A quick overview of e-berk



Yüklə 445 b.
tarix15.09.2018
ölçüsü445 b.
#82109



A quick overview of E-Berk

  • A quick overview of E-Berk

  • Project details in Turkey

  • Upcoming projects in Turkey

  • Project details in the Middle East

  • Selected planned major tunnelling projects in the M.E.

  • Selected major tunnelling projects under way in the M.E.

  • Conclusion



Founded in 2002 as subsidiary of Ozudogru Group of Companies.

  • Founded in 2002 as subsidiary of Ozudogru Group of Companies.

  • Located in Ankara with 8000 m² manufacturing and heat treating closed facility.

  • Offices are located in Istanbul, England and Qatar (from October 2012).

  • All kind of TBM cutters has been producing such as cutter ring, single and double disc cutter, ripper, bucket, knife and any kind of cutter with tungsten carbide.

  • Cutterhead modification, TBM overhaul and site assembly.

  • 20 projects has been finished in Turkey and exports increased to 12 different countries such as Russia, Poland, India, Bulgaria, Saudi Arabia, Azerbaijan, Australia, Israel, and so on.



Metro transportation is an indispensible issue

  • Metro transportation is an indispensible issue

  • for solving traffic problem for metropolitan

  • areas. Therefore, every year metropolitan

  • municipalities spend a lot of money for metro

  • tunnel construction from their budget. For

  • example, Istanbul Metropolitan Municipality

  • (IMM) has been spending approximately 45 %

  • of its investment budget for metro and

  • transportation projects in last year's.



Depending on the ratio of the population of

  • Depending on the ratio of the population of

  • human beings, clean water supply and

  • waste water disposal projects is becoming

  • more importance. Within this scope, General

  • Directorate of State Hydraulic Works has

  • also been spending approximately 20 %

  • of its investment budget which is about 1

  • billion USD to clean and waste water tunnel

  • project.



PROJECT DETAILS IN TURKEY

  • PROJECT DETAILS IN TURKEY











Location: Cayırbasi Ayazaga, Turkey

  • Location: Cayırbasi Ayazaga, Turkey

  • Contractor:DEPAR INS.

  • Lenght of Tunnel: 5000 m

  • Type of TBM: Herrenknecht Hardrock TBM

  • Diameter of TBM: 3120 m 













Location: Istanbul,

  • Location: Istanbul,

  • Mosmetrostroy, Engeocom,

  • Alke and STFA Joint Venture

  • Lenght of Tunnel: 5500 m

  • Type of TBM:Herrenknecht EPB

  • Diameter of TBM: 6.15 m



Location: Bilecik-Kosekoy,

  • Location: Bilecik-Kosekoy,

  • Cengiz, Ictas, Belen Joint Venture

  • Lenght of Tunnel: 6100 m

  • Type of TBM:Herrenknecht

  • Single Shiled

  • Diameter of TBM: 13.77 m



Location: Gerede, Kolin

  • Location: Gerede, Kolin

  • Limak Joint Venture

  • Lenght of Tunnel: 31600 m

  • Type of TBM: 3 Herrenknecht

  • Double Shiled

  • Diameter of TBM: 5.40 m



Location: Istanbul, Dogus Const.

  • Location: Istanbul, Dogus Const.

  • Lenght of Tunnel: 22100 m by

  • TBMs, 18700 m by NATM

  • Type of TBM: 3 Herrenknecht

  • Double Shiled

  • Diameter of TBM: 6.30 m



Location: Sanliurfa, Ilci Const.

  • Location: Sanliurfa, Ilci Const.

  • Lenght of Tunnel: 17185 m

  • Type of TBM: SELI Double Shiled

  • Diameter of TBM: 7.80 m





Ankara Metro (M2, Kizilay-Çayyolu)

  • Ankara Metro (M2, Kizilay-Çayyolu)

  • 16.6 km total length, 3.7 km by TBM and 2.9

  • km by NATM.

  • Ankara Metro (M3, Batikent-Torekent)

  • 16 km total length, 2 km by TBM and 6.6 km

  • by cut and cover.

  • Ankara Metro (M4, Tandoğan-Kecioren)

  • - 9.2 km total length, 4.2 km by TBM and 3 km by NATM.



Location: Kargi-Corum, Gulermak

  • Location: Kargi-Corum, Gulermak

  • Heavy Ind.Co.

  • Lenght of Tunnel: 11800 m

  • Type of TBM: Robbins Double

  • Shiled

  • Diameter of TBM: 10.00 m



Location: Adana, EnerjiSa-NTF

  • Location: Adana, EnerjiSa-NTF

  • Const.

  • Lenght of Tunnel: 7900 m

  • Type of TBM: Robbins Double

  • Shiled

  • Diameter of TBM: 4.40 m



Location: Adana, EnerjiSa

  • Location: Adana, EnerjiSa

  • Atac,Hinteregger Joint Venture

  • Lenght of Tunnel: 6900 m

  • Type of TBM: Herrenknecht Double

  • Shiled

  • Diameter of TBM: 4.20 m



Location: Adana, Alarko-Altek

  • Location: Adana, Alarko-Altek

  • Const.

  • Lenght of Tunnel: 11000 m

  • Type of TBM: 2 CAT Double

  • Shiled

  • Diameter of TBM: 3.00 m



OVIT Tunnel Project;

  • OVIT Tunnel Project;

  • City : Rize

  • Contractor : Makyol Const.

  • Length : 30 km (2 x 15 km)

  • Diameter : 12.50 m excavation

  • Machine Type : 2 Gripper TBM

  • 1850 m Raise Boring with 6 m diameter for ventilation shafts



Silvan Tunnel Project;

  • Silvan Tunnel Project;

  • City : Diyarbakır

  • Contractor : Yertas, Kayaoglu Joint Venture

  • Length : 20.5 km (2 x 10.25 km)

  • Diameter : 7.9 m excavation

  • Machine Type : Double Shield TBM (Herrenknecht)

  • Babakaya Tunnel Project;

  • City : Diyarbakır

  • Contractor : Unal Akpınar Const.

  • Length : 10.4 km (2 x 5.2 km)

  • Diameter : 7.9 m diameter

  • Machine Type : Double Shield TBM (CAT)



Beylerbeyi Wastewater Tunnel Project,

  • Beylerbeyi Wastewater Tunnel Project,

  • City : Istanbul

  • Contractor : Unal Akpinar Const.

  • Length : 4680 m

  • Diameter : 3.2 m excavation

  • Machine Type : Single shiled

  • Zeytinburnu Wastewater Tunnel Project,

  • City : Istanbul

  • Contractor : Unal Akpinar Const.

  • Length : 4500 m

  • Diameter : 3.2 m excavation

  • Machine Type : EPB



Dogancay Tunnel Project (Ankara-Istanbul High Speed Rail Project);

  • Dogancay Tunnel Project (Ankara-Istanbul High Speed Rail Project);

  • - City : Bilecik (Vezirhan-Kosekoy)

  • Length : 7.4 km

  • Diameter : 13.80 m excavation

  • Machine Type : EPB (expected)

  • Bagbası Tunnel Project;

  • City : Konya

  • Contractor : Ilci Constr.

  • Length : 18 km

  • Diameter : 5.2 m excavation

  • Machine Type : Double shiled TBM



Bosphorus Crossing Tunnel Project;

  • Bosphorus Crossing Tunnel Project;

  • City : Istanbul, under the bosphorus

  • Contractor : Yapi Merkezi and SKEC-Samwhan-Hansin-Namkwang-Kukdong Joint Venture

  • Length : 3.34 km

  • Diameter : 13.70 m excavation

  • Machine Type : Herrenknecht Slurry TBM





As it is know that the Middle East market has quite

  • As it is know that the Middle East market has quite

  • big value of construction industry. About 80 per

  • cent of the projects involving tunnelling are in the

  • transport sector, including metro schemes in Cairo,

  • Abu Dhabi, Baku, Tehran,Tel Aviv, Doha, Riyadh

  • and Kuwait. Urban transport projects often for

  • tunnelling as underground lines minimise disruption to

  • the existing buildings and infrastructure of cities.

  • More than $279 bn-worth of projects with a tunnelling

  • element are currently planned or under way in the

  • Middle East.

  •  



With $76.2bn of new projects and extensions to

  • With $76.2bn of new projects and extensions to

  • existing lines planned in the Gulf and North

  • Africa, the urban rail sector is set to offer

  • significant opportunities for contractors in the

  • region.

  • If we have a look at tunnelling industry, we have

  • seen that there are many projects which are under

  • way and planning to built.







Kuwait Metro Project,

  • Kuwait Metro Project,

  • Sector: Rail

  • Cost : 7 billion USD

  • Scope : 160km metro network

  • Client : Partnerships Technical Bureau

  • Country : Kuwait

  • Expected Tunnelling : TBM

  • Tender Issue Date: Jul-12





Inner Doha Resewerage Scheme,

  • Inner Doha Resewerage Scheme,

  • Sector : Water

  • Cost : 2,5 billion USD

  • Scope : Interceptor tunnel

  • Client : Public Works Authority (Ashghal)

  • Country : Qatar

  • Expected Tunnelling : TBM

  • Tender Issue Date : Dec-12





King Faisal Tunnel,

  • King Faisal Tunnel,

  • Sector: Road

  • Cost : 500 million USD

  • Scope : 2.5km underpass beneath King Faisal highway

  • Client : Ministry of Public Works

  • Country: Bahrain

  • Estimated Tunnelling : Cut and cover

  • Tender Issue Date : Jan-13





Etihad Rail Phase 3,

  • Etihad Rail Phase 3,

  • Sector : Rail

  • Cost : 2,5 billion USD

  • Scope : Final section of 1,200km network to Fujairah and Oman border

  • Client: Etihad Rail

  • Country: UAE

  • Estimated Tunnelling: Drill and blast

  • Tender Issue Date: Jan-13





Oman National Railway,

  • Oman National Railway,

  • Sector : Rail

  • Cost: 2,5 billion USD

  • Scope : 1,370km network, starting with 230km line from Muscat to Sohar

  • Client: Ministry of Transport

  • Country: Oman

  • Estimated Tunnelling : Drill and blast

  • Tender Issue Date : Apr-13





Mecca-Taif Road Tunnel,

  • Mecca-Taif Road Tunnel,

  • Sector : Road

  • Cost : 533 million USD

  • Scope : 11km road tunnel

  • Client : Al-Tareek Investment & Development Company

  • Country : Saudi Arabia

  • Estimated Tunnelling : Cut and cover

  • Tender Issue Date : Apr-13





Abu Dhabi Metro,

  • Abu Dhabi Metro,

  • Sector : Rail

  • Cost : 7 billion USD

  • Scope : 131km network under Abu Dhabi, mainly tunnelled

  • Client : Ministry of Transport

  • Country : UAE

  • Estimated Tunnelling : TBM

  • Tender Issue Date : Jun-13





Cairo Metro Line 4 ,

  • Cairo Metro Line 4 ,

  • Sector : Rail

  • Cost : 2,6 billion USD

  • Scope : 24km metro linking Giza and Grand Museum to city centre

  • Client : National Authority for Tunnelling

  • Country : Egypt

  • Estimated Tunnelling : TBM

  • Tender Issue Date : Aug-13



Cairo Metro Line 3 Phase 3 ,

  • Cairo Metro Line 3 Phase 3 ,

  • Sector : Rail

  • Cost : 1 billion USD

  • Scope : 16.6km, mainly underground, extending current Line 3

  • Client : National Authority for Tunnelling

  • Country : Egypt

  • Estimated Tunnelling : TBM

  • Tender Issue Date : Third quarter 2012





Baghdad Metro Project,

  • Baghdad Metro Project,

  • Sector : Rail

  • Cost : 3 billion USD

  • Scope : 39km city centre metro network

  • Client : Baghdad Municipality

  • Country : Iraq

  • Estimated Tunnelling : TBM

  • Tender Issue Date : Dec-13





Tehran Metro Lines 8,9 and Express Lines,

  • Tehran Metro Lines 8,9 and Express Lines,

  • Sector : Rail

  • Cost : 10 billion USD

  • Scope : 179km expansion of existing system by 2025

  • Client : Tehran Metro Company

  • Country : Iran

  • Estimated Tunnelling : TBM

  • Tender Issue Date : First quarter 2018





Al-Hayer Wastewater Project,

  • Al-Hayer Wastewater Project,

  • Sector : Water

  • Cost : 100 million USD

  • Scope : Two 37km 3,000mm wastewater tunnels

  • Client : National Water Company

  • Country : Saudi Arabia

  • Estimated Tunnelling : TBM

  • Tender Issue Date : Bids under evaluation







Abu Dhabi Road Tunnels Project,

  • Abu Dhabi Road Tunnels Project,

  • Sector : Road

  • Cost : 817 million USD

  • Scope : Three road tunnels and two flyovers improving road access to Port Zayed

  • Status : Under construction

  • Country : UAE

  • Client : Abu Dhabi Municipality

  • Proposed Completion Date : May-12





Qatar Education City Utilities Tunnel,

  • Qatar Education City Utilities Tunnel,

  • Sector : Water

  • Cost : 184 million USD

  • Scope : 9km utility tunnel for Education City services

  • Status: Under construction

  • County : Qatar

  • Client :Qatar Foundation

  • Proposed Completion Date : May-12





Dammam University Tunnel Project,

  • Dammam University Tunnel Project,

  • Sector : Road

  • Cost : 66 million USD

  • Scope : 30km connection between university and hospital

  • Status : Under construction

  • Country : Saudi Arabia

  • Client : Ministry of Higher Education

  • Proposed Completion Date : Oct-13



Riyadh Road Tunnels,

  • Riyadh Road Tunnels,

  • Sector : Road

  • Cost : 55 million USD

  • Scope : Two road tunnels in Riyadh

  • Status : Under construction

  • Country : Saudi Arabia

  • Client : Riyadh Municipality

  • Proposed Completion Date : Apr-14





Muharraq Wastewater Treatment Project,

  • Muharraq Wastewater Treatment Project,

  • Sector : Water

  • Cost : 250 million USD

  • Scope : New facility including 20.9km gravity sewer

  • Status : Under construction

  • Country : Bahrain

  • Client : Muharraq STP Company

  • Proposed Completion Date : Oct-14





Abu Dhabi Step,

  • Abu Dhabi Step,

  • Sector : Water

  • Cost : 1,6 billion USD

  • Scope : 41km water storage tunnel

  • Status: Under construction under three tunnelling packages

  • Country : UAE

  • Client : Abu Dhabi Sewerage Services Co.

  • Proposed Completion Date : Dec 2014



Etihad Rail Project,

  • Etihad Rail Project,

  • Sector : Rail

  • Cost : 11 billion USD

  • Scope : 1,200km network including six tunnels

  • Status : Phase 1 under construction

  • Country : UAE

  • Client : Etihad Rail

  • Proposed Completion Date : Jan-18





Azer Korpu Baku Metro Project,

  • Azer Korpu Baku Metro Project,

  • Sector : Rail

  • Cost : 600 million USD

  • Scope : Under Construction, 12200 m length in total with 6.5 m 2 EPB (1 Herrenknecht, 1 Robbins)

  • Country : Azerbaijan

  • Proposed Completion Date : 2015





Tel Aviv – Jeruselam High Speed Rail Project,

  • Tel Aviv – Jeruselam High Speed Rail Project,

  • Sector : Rail

  • Scope : Under construction, 21000 m length in total, 1 Herrenknecht EPB and 2 double shiled with 10.3 m diameter.

  • City : Tel Aviv

  • Proposed Completion Date : 2015



Tel Aviv Metro Project,

  • Tel Aviv Metro Project,

  • Sector : Rail

  • Cost : 12 billion USD

  • Scope : Under construction, 23 km Red Line with 6.5 m diameter, 35 km Green Line with 6.5 m diameter

  • Country : Israel

  • Client : Metropolitan Mass Transit System Ltd.

  • Proposed Completion Date : 2017



According to growing population and increasing economic

  • According to growing population and increasing economic

  • opportunities in rapidly developing countries, especially

  • infrastructure investments in are gaining more and more

  • importance.

  • In this context, local administrations have been planing to

  • invest more for metro, rail, road, clean and waste water

  • tunnel projects as it is seens in this presentation.

  • As one of the companies that related in TBM industry , we

  • would like to be also one of the solution partners for each

  • single project.







Yüklə 445 b.

Dostları ilə paylaş:




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin