Abyan Assessment Report 8-9 July 2012



Yüklə 1,49 Mb.
səhifə9/49
tarix04.01.2022
ölçüsü1,49 Mb.
#58495
1   ...   5   6   7   8   9   10   11   12   ...   49
3.0 Analysis and Results

Upon completion of the field work, the assessment forms were transferred to Sana’a for data entry into the Assessment and Data Compendium (ADC, Beta V.1.01). The ADC was developed by the ADC Support Team in Pakistan. The ADC is still in its pilot stage and the Abyan MIRA forms were used to pilot the system. This meant considerably delays as problems detected in the system by data entry staff had to be communicated to the Support Team for it to be fixed. The slow internet connection in the OCHA Yemen office in Sana’a also contributed to the considerable delay in data entry. In addition to data entry, the ADC was supposed to generate simple analysis and customized reports from the analysis. The system also provided option for export of data into Excel. Generating a cross tabulation of locations and frequency of responses in a sector took considerable time making the system very slow. The alternative was to exporting the raw data into Excel where most of the analysis was done.


The following paragraphs detail the collated returns from the survey teams and the subsequent analysis of those returns has identified the acute humanitarian needs with regards to the level and type of humanitarian response required to meet those needs.


Yüklə 1,49 Mb.

Dostları ilə paylaş:
1   ...   5   6   7   8   9   10   11   12   ...   49




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin