kuklińska

GP.II-8346-140/77

08.2010




LIST OF BUILDING PERMIT DESIGN ELABORATIONS

Volume I SITE DEVELOPMENT PLAN

Volume II BUILDING PLAN

ROADS, NETWORKS, GREENERY



Volume III BUILDING PLAN

ARCHITECTURE, STRUCTURE, SYSTEMS

01 ARCHITECTURE

02 STRUCTURE

03 MONITORING DESIGN

04 WATER SEWAGE SYSTEM

05 HEATING-VENTILATION SYSTEM

06 ELECTRICAL INSTALLATIONS

07 COMMUNICATION SYSTEMS FOR STATION C11

08 RADIO COMMUNICATION

09 FIBRE OPTICS CABLES BETWEEN FACILITIES

10 LAN/WLAN

11 TRAIN TRAFFIC CONTROL EQUIPMENT

12 TIME NETWORK AND AUTOMATIC PASSENGER INFORMATION SYSTEM

Volume IV BUILDING PLAN

FIRE SAFETY CONDITIONS

Volume V BUILDING PLAN

RAILWAY


Volume VI BUILDING PLAN

HEALTH AND SAFETY INFORMATION / BIOZ

Volume VII BUILDING PLAN

TECHNOLOGY

Volume VIII BUILDING PLAN

STATEMENTS – LEGAL RIGHTS TO DISPOSE OF REAL ESTATE FOR CONSTRUCTION PURPOSES



TABLE OF CONTENTS

Item.

Name

Document No.

A

DESCRIPTIVE PART




1

Architectural-building design Architecture

E-ILF-B-C11-ARC-SPC-0002_R03

b

DRAWING PART




1

ORIENTATION SCHEME

D-PRT-B-C11-ARC-LAY-1500-R03

2

PLATFORM LEVEL PLAN (P-1)

D-PRT-B-C11-ARC-LAY-2000-R03

3

PLATFORM LEVEL PLAN (P-2)

D-PRT-B-C11-ARC-LAY-2001-R03

4

UNDER PLATFORM LEVEL (UP-1)

D-PRT-B-C11-ARC-LAY-2500-R03

5

UNDER PLATFORM LEVEL (UP-2)

D-PRT-B-C11-ARC-LAY-2501-R03

6

TECHNICAL LEVEL PLAN (T-1)

D-PRT-B-C11-ARC-LAY-3000-R03

7

TECHNICAL LEVEL PLAN (T-2)

D-PRT-B-C11-ARC-LAY-3001-R03

8

TECHNICAL AND CONCOURSE LEVEL PLAN (TC-1)

D-PRT-B-C11-ARC-LAY-4000-R03

9

TECHNICAL AND CONCOURSE LEVEL PLAN (TC-2)

D-PRT-B-C11-ARC-LAY-4001-R03

10

TECHNICAL AND CONCOURSE LEVEL PLAN (TC-3)

D-PRT-B-C11-ARC-LAY-4002-R03

11

SECTION A-A (S-1)

D-PRT-B-C11-ARC-SEC-7000-R03

12

SECTION A-A (S-2)

D-PRT-B-C11-ARC-SEC-7001-R03

13

SECTION B-B, D-D

D-PRT-B-C11-ARC-SEC-7100-R03

14

SECTION F-F, C-C

D-PRT-B-C11-ARC-SEC-7200-R03

15

SECTION E-E, G-G

D-PRT-B-C11-ARC-SEC-7300-R03

16

ABOVE-GROUND ELEMENTS ARCHITECTURE – 01

D-PRT-B-C11-ARC-LAY-8000-R03

17

ABOVE-GROUND ELEMENTS ARCHITECTURE – 02

D-PRT-B-C11-ARC-LAY-8001-R03

18

STORAGE ROOM ADAPTATION FOR MONITORING ROOM

D-ILF-B-C11-ARC-LAY-0001-R03


A. DESCRIPTIVE PART
TABLE OFCONTENTS

1 GENERAL PART 13

1.1 Scope of the investment 14

1.2 Essential documents 14

1.3 Scope of the elaboration 16

2 EXISTING LAND DEVELOPMENT CONDITION 18

3 functional solutions and object characteristics 19

3.1 Building description 19

3.2 Building structure characteristics 19

3.3 Functional description of the Station 21

3.4 Platforms 23

3.4.1 Passenger platforms 23

3.4.2 Technical platforms 23

3.5 Internal systems 23

4 Surface and Cubic Volumes List 25

5 Architectural and Building Solutions 26

5.1 Construction works 26

5.2 External walls 27

5.3 Internal walls 27

5.4 Ceilings 27

5.4.1 Architectural concrete ceiling 27

5.4.2 Suspended ceilings 28

5.4.3 Suspended ceiling - platform 28

5.5 Internal plasters 28

5.6 Waterproof and damp insulation 28

5.7 Thermal insulations 29

5.8 Acoustic claddings and acoustical coating 30

5.9 Ticket gates 30

5.10 Gates / doors – ticket zone barriers 30

5.11 Doors 31

5.11.1 Internal doors 31

5.11.2 External doors 31

5.11.3 Technical doors 32

5.11.4 Fire-resisting doors 32

5.11.5 Glazed door 32

5.12 Glass walls 32

5.13 Dispatch office windows 32

5.14 Seats on platforms 32

5.15 Handrails, handles 32

5.16 Roofs and screens - Metro entrances 33

5.17 Escalators and lifts 33

5.17.1 Escalators 33

5.17.2 Lifts 34

5.18 Exit staircases 34

5.19 External finish of air exhaust shaft surface, air intake and exhaust shaft 35

5.20 Structural landscaping elements 35

5.21 Bands around on-ground elements 35

5.22 Finish components 35

5.22.1 Stone finish 35

5.22.1.1 Floor finishes on passenger platform 35

5.22.1.2 Wall finishes on passenger platform 36

5.22.1.3 Floor finishes in check-in hall and underground passages 36

5.22.1.4 Walls in check-in halls and underground passages 36

5.22.2 Metropolitan gallery on entresol level 36

5.22.3 Ceramic wall and floor finish 36

5.22.4 Epoxy floor 37

5.22.5 Oil-proof floor 37

5.22.6 Antistatic flooring 37

5.22.7 Dielectric floors 37

5.22.8 Raised floor, floor finish under raised floor 38

5.22.9 Technical floors 38

5.22.10 Stairs finish 38

5.22.11 Paint finish 38

5.22.12 Modular partition walls in toilets and baths 39

6 employment 40

7 disabled facilities adaptation 41

8 OCCUPATIONAL HEALTH AND SAFETY 43

8.1 General remarks 43

8.1.1 Selection of technical guidelines in the facility adapted to the OSH and sanitary requirements. 43

8.1.2 Water supply network 44

8.1.3 Power systems 44

8.1.4 Basic ventilation 44

8.2 Locker rooms and lavatories 45

8.3 Toilets 45

8.3.1 Technical rooms 45

8.3.2 Places accessible to passengers - public zones 46

8.4 Lighting 46

8.5 Access to devices 46

8.6 OSH concluding remarks 47

9 SECURITY of passengers AND PROTECTION 48

9.1 Security 48

9.1.1 General rules 48

9.1.2 Stairs 48

9.1.3 Platform 48

9.1.4 Lifts 49

9.1.5 Exit doorway 49

9.2 Protection – security in the station 49

9.2.1 General rules 49

9.2.2 Passengers security and access control 50

9.2.3 Entrances to public zones in stations 50

9.2.4 Entrances to passenger zones in stations 50

10 FIRE SAFETY CHARACTERISTICS 51

10.1 Destination of the object 51

10.2 People danger category. Forecasted number of person at each storey and in particular room 51

10.3 Forecasted fire load density 52

10.4 Building's fire protection class and fire protection class of construction components and their fire propagation grade 52

10.5 Reaction on fire 53

10.6 Validation of explosion danger of rooms and external spaces. 54

10.7 Dividing the object into fire zones 54

10.8 Evacuation conditions 55

10.9 Fire accessroutes 55

10.10 Remarks 55

11 CONNECTION WITH EXISTING STATION A14 56

12 monitoring ROOM 57

13 Concluding remarks 58

14 ACOUSTIC ISSUES 61

14.1 Noise/BHP 61

14.2 Acoustic protection 67

14.2.1 Platform 67

14.2.2 Other utility rooms in passenger zones 73

15 power characteristics 76



Copyright Notice

  1. The permissible scope and way of using the design is defined in the agreement dated October 28th 2009, concluded by and between the Capital City of Warsaw and the consortium of companies: Astaldi S.p.A., Gülermak Agir Sanayi Insaat ve Taahhüt A.S. AND PBDiM sp. z o.o.




  1. Personal copyrights of the authors of this design are protected under the applicable copyright laws at each investment implementation phase and on each exercise of derivative copyrights.




Yüklə 296,79 Kb.

Dostları ilə paylaş:
  1   2   3   4   5   6   7   8   9   ...   14




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin